US20050002741A1 - Apparatus and method for dock support or composite piling - Google Patents
Apparatus and method for dock support or composite piling Download PDFInfo
- Publication number
- US20050002741A1 US20050002741A1 US10/449,383 US44938303A US2005002741A1 US 20050002741 A1 US20050002741 A1 US 20050002741A1 US 44938303 A US44938303 A US 44938303A US 2005002741 A1 US2005002741 A1 US 2005002741A1
- Authority
- US
- United States
- Prior art keywords
- piling
- shell
- core
- foam
- space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 39
- 239000002131 composite material Substances 0.000 title description 12
- 239000000463 material Substances 0.000 claims abstract description 42
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 31
- 229920003023 plastic Polymers 0.000 claims abstract description 26
- 239000004033 plastic Substances 0.000 claims abstract description 26
- 238000004519 manufacturing process Methods 0.000 claims abstract description 18
- 230000002745 absorbent Effects 0.000 claims abstract description 9
- 239000002250 absorbent Substances 0.000 claims abstract description 9
- 239000006260 foam Substances 0.000 claims description 34
- 239000002023 wood Substances 0.000 claims description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 238000007789 sealing Methods 0.000 claims description 16
- 239000008188 pellet Substances 0.000 claims description 15
- 239000011152 fibreglass Substances 0.000 claims description 13
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 claims description 11
- 229910052782 aluminium Inorganic materials 0.000 claims description 9
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 9
- 229920001903 high density polyethylene Polymers 0.000 claims description 9
- 239000004700 high-density polyethylene Substances 0.000 claims description 9
- 229910052751 metal Inorganic materials 0.000 claims description 9
- 239000002184 metal Substances 0.000 claims description 9
- 239000007787 solid Substances 0.000 claims description 7
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 claims description 6
- 229920002554 vinyl polymer Polymers 0.000 claims description 6
- 230000015556 catabolic process Effects 0.000 claims description 5
- 238000006731 degradation reaction Methods 0.000 claims description 5
- 125000006850 spacer group Chemical group 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims description 2
- 230000000717 retained effect Effects 0.000 claims 2
- 230000035939 shock Effects 0.000 claims 2
- 239000011343 solid material Substances 0.000 claims 2
- 239000002245 particle Substances 0.000 claims 1
- 230000003028 elevating effect Effects 0.000 abstract description 3
- 239000011162 core material Substances 0.000 description 80
- 238000007689 inspection Methods 0.000 description 8
- 239000000126 substance Substances 0.000 description 8
- AZDRQVAHHNSJOQ-UHFFFAOYSA-N alumane Chemical group [AlH3] AZDRQVAHHNSJOQ-UHFFFAOYSA-N 0.000 description 7
- 230000008901 benefit Effects 0.000 description 7
- 239000004567 concrete Substances 0.000 description 6
- 230000006378 damage Effects 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 230000007547 defect Effects 0.000 description 4
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 239000000945 filler Substances 0.000 description 3
- 239000011358 absorbing material Substances 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 230000004927 fusion Effects 0.000 description 2
- 230000005923 long-lasting effect Effects 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000004224 protection Effects 0.000 description 2
- 150000003839 salts Chemical class 0.000 description 2
- 238000011282 treatment Methods 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910001094 6061 aluminium alloy Inorganic materials 0.000 description 1
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 241001465754 Metazoa Species 0.000 description 1
- 239000004743 Polypropylene Substances 0.000 description 1
- 230000006750 UV protection Effects 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 239000003963 antioxidant agent Substances 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 239000006229 carbon black Substances 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000593 degrading effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 239000004088 foaming agent Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 229920001684 low density polyethylene Polymers 0.000 description 1
- 239000004702 low-density polyethylene Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 229920001296 polysiloxane Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010875 treated wood Substances 0.000 description 1
- 239000010876 untreated wood Substances 0.000 description 1
- 239000004636 vulcanized rubber Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/20—Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/068—Landing stages for vessels
Definitions
- the present invention relates to apparatus and methods for supporting or elevating a structure, and in particular, a support such as a piling or dock support for elevating a dock or other structure in a marine environment.
- Pilings or elongated supports are needed to support structures that extend into the water.
- the supports must extend into the floor of the body of water until they hit bed rock or other sufficient underlying support material.
- footings can be constructed to assist in providing a foundation for the support.
- the top of the piling or support usually extends above water level.
- pilings or supports are widely used, especially in lakes and coastal areas where commercial and recreational water activity is most prominent.
- Treated wood chemicals and/or pressure
- wood remains susceptible, over time, to degradation. Additionally such chemicals and treatments can involve environmentally adverse substances. Therefore, the increase in effective life by such treatments may not be a good trade off.
- Non-wood materials such as concrete, metal, and even solid plastic have been attempted.
- Reinforced concrete is capable of excellent support in compression.
- the cement can erode, chip, or crack.
- the reinforcing re-bar can rust and structural integrity of the concrete piling can fail. This is especially true in marine conditions where the water freezes and thaws. Additionally, concrete is very heavy and thus difficult to maneuver. It also is unforgiving in terms of impact and damage when boats come into abutment with it.
- Tubular steel and aluminum pilings are lighter and more maneuverable.
- metals can degrade. Such degradation and deterioration can release substances into the water that are not environmentally friendly and can cause pollution. Metals are also unforgiving relative to impact.
- Solid plastic pilings have been proposed. They tend to have less structural robustness and higher weight because they are solid.
- a still further object, feature, aspect or advantage of the present invention relates to a method of supporting a dock or other structure.
- a still further object, feature, aspect or advantage of the present invention involves a method of manufacturing a dock support or piling.
- An apparatus includes an inner core made of structural support material.
- An outer plastic shell is adapted to surround a portion of the inner core with space inbetween.
- An impact absorbent intermediate material fills the space between inner core and outer shell.
- a sealing member deters entry of water or substances into the space between inner core and outer shell.
- a method of making a piling or support comprises selecting a length of core or structural material, placing a plastic outer shell surrounding and spaced from a selected portion of the core filling at least a portion of the space with impact absorbing material, and sealing the space from the environment.
- One aspect of the invention involves utilizing pelletized material as the impact absorbent material. It is placed between the core and shell and packed or tamped in a manner to spread it uniformly across the cross-section of the composite structure.
- the composite structure can be assembled by placing a first layer of impact absorbent substance near the bottom of the core and shell and compacting it, then placing as many succeeding layers as are needed to reach the top of the space between core and shell.
- blocks or gaskets can be placed between layers.
- FIG. 1 is an enlarged sectional view taken along line 1 - 1 of FIG. 2A , illustrating one embodiment of a piling for a dock support according to the present invention.
- FIG. 2A is a simplified perspective view of a dock supported by a plurality of pilings of FIG. 1 .
- FIG. 2B is a side elevation of FIG. 2A .
- FIG. 4 is a sectional view taken along line 4 - 4 of FIG. 1 .
- FIG. 5 is an isolated enlarged view taken along line 5 - 5 of FIG. 1 .
- FIG. 6 is similar to FIG. 1 showing an alternative exemplary embodiment according to the present invention.
- FIG. 7 is a cross-sectional view of an alternative embodiment according to the present invention.
- FIG. 8 is a sectional view of a still further alternative embodiment of the present invention.
- the exemplary embodiments will be described in the context of dock supports or pilings used to support the structure needed to support a marine dock.
- the exemplary embodiments will be described in association with docks for residential waterfront properties for sunbathing, fishing, and boarding and unboarding recreational watercraft.
- Such docks usually extend anywhere from 10 feet to 100 feet from the shoreline. Normally, the water level to floor of the body of water rarely exceeds 20 or 30 feet deep. Of course, different dock lengths and water depths are possible.
- FIGS. 1-6 illustrate a piling 2 (this particular embodiment indicated sometimes by reference numeral 2 A) used to support a dock deck 48 above water level.
- a plurality of pilings 2 are positioned in pairs on opposite sides along the length of deck 48 .
- Stringers 44 are bolted to pilings 2 by bolts 46 .
- a sea wall cap 50 can be attached at the distal end of deck 48 (see FIG. 2A ).
- top ends of pilings 2 extend above the level of water 42 . They may or may not extend above the level of deck 48 , but conventional marine grade bolts 46 are inserted through drilled aligned apertures in opposite sides of each piling 2 and then secured to stringers 44 .
- FIG. 2B gives examples of the size of stringers 44 for one embodiment, as well as deck 48 .
- FIGS. 2A and 2B are not drawn to scale, of course, but are diagrammatic in the sense of simply illustrating the finction of pilings 2 relative to a dock.
- the length of pilings 2 is usually anywhere from 8 feet to 40 feet depending on depth of the water and the distance pilings 2 that must be inserted below sea bed level. Average insertion depth below sea bed 40 is around 4 feet. Spacing between pilings 2 is usually between 4 feet and 6 feet for these types of docks.
- FIG. 1 provides details regarding the composite structure of piling 2 A.
- An inner core 10 has an open bottom end 12 and an open top end 14 between a hollow intermediate portion 16 .
- Piling 2 A is tubular (e.g. round in cross-section) steel, 6 to 20 inch O.D. tubing. It could also be aluminum, or fiberglass or other tubular material. As stated, its length can be as desired. Usually it is between 8 feet and 20 feet in length (dimensions A+B in FIG. 1 ).
- the tubing wall can be 1 ⁇ 8 inch and greater thick. The wall thickness of the tubing materials, including but not limited to steel, aluminum and fiberglass, will be determined by use of safe load data for tubing used as columns.
- An outer shell 20 has an open bottom end 22 , open top end 24 , and a hollow intermediate section 26 . It has a 10 to 24 inch O.D. and a 1 ⁇ 4 inch and greater wall thickness.
- One material it could be made from is high-density polyethylene (HDPE) in a round-in-cross-section tube of a length that is on the same order of the length as inner core 10 . It is adapted to concentrically surround a substantial portion of the length of inner core 10 such that there is a space (e.g. approximately 2 inches) between the outside of inner core 10 and the inside of shell 20 .
- HDPE high-density polyethylene
- a steel ring 28 having a center aperture of slightly larger than 8 inches diameter is welded (see welds 29 in FIG. 1 ) towards bottom end 12 of inner core 10 .
- some length of bottom 12 of inner core 10 can be exposed and not covered by shell 20 .
- shell 20 can extend essentially to the bottom of end 12 of inner core 10 , if desired.
- Ring 28 would therefore form a rigid lower stop for shell 20 .
- the outside diameter of ring 28 would be approximately 8-24 inches such that shell 20 could be slid concentrically over inner core 10 and down into abutment with ring 28 .
- a rubber washer seal 32 could be slid down inner core 10 into abutment on the top of ring 28 .
- Seal 32 could be elastomeric and have an inner aperture less than 8 inches diameter and a cross-sectional diameter of more than the space between inner core 10 and shell 20 when positioned as in FIG. 1 .
- the elastomeric nature of seal 32 would allow it to be stretched over and slid down into core 10 into the position of FIG. 1 . It would serve to space the bottom 22 of shell 20 concentrically about inner core 10 and frictionally hold it against upward longitudinal movement.
- fill material 30 is placed in the space between core 10 and shell 20 .
- fill 30 is a pelletized rubber with the average diameter of the pellets being less than the cross-sectional thickness of space between core 10 and shell 20 .
- pelletized recycled rubber 30 would substantially fill up the space.
- a top seal 34 (here in the nature of an elastomeric O-ring) could optionally be positioned as shown in FIG. 1 .
- O-ring 34 would deter movement of the rubber pellets 30 out of the space.
- a piling cap 38 could be fit over the top of piling 2 .
- a seal e.g. silicone or other caulking
- inner core 10 can extend slightly (e.g. one inch) above shell 20 and serve as a stop against downward movement of cap 38 when installed, or as a forgiving surface for installation hammering.
- Cap 38 can be metal, plastic, or other materials. These types of caps are available from conventional marine supply stores.
- Piling 2 A of FIG. 1 therefore is a composite structure in the sense it combines a structural material core 10 , an outer shell 20 of impact absorbing, impact resistant material, and an intermediate layer of impact absorbing material. Any boat or watercraft that impacts the exterior of piling 2 A would at least come against a relatively nonabrasive, somewhat flexible outer shell of impact absorbent material 20 . Any substantial impact would be partially absorbed and partially transferred to thicker impact absorbent layer 30 .
- the inner structural core 10 is substantially rigid and therefore layers 20 and 30 are intended to shield core 10 from as much impact as possible.
- composite piling 2 is economical to manufacture and therefore can be sold at a relatively low price.
- FIG. 1 As well as FIGS. 3, 4 and 5 , a method of assembling piling 2 A will now be described.
- the length of inner core 10 would be selected. Obviously, a standardized or set of standardized lengths of cores 10 could be selected and an inventory built up for those standardized lengths for manufacturing or purchasing economies.
- Corresponding shells 20 of lengths less than those of core 10 can be manufactured by conventional molding or extrusion processes (or cutting from stock) to create the tubular shells 10 of the desired materials.
- One advantage of using HDPE is it could be made of recycled plastic, making it more economical and better for the general environment.
- Plastic can be engineered to have desired properties (impact resistance, impact absorbability, UV resistance, fluid impermeability, etc.).
- the inside diameters of the shell can also be engineered to choice leaving a space of desired volume when concentrically positioned over core 10 .
- a ring 28 can be welded or otherwise fixed at a desired position near the end 12 of core 10 .
- the lower rubber washer seal 32 could be positioned as shown in FIGS. 1 and 3 .
- Piling 2 A can be up to tens of feet long (e.g. 40 feet).
- Shell 20 would be positioned concentrically over core 10 and recycled rubber pellet fill 30 is poured into the space until it fills up approximately one foot above recycled rubber washer seal 32 .
- all the rubber components of the apparatus could be recycled rubber.
- the pelletized rubber could be tamped down to compress it so the pellets are packed together as much as possible.
- a first recycled rubber gasket 36 A can then be moved down the outside of core 10 over the first foot of pelletized fill 30 to retain that fill and to create a spacer to hold shell 20 concentrically from core 10 .
- a next one to three feet of fill 30 could be poured in, tamped and covered with a succeeding gasket 36 B (see FIG. 3 ). These steps could be repeated for each succeeding one to three feet until near the top of shell 20 .
- the spacing of washers will be calculated by dividing the overall length into segments to provide uniformity. Whatever remaining distance exists, fill 30 can be poured in, tamped, and then topped by a top washer or O-ring 34 or other sealing mechanism.
- top washers 34 (here 34 A, B, C, and D) at the top of the space between core 10 and shell 20 to provide a more substantial block against movement of fill 30 upwardly and to have a more robust structure at that position.
- cap 38 can be attached and sealed. Piling 2 A would then be completed and ready to install in the water. Cap 38 is, however, optional.
- piling 2 A would still be relatively lightweight (at least compared to wood or concrete) and relatively easy to maneuver.
- shell 20 When installed, shell 20 shields inner core 10 from water or organisms that could try to attach or degrade core 10 by nature of the properties of the plastic.
- the composite structure presents a buffer between core 10 and watercraft.
- the relatively economical composite structure presents the ability for aesthetic or functional additions. Examples include color, indicia (e.g., designs, instructions or words or letters), and texturing.
- Utilization of O-rings or washers 32 , 36 , and 34 is a relatively inexpensive way of assuring concentric positioning of shell 20 on core 10 .
- Pelletized recycled rubber 30 is an inexpensive yet highly effective, long-lasting pile.
- the composite structure also has no environmentally adverse substances inside the structure that could interface with the water.
- pellets 30 can be varied.
- the ability to vary these factors is improved because the fill 30 will basically be isolated or insulated from the water by shell 20 and sealing members such as O-rings 32 , 34 and 36 , and/or cap 38 .
- FIG. 7 shows an alternative composite piling 2 B according to the present invention.
- Piling 2 B is similar to piling 2 A in that it has an inner structural core lOB, an outer plastic shell 20 and an intermediate fill 31 .
- core lOB is a solid wood pole instead of a tubular metal core of FIG. 1 .
- the wood is not pressure treated as it is encapsulated and not exposed to the environment.
- fill 31 is expandable urethane foam, instead of pelletized material of FIG. 1 .
- This combination provides similar advantages of insulating wood core lOB from water or degrading organisms and provides an impact-absorbing function by virtue of plastic HDPE 10 inch outside diameter shell 20 and expandable urethane fill 31 (one inch minimum).
- foam 31 is that it could be economically injected into the space between core 10 B and shell 20 along the length of structure 2 B. Washers 32 , 34 , and/or 36 may or may not be needed.
- the shell 20 can be maintained concentric (see, e.g., manufacturing procedure SDS # 101 , described later), the washers may not be needed as the urethane foam, when set up, hardens to a relatively firm consistency yet retains impact absorbing ability and some resiliency.
- FIG. 8 illustrates a still further exemplary embodiment of a piling 2 C.
- Piling 2 C is similar to piling 2 B of FIG. 7 except instead of a wood core, a fiberglass tube core lOC is utilized inside of expandable urethane foam filler 31 and HDPE tubing shell 20 .
- the foam once cured, can reinforce the tubular wall of the core.
- the length of pilings 2 must be selected. The lengths can vary for pilings for each dock. Stringers 44 can be attached by bolts 46 by well-known methods which are well within the skill of those skilled in the art. Standard marine construction is bolted through. Preferably, only stainless steel bots, nuts, and washers are used. Necessary holes can be drilled relatively easily with commonly available tools.
- deck 48 can be added to stringers 44 . If desired, sea wall cap 50 or other structures can also be added.
- Shell 20 can be HDPE with the following composition (and percentage by weight): low density polyethylene between 20% and 25%; high density polyethylene 35% to 45%; polypropylene 35% to 45%; additives—carbon black 2%, foaming agent, emulsifies and antioxidants, as required for suitable extrusion of plastic pipe for use in a marine environment.
- shell 20 could be vinyl.
- Inner core 10 can be hot formed structural carbon steel (ASTM A 501); 58,000 psi tensile strength; 36,000 psi yield, Brinell hardness 121 on the (B scale), minimum wall thickness of one eighth inch and greater to suit application and loading. As stated earlier, the material and material dimensions and characteristics can be selected according to need or desire.
- tubular core 10 could be made of marine grade 6061 aluminum conforming to federal specification QQ-A-250/11 (formally QQ-A-327). If fiberglass, tubular core 10 could be glass reinforced polyester continuous formed tubing having a high strength to weight ratio, a good dimensional stability and resistant to weather and chemical corrosion.
- core shapes, materials, configurations, and characteristics are possible.
- a round-in-cross-section tubular or solid core it can be made of other cross-section shapes (e.g. triangular, rectangular or square, other polygons). It could also be made of other structural shapes, such as an I-beam, H-beam, or other structural cross-section, especially with expandable foam embodiments.
- round outside perimeter of the core is best for the embodiments using a pelletized fill between core and outer shell.
- the expanding foam embodiments are better suited for cores like wood or fiberglass than steel or aluminum. Also, rubber washers or O-Rings are probably not necessary with expanded foam embodiments.
- Rubber pellet fill 30 could be recycled rubber pellets that ground up recycled rubber tires with mesh size of pellets to be altered to accommodate design requirements. Pellets will provide the filler and cushion between the recycled rubber washers or O-rings and the outer shell and core.
- Washers or O-rings 32 , 34 , 36 can be recycled or vulcanized rubber with a durometer of 70 and approximately one-inch in cross-section.
- parts 32 , 34 , and 36 are either all O-rings, or all washers.
- a ring washer 28 could be stamped from sheet material.
- Plastic shell 20 can have texturing that simulates natural elements.
- the texturing could also be arbitrary or include thinner and thicker areas. It could also include molded end or extruded indicia such as numbers or letters. Plastic of shell 20 could also be colored to different colors.
- one option that could be used for both wood and fiberglass core pilings include Suremix 6000 or equal expandable foam urethane available from commercial sources. It has a working time of 10 minutes, handling strength in 10 minutes, and full cure time of one hour. When cured it has a tensile strength of 2,000 and an elongation of 10%. Another example would be rigid urethane foams of two component expanding system. These tend to be very strong and durable and can add structural strength and resist tearing and compression set. These types of foams are commercially available and can be formulated to add structural strength as an encapsulation material. They have double the working time and fully cure in about two hours compared to the previously described optional expandable foam. When cured, it has a strength similar to the first option expandable foam.
- pilings 2 described above promote longer effective life of the pilings than traditional wooden, concrete, steel based pilings, are environmentally friendly, and are forgiving and impact absorbing for all watercraft and other water carrying objects.
- the plastic also resists attachment of marine organisms and animals as well as resists attachment of ice, which can cause damage by heaving.
- Pilings 2 tend to be lighter weight, safer and easier to handle, install, maintain, and modify than traditional pilings, and in some embodiments use recycled plastic and rubber.
- the inner core can be selected for adequate structural integrity and robustness whereas the outer shell can be selected for aesthetic or decorative features.
- Pilings 2 can be manufactured to length. Mounting holes for stringers or the like could be pre-manufactured or made during installation.
- the mounting bolts could have sealing gaskets or otherwise be sealed, but this may not be necessary because they are above normal water line. Caulking or sealing gaskets could be used on opposite sides of the bolt to prevent water from entering.
- the composite structures can be drilled or cut with conventional tools.
- the outer plastic shell could include sizes bigger than 10 inches. Sizes up to 18 inches or more are included.
- Pilings 2 as above described are economical and therefore can multiply savings in cost not only for the original pilings, but increased durability would delay maintenance and replacement over the years.
- Shell 20 could have other cross-sectional shapes such as square, 10 inch plastic tubing with one quarter inch wall thickness. Core 10 could also have different cross-sectional shapes.
- the assembly should be visually inspected for appearance, and stored for shipment.
- the Steel and Aluminum core pilings will be offered with a pointed tip (e.g. see ref. no. 3 at FIG. 2B ) (when the site dictates the piles must be driven not jetted into place), the welded pointed tip will seal the pile.
- steel plates in an “x” pattern could be welded or attached to the bottom of the core to assist driving the piling into the sea bed.
Abstract
A piling and method of making same for elevating or supporting a structure such as a dock in marine environments. An inner core structural support material is surrounded by an outer impact absorbing water impervious plastic shell with an impact absorbent fill between shell and inner core. The shell is sealed to the core.
Description
- A. Field of the Invention
- The present invention relates to apparatus and methods for supporting or elevating a structure, and in particular, a support such as a piling or dock support for elevating a dock or other structure in a marine environment.
- B. Problems in the Art
- Pilings or elongated supports are needed to support structures that extend into the water. The supports must extend into the floor of the body of water until they hit bed rock or other sufficient underlying support material. Alternatively or in addition, footings can be constructed to assist in providing a foundation for the support. The top of the piling or support usually extends above water level.
- These types of pilings or supports are widely used, especially in lakes and coastal areas where commercial and recreational water activity is most prominent.
- Many factors are relevant to selection of these pilings. Durability is almost universally desirable. However, especially for individuals, cost is very important. For example, the owner of a small waterfront vacation property cannot afford expensive commercial-grade pilings to support a dock.
- Maneuverability is also important, especially for those lacking industrial equipment, such as “do-it-yourselfers”.
- Environmental issues are also important, and increasingly so.
- Traditionally, natural wood has been used as pilings. However, as is widely known, even wood that is naturally resistant to the effects of water degrades over time. They also tend to be heavy because they are usually solid. Their relatively low cost, along with the ability to manufacture them a variety of lengths without substantial cost, has made them a conventional choice over the years.
- Although the effective life of such pilings can still be years, the fact that they are susceptible to degradation by the elements and wood attacking organisms can greatly reduce their effective life. The expense and resources required to replace them is substantial.
- Many attempts have been made to improve upon untreated wood pilings for marine use. Treated wood (chemicals and/or pressure) can slow down decay. However, wood remains susceptible, over time, to degradation. Additionally such chemicals and treatments can involve environmentally adverse substances. Therefore, the increase in effective life by such treatments may not be a good trade off.
- Non-wood materials such as concrete, metal, and even solid plastic have been attempted. Reinforced concrete is capable of excellent support in compression. However, like wood, over a large span of time it is susceptible to degradation. The cement can erode, chip, or crack. The reinforcing re-bar can rust and structural integrity of the concrete piling can fail. This is especially true in marine conditions where the water freezes and thaws. Additionally, concrete is very heavy and thus difficult to maneuver. It also is unforgiving in terms of impact and damage when boats come into abutment with it.
- Tubular steel and aluminum pilings are lighter and more maneuverable. However, over long periods of time, especially in salt water environments, metals can degrade. Such degradation and deterioration can release substances into the water that are not environmentally friendly and can cause pollution. Metals are also unforgiving relative to impact.
- Solid plastic pilings have been proposed. They tend to have less structural robustness and higher weight because they are solid.
- Several attempts have been made to create a shell to place around the structural support to try to protect it. These tend to be temporary fixes as it is difficult to get good, waterproof, long-lasting fit and attachment.
- Despite all of the activity in developing different types of pilings of this nature, there remains room for improvement in the art.
- It is therefore a primary object, feature, aspect or advantage of the present invention to provide a dock support or piling which improves or solves problems and deficiencies in the art.
- Additional objects, features, aspects, and advantages of the present invention include a dock piling or support which:
-
- a) provide impact absorption and resistance properties;
- b) provide an outer interface that is less likely to provide damage to the exterior of boats and other watercraft if they come into abutment with it;
- c) promotes durability and long effective life, including resistance to environmental factors;
- d) is environmentally friendly;
- e) enhances safety;
- f) is easy to handle and manipulate;
- g) is easy to install and maintain;
- h) is easy and economical to manufacture and assemble;
- i) can be customized and adapted to a variety of needs;
- j) is adaptable to different decorative appearances and configurations;
- k) can be retrofitted or originally manufactured; and
- l) can be applied in a variety of different configurations.
- A still further object, feature, aspect or advantage of the present invention relates to a method of supporting a dock or other structure.
- A still further object, feature, aspect or advantage of the present invention involves a method of manufacturing a dock support or piling.
- These and other objects, features, and advantages of the present invention will become more apparent with reference to the accompanying specification and claims.
- An apparatus according to the invention includes an inner core made of structural support material. An outer plastic shell is adapted to surround a portion of the inner core with space inbetween. An impact absorbent intermediate material fills the space between inner core and outer shell. A sealing member deters entry of water or substances into the space between inner core and outer shell.
- In another aspect of the invention, a method of making a piling or support comprises selecting a length of core or structural material, placing a plastic outer shell surrounding and spaced from a selected portion of the core filling at least a portion of the space with impact absorbing material, and sealing the space from the environment.
- One aspect of the invention involves utilizing pelletized material as the impact absorbent material. It is placed between the core and shell and packed or tamped in a manner to spread it uniformly across the cross-section of the composite structure.
- In another aspect, the composite structure can be assembled by placing a first layer of impact absorbent substance near the bottom of the core and shell and compacting it, then placing as many succeeding layers as are needed to reach the top of the space between core and shell. Optionally, blocks or gaskets can be placed between layers.
-
FIG. 1 is an enlarged sectional view taken along line 1-1 ofFIG. 2A , illustrating one embodiment of a piling for a dock support according to the present invention. -
FIG. 2A is a simplified perspective view of a dock supported by a plurality of pilings ofFIG. 1 . -
FIG. 2B is a side elevation ofFIG. 2A . -
FIG. 3 is a simplified view of one complete piling ofFIG. 1 . -
FIG. 4 is a sectional view taken along line 4-4 ofFIG. 1 . -
FIG. 5 is an isolated enlarged view taken along line 5-5 ofFIG. 1 . -
FIG. 6 is similar toFIG. 1 showing an alternative exemplary embodiment according to the present invention. -
FIG. 7 is a cross-sectional view of an alternative embodiment according to the present invention. -
FIG. 8 is a sectional view of a still further alternative embodiment of the present invention. - The invention can take many forms and embodiments. In order to provide a better understanding of the invention, several exemplary embodiments will now be described in detail.
- Frequent reference will be taken to the accompanying drawings. Reference numbers will be used to indicate certain parts and locations in the drawings. The same reference numbers will be used to indicate the same parts and locations throughout the drawings, unless otherwise indicated.
- The exemplary embodiments will be described in the context of dock supports or pilings used to support the structure needed to support a marine dock. In particular, the exemplary embodiments will be described in association with docks for residential waterfront properties for sunbathing, fishing, and boarding and unboarding recreational watercraft. Such docks usually extend anywhere from 10 feet to 100 feet from the shoreline. Normally, the water level to floor of the body of water rarely exceeds 20 or 30 feet deep. Of course, different dock lengths and water depths are possible.
- In particular, this description will assume docks are placed in salt water along a coastal area.
-
FIGS. 1-6 illustrate a piling 2 (this particular embodiment indicated sometimes byreference numeral 2A) used to support adock deck 48 above water level. A plurality ofpilings 2 are positioned in pairs on opposite sides along the length ofdeck 48.Stringers 44 are bolted topilings 2 bybolts 46. Optionally asea wall cap 50 can be attached at the distal end of deck 48 (seeFIG. 2A ). - As can be seen in
FIG. 2A , conventionally, top ends ofpilings 2 extend above the level ofwater 42. They may or may not extend above the level ofdeck 48, but conventionalmarine grade bolts 46 are inserted through drilled aligned apertures in opposite sides of each piling 2 and then secured to stringers 44. - As indicated at
FIG. 2B , the lower ends ofpilings 2 are conventionally buried into thesea bed 40 and supported in a manner such as are known in the art. Further discussion of the same will therefore not be given here.FIG. 2B gives examples of the size ofstringers 44 for one embodiment, as well asdeck 48. TheFIGS. 2A and 2B are not drawn to scale, of course, but are diagrammatic in the sense of simply illustrating the finction ofpilings 2 relative to a dock. - The length of
pilings 2 is usually anywhere from 8 feet to 40 feet depending on depth of the water and thedistance pilings 2 that must be inserted below sea bed level. Average insertion depth belowsea bed 40 is around 4 feet. Spacing betweenpilings 2 is usually between 4 feet and 6 feet for these types of docks. -
FIG. 1 provides details regarding the composite structure of piling 2A. Aninner core 10 has an openbottom end 12 and an opentop end 14 between a hollowintermediate portion 16.Piling 2A is tubular (e.g. round in cross-section) steel, 6 to 20 inch O.D. tubing. It could also be aluminum, or fiberglass or other tubular material. As stated, its length can be as desired. Usually it is between 8 feet and 20 feet in length (dimensions A+B inFIG. 1 ). The tubing wall can be ⅛ inch and greater thick. The wall thickness of the tubing materials, including but not limited to steel, aluminum and fiberglass, will be determined by use of safe load data for tubing used as columns. Example: The live load in lbs/ft2 for both steel and aluminum was taken from Ryerson Data Book, such as is well known and available. For example, a 6 inch diameter steel tube with a ⅛ inch wall thickness and 20 feet long will support 31 KIPS or 31,000 lbs. concentrated load. Such material is “structural” for this capacity, meaning that it is adequate for the various forces that will be placed on it in normal use as a dock support. Such material is also readily available in a variety of lengths from a variety of commercial vendors and manufacturers. It is relatively inexpensive. It is also relatively light-weight and manipulatable, even by an individual. - An
outer shell 20 has an openbottom end 22, opentop end 24, and a hollowintermediate section 26. It has a 10 to 24 inch O.D. and a ¼ inch and greater wall thickness. One material it could be made from is high-density polyethylene (HDPE) in a round-in-cross-section tube of a length that is on the same order of the length asinner core 10. It is adapted to concentrically surround a substantial portion of the length ofinner core 10 such that there is a space (e.g. approximately 2 inches) between the outside ofinner core 10 and the inside ofshell 20. - A
steel ring 28 having a center aperture of slightly larger than 8 inches diameter is welded (seewelds 29 inFIG. 1 ) towardsbottom end 12 ofinner core 10. As indicated inFIGS. 1 and 2 B, some length ofbottom 12 ofinner core 10 can be exposed and not covered byshell 20. For example, approximately 3 feet can be exposed as it is not needed for protection against water or will be set into a concrete footing or other footing. However,shell 20 can extend essentially to the bottom ofend 12 ofinner core 10, if desired. -
Ring 28 would therefore form a rigid lower stop forshell 20. The outside diameter ofring 28 would be approximately 8-24 inches such thatshell 20 could be slid concentrically overinner core 10 and down into abutment withring 28. Before seatingshell 20 on top ofring 28, arubber washer seal 32 could be slid downinner core 10 into abutment on the top ofring 28.Seal 32 could be elastomeric and have an inner aperture less than 8 inches diameter and a cross-sectional diameter of more than the space betweeninner core 10 andshell 20 when positioned as inFIG. 1 . The elastomeric nature ofseal 32 would allow it to be stretched over and slid down intocore 10 into the position ofFIG. 1 . It would serve to space the bottom 22 ofshell 20 concentrically aboutinner core 10 and frictionally hold it against upward longitudinal movement. - A
fill material 30 is placed in the space betweencore 10 andshell 20. In this exemplary embodiment, fill 30 is a pelletized rubber with the average diameter of the pellets being less than the cross-sectional thickness of space betweencore 10 andshell 20. As illustrated inFIGS. 4 and 5 , pelletizedrecycled rubber 30 would substantially fill up the space. - A top seal 34 (here in the nature of an elastomeric O-ring) could optionally be positioned as shown in
FIG. 1 . O-ring 34 would deter movement of therubber pellets 30 out of the space. - A piling
cap 38 could be fit over the top of piling 2. As indicated atreference numerals 39, a seal (e.g. silicone or other caulking) could sealcap 38 to shell 30 and prevent water from entering into the tops 14 or 24 ofinner core 10 orouter shell 20. As shown inFIG. 1 ,inner core 10 can extend slightly (e.g. one inch) aboveshell 20 and serve as a stop against downward movement ofcap 38 when installed, or as a forgiving surface for installation hammering.Cap 38 can be metal, plastic, or other materials. These types of caps are available from conventional marine supply stores. - An example of a manufacturing/assembly process for this embodiment is set forth at SDS Manufacturing procedure #102, later in this description.
- Piling 2A of
FIG. 1 therefore is a composite structure in the sense it combines astructural material core 10, anouter shell 20 of impact absorbing, impact resistant material, and an intermediate layer of impact absorbing material. Any boat or watercraft that impacts the exterior of piling 2A would at least come against a relatively nonabrasive, somewhat flexible outer shell of impactabsorbent material 20. Any substantial impact would be partially absorbed and partially transferred to thicker impactabsorbent layer 30. The innerstructural core 10 is substantially rigid and therefore layers 20 and 30 are intended to shield core 10 from as much impact as possible. - But further,
composite piling 2 is economical to manufacture and therefore can be sold at a relatively low price. By reference toFIG. 1 , as well asFIGS. 3, 4 and 5, a method of assemblingpiling 2A will now be described. - As previously discussed, the length of
inner core 10 would be selected. Obviously, a standardized or set of standardized lengths ofcores 10 could be selected and an inventory built up for those standardized lengths for manufacturing or purchasing economies. Correspondingshells 20 of lengths less than those ofcore 10 can be manufactured by conventional molding or extrusion processes (or cutting from stock) to create thetubular shells 10 of the desired materials. One advantage of using HDPE is it could be made of recycled plastic, making it more economical and better for the general environment. Plastic can be engineered to have desired properties (impact resistance, impact absorbability, UV resistance, fluid impermeability, etc.). The inside diameters of the shell can also be engineered to choice leaving a space of desired volume when concentrically positioned overcore 10. - A
ring 28 can be welded or otherwise fixed at a desired position near theend 12 ofcore 10. The lowerrubber washer seal 32 could be positioned as shown inFIGS. 1 and 3 . -
Piling 2A can be up to tens of feet long (e.g. 40 feet).Shell 20 would be positioned concentrically overcore 10 and recycled rubber pellet fill 30 is poured into the space until it fills up approximately one foot above recycledrubber washer seal 32. Although not required, all the rubber components of the apparatus could be recycled rubber. Using a long tool, the pelletized rubber could be tamped down to compress it so the pellets are packed together as much as possible. A firstrecycled rubber gasket 36A can then be moved down the outside ofcore 10 over the first foot of pelletized fill 30 to retain that fill and to create a spacer to holdshell 20 concentrically fromcore 10. A next one to three feet offill 30 could be poured in, tamped and covered with a succeedinggasket 36B (seeFIG. 3 ). These steps could be repeated for each succeeding one to three feet until near the top ofshell 20. The spacing of washers will be calculated by dividing the overall length into segments to provide uniformity. Whatever remaining distance exists, fill 30 can be poured in, tamped, and then topped by a top washer or O-ring 34 or other sealing mechanism. - As indicated at
FIG. 6 , in some cases it may be desirable to stack several top washers 34 (here 34A, B, C, and D) at the top of the space betweencore 10 andshell 20 to provide a more substantial block against movement offill 30 upwardly and to have a more robust structure at that position. Once fill 30 has been completed,cap 38 can be attached and sealed.Piling 2A would then be completed and ready to install in the water.Cap 38 is, however, optional. - Even when assembled (shown diagrammatically at
FIG. 3 ), piling 2A would still be relatively lightweight (at least compared to wood or concrete) and relatively easy to maneuver. - When installed,
shell 20 shieldsinner core 10 from water or organisms that could try to attach or degradecore 10 by nature of the properties of the plastic. The composite structure presents a buffer betweencore 10 and watercraft. - Additionally, the relatively economical composite structure presents the ability for aesthetic or functional additions. Examples include color, indicia (e.g., designs, instructions or words or letters), and texturing.
- Utilization of O-rings or
washers shell 20 oncore 10. Pelletizedrecycled rubber 30 is an inexpensive yet highly effective, long-lasting pile. - The composite structure also has no environmentally adverse substances inside the structure that could interface with the water.
- The amount of tamping or compression of
pellets 30, and their size, shape, and material, can be varied. The ability to vary these factors is improved because thefill 30 will basically be isolated or insulated from the water byshell 20 and sealing members such as O-rings cap 38. -
FIG. 7 shows an alternativecomposite piling 2B according to the present invention. Piling 2B is similar to piling 2A in that it has an inner structural core lOB, an outerplastic shell 20 and anintermediate fill 31. The differences are that core lOB is a solid wood pole instead of a tubular metal core ofFIG. 1 . The wood is not pressure treated as it is encapsulated and not exposed to the environment. Additionally, fill 31 is expandable urethane foam, instead of pelletized material ofFIG. 1 . This combination provides similar advantages of insulating wood core lOB from water or degrading organisms and provides an impact-absorbing function by virtue ofplastic HDPE 10 inch outsidediameter shell 20 and expandable urethane fill 31 (one inch minimum). - The nature of
foam 31 is that it could be economically injected into the space betweencore 10B andshell 20 along the length ofstructure 2B.Washers shell 20 can be maintained concentric (see, e.g., manufacturing procedure SDS #101, described later), the washers may not be needed as the urethane foam, when set up, hardens to a relatively firm consistency yet retains impact absorbing ability and some resiliency. -
FIG. 8 illustrates a still further exemplary embodiment of a piling 2C. Piling 2C is similar to piling 2B ofFIG. 7 except instead of a wood core, a fiberglass tube core lOC is utilized inside of expandableurethane foam filler 31 andHDPE tubing shell 20. The foam, once cured, can reinforce the tubular wall of the core. - Installation of any of the
pilings 2 has been generally described above. The length ofpilings 2 must be selected. The lengths can vary for pilings for each dock.Stringers 44 can be attached bybolts 46 by well-known methods which are well within the skill of those skilled in the art. Standard marine construction is bolted through. Preferably, only stainless steel bots, nuts, and washers are used. Necessary holes can be drilled relatively easily with commonly available tools. - Election of color, exterior texture, cap (or not), and other functional or decorative features can be possible with
pilings 2. - Once installed with
stringers 44,deck 48 can be added tostringers 44. If desired,sea wall cap 50 or other structures can also be added. - The foregoing exemplary embodiments are intended to provide illustrations of just a few forms the invention can take and are not made by way of limitation. The scope and boundaries of the invention are defined solely by the claims.
- Variations obvious to those skilled in the art will be included within the invention. For example, the exact dimensions, size and shape of the components can vary.
- Additionally, the materials utilized can vary. Specific examples that could be used with the aforementioned embodiments are as follows. These are by example only and not by way of limitation.
-
Shell 20 can be HDPE with the following composition (and percentage by weight): low density polyethylene between 20% and 25%; high density polyethylene 35% to 45%; polypropylene 35% to 45%; additives—carbon black 2%, foaming agent, emulsifies and antioxidants, as required for suitable extrusion of plastic pipe for use in a marine environment. Alternatively,shell 20 could be vinyl. -
Inner core 10 can be hot formed structural carbon steel (ASTM A 501); 58,000 psi tensile strength; 36,000 psi yield, Brinell hardness 121 on the (B scale), minimum wall thickness of one eighth inch and greater to suit application and loading. As stated earlier, the material and material dimensions and characteristics can be selected according to need or desire. - Alternatively,
tubular core 10 could be made of marine grade 6061 aluminum conforming to federal specification QQ-A-250/11 (formally QQ-A-327). If fiberglass,tubular core 10 could be glass reinforced polyester continuous formed tubing having a high strength to weight ratio, a good dimensional stability and resistant to weather and chemical corrosion. - Other core shapes, materials, configurations, and characteristics are possible. For example, instead of a round-in-cross-section tubular or solid core, it can be made of other cross-section shapes (e.g. triangular, rectangular or square, other polygons). It could also be made of other structural shapes, such as an I-beam, H-beam, or other structural cross-section, especially with expandable foam embodiments. It is believed that round outside perimeter of the core is best for the embodiments using a pelletized fill between core and outer shell. Furthermore, it is believed the expanding foam embodiments are better suited for cores like wood or fiberglass than steel or aluminum. Also, rubber washers or O-Rings are probably not necessary with expanded foam embodiments.
- Rubber pellet fill 30 could be recycled rubber pellets that ground up recycled rubber tires with mesh size of pellets to be altered to accommodate design requirements. Pellets will provide the filler and cushion between the recycled rubber washers or O-rings and the outer shell and core.
- Washers or O-
rings parts ring washer 28 could be stamped from sheet material. - The exemplary embodiments have been described regarding a dock support or piling. Other support functions are possible including in non-marine environments where protection of the core from environmental conditions or some impact is desirable.
-
Plastic shell 20 can have texturing that simulates natural elements. The texturing could also be arbitrary or include thinner and thicker areas. It could also include molded end or extruded indicia such as numbers or letters. Plastic ofshell 20 could also be colored to different colors. - For the embodiments utilizing an expandable foam filler, one option that could be used for both wood and fiberglass core pilings include Suremix 6000 or equal expandable foam urethane available from commercial sources. It has a working time of 10 minutes, handling strength in 10 minutes, and full cure time of one hour. When cured it has a tensile strength of 2,000 and an elongation of 10%. Another example would be rigid urethane foams of two component expanding system. These tend to be very strong and durable and can add structural strength and resist tearing and compression set. These types of foams are commercially available and can be formulated to add structural strength as an encapsulation material. They have double the working time and fully cure in about two hours compared to the previously described optional expandable foam. When cured, it has a strength similar to the first option expandable foam.
- It can therefore be seen that
different pilings 2 described above promote longer effective life of the pilings than traditional wooden, concrete, steel based pilings, are environmentally friendly, and are forgiving and impact absorbing for all watercraft and other water carrying objects. The plastic also resists attachment of marine organisms and animals as well as resists attachment of ice, which can cause damage by heaving. -
Pilings 2 tend to be lighter weight, safer and easier to handle, install, maintain, and modify than traditional pilings, and in some embodiments use recycled plastic and rubber. The inner core can be selected for adequate structural integrity and robustness whereas the outer shell can be selected for aesthetic or decorative features. -
Pilings 2 can be manufactured to length. Mounting holes for stringers or the like could be pre-manufactured or made during installation. The mounting bolts could have sealing gaskets or otherwise be sealed, but this may not be necessary because they are above normal water line. Caulking or sealing gaskets could be used on opposite sides of the bolt to prevent water from entering. The composite structures can be drilled or cut with conventional tools. - The outer plastic shell could include sizes bigger than 10 inches. Sizes up to 18 inches or more are included.
- A typical
small dock 8 feet wide by 25 feet long requires on the order of 12 pilings.Pilings 2 as above described are economical and therefore can multiply savings in cost not only for the original pilings, but increased durability would delay maintenance and replacement over the years. -
Shell 20 could have other cross-sectional shapes such as square, 10 inch plastic tubing with one quarter inch wall thickness.Core 10 could also have different cross-sectional shapes. - When using expandable urethane foam, as is known in the art, when inserting the foam space for expansion must be left. The urethane will provide air and watertight seal and
bond core 10 to shell 20 together as one-piece. The ends can be capped and sealed if desired. Thecomposite piling 2 with expandable foam is indicated for pilings up to 24 inches in diameter. - Different manufacturing/assembly procedures for different embodiments can be used. Some examples, for illustration, are set forth below.
- SDS Manufacturing Procedure #102.
- 1.0 Purpose
-
- Manufacturing procedure for (Steel and Aluminum core pilings).
- This procedure shall establish guide lines for the manufacture of Steel and
- Aluminum core marine pilings.
- 2.0 Scope
-
- 2.1 All Steel and Aluminum core, plastic H.D.P.E. or Vinyl encased marine pilings manufactured.
- 3.0 Inspection procedure
-
- 3.1 Inspection of exterior tubing shell (H.D.P.E. or Vinyl).
- 3.1.1 Check O.D., I.D., and length to specification. Inspect O.D. for surface blemishes, cracking, and shipping damage.
- 3.2 Inspection of Rubber O-Rings or recycled rubber gaskets.
- 3.2.1 Check I.D., O.D., and cross-section to specification.
- Visually inspect surfaces for blemishes, pinholes, or any defects that would prevent the gasket from creating a leak tight seal when assembled.)
- 3.3 Inspection of Steel and Aluminum tubing (core material):
- 3.3.1 Inspect for dimensional compliance to specification. The surface will be inspected for blemishes that would prevent a leak tight seal between core O.D. and the Gasket I.D. when assembled.
- 3.1 Inspection of exterior tubing shell (H.D.P.E. or Vinyl).
- Check straightness over its length, and other defects that would affect structural integrity.
-
- 4.0 Assembly Procedure
- 4.1 The core tubing will be inserted into the outer shell, the bottom washer or O-Ring would be installed; this will center the core in the outer tubing. The pieces will then be stood on end and the top of the core centered to the outer shell and held in place with a clamp. The recycled rubber pellets will then be poured into the void in a pre-measured amount to provide designed spacing of washers or O-Rings. The next washer or O-Ring will be installed, this step is repeated up to 9 inches from the top, where the area will be filled with rubber washers. The assembly can then be laid down and the bottom cap installed, this will be accomplished by fusion welding or gluing it in place. The assembly should be visually inspected for appearance, and stored for shipment.
- 4.0 Assembly Procedure
- SDS Manufacturing Procedure #101.
- 1.0 Purpose
-
- Manufacturing procedure for (Wood, Fiberglass, Steel and Aluminum core pilings).
- This procedure shall establish guide lines for the manufacture of Wood,
- Fiberglass, Steel and Aluminum core marine pilings.
- 2.0 Scope
-
- 2.1 All Wood, Fiberglass, Steel and Aluminum core, and expandable foam encased core with a plastic H.D.P.E. or Vinyl shell marine pilings manufactured.
- 3.0 Inspection Procedure
-
- 3.1 Inspection of exterior tubing shell (H.D.P.E. or Vinyl).
- 3.1.1 Check O.D., I.D., and length to specification. Inspect O.D. for surface blemishes, cracking, and shipping damage.
- 3.2 Inspection of Wood, Fiberglass cores.
- 3.2.1 Check I.D., O.D., and length to purchasing specification.
- Visually inspect surfaces for blemishes, cracks, splits, or any defects that would reduce the structural integrity of wood or fiberglass core.
- 3.3 Inspection of Steel and Aluminum tubing (core material):
- 3.3.1 Inspect for dimensional compliance to specification. The surface will be inspected for blemishes, cracks, or shipping damage.
- 3.1 Inspection of exterior tubing shell (H.D.P.E. or Vinyl).
- Check straightness over its length, (should not be bowed more than ¼ inch over its length). Inspect for any defects that would affect structural integrity.
- 4.0 Assembly Procedure
-
- 4.1 The core tubing will be inserted into the outer shell, the two components stood on end on a fixture that will center the core with the outer shell.
- The top of the core will be moved and centered to the shell I.D. A clamp will hold its position during installation of the Urethane Foam.
- The foam will be poured or injected into the void in a pre-measured amount to allow for expansion. The assembly should be allowed to cure for two to three hours. The assembly can then be laid down and the bottom cap installed by fusion welding or gluing it in place.
- 4.2 The assembled piling will be identified by:
- Manufacturer: SDSi.
- Product I.D.:
- Piling with aluminum core=PA
- Piling with fiberglass core=PF
- Piling with steel core=PS
- Piling with wood core=PW
- Date: [month/day/year]
- Daily ascending Assembly Number: #XXX
- Example: SDSi-PS-01/02/2004-#005.
- 4.3 The assembly should be visually inspected for appearance, and stored for shipment.
- 5.0 Optional Driving Tip.
- 5.1 The Steel and Aluminum core pilings will be offered with a pointed tip (e.g. see ref. no. 3 at
FIG. 2B ) (when the site dictates the piles must be driven not jetted into place), the welded pointed tip will seal the pile. Alternatively, steel plates in an “x” pattern could be welded or attached to the bottom of the core to assist driving the piling into the sea bed.
Claims (74)
1. A piling for elevation or support of a structure comprising:
a) an inner core comprising structural support material elongated along a longitudinal axis and having a bottom end and a top end;
b) an outer impact resistant, non-abrasive plastic shell surrounding but spaced from a portion of the inner core;
c) an impact absorbing intermediate material generally filling space between inner core and outer shell; and
d) a sealing member to deter entry of fluid or particles into the space between inner core and oute shell.
2. The piling of claim 1 wherein the structure is related to marine functions.
3. The piling of claim 2 wherein the marine function is a dock.
4. The piling of claim 2 wherein the marine function is a sign or light.
5. The piling of claim 2 wherein the marine function is a sea wall.
6. The piling of claim 1 wherein the inner core is between 8 feet and 40 feet in length.
7. The piling of claim 1 wherein the structural support material comprises a tube.
8. The piling of claim 7 wherein the tube comprises metal.
9. The piling of claim 8 wherein the metal is steel.
10. The piling of claim 8 wherein the metal is aluminum.
11. The piling of claim 7 comprising of fiberglass.
12. The piling of claim 1 wherein the structural support comprises wood.
13. The piling of claim 12 wherein the wood is solid in cross section.
14. The piling of claim 12 wherein the wood is chemically treated.
15. The piling of claim 1 wherein the shell is from several feet long to several tens of feet long.
16. The piling of claim 1 wherein the shell is tubular.
17. The piling of claim 1 wherein the shell comprises plastic that includes some impact absorbent capability.
18. The piling of claim 17 wherein the plastic comprises high density polyethylene.
19. The piling of claim 17 wherein the plastic comprises vinyl.
20. The piling of claim 1 wherein the sheet is on the order of an inch or less thick.
21. The piling of claim 1 wherein the exterior of the shell is textured.
22. The piling of claim 1 wherein the exterior of the shell is colored.
23. The piling of claim 1 wherein the exterior of the shell includes indicia.
24. The piling of claim 1 wherein the shell is not as long along its longitudinal axis as the inner core.
25. The piling of claim 1 wherein the core extends above the top of the shell and below the bottom of the shell when assembled.
26. The piling of claim 1 wherein the intermediate material comprises a material having impact absorbing properties.
27. The piling of claim 26 wherein the intermediate material comprises pellets.
28. The piling of claim 27 wherein the pellets comprise rubber or recycled rubber.
29. The piling of claim 28 wherein the rubber is recycled at least in part.
30. The piling of claim 1 further comprising a retainer at the bottom of the shell.
31. The piling of claim 30 wherein the retainer comprises a ring attached around the exterior of core.
32. The piling of claim 31 wherein the ring is metal and welded to the core.
33. The piling of claim 31 wherein the ring has an outside diameter equal or greater to the inside diameter of the shell.
34. The piling of claim 30 wherein the retainer comprises an elastomeric member.
35. The piling of claim 34 wherein the elastomeric member is a ring positioned at or near the bottom of the shell.
36. The piling of claim 35 further comprising an additioral elastomeric ring at or near the top of the shell.
37. The piling of claim 36 further comprising one or more additional elastomeric rings positionable intermediate between the top and the bottom of the shell.
38. The piling of claim 30 comprising top, bottom and intermediate elastomeric rings placed between the inner core and the shell.
39. The piling of claim 34 wherein the sealing member comprises the elastomeric ring.
40. The piling of claim 34 further comprising a sealing member at the top and bottom of the shell.
41. The piling of claim 40 wherein the sealing ring seal and position the shell concentrically to the piling.
42. The piling of claim 1 wherein the intermediate material comprises a foam.
43. The piling of claim 42 wherein the foam is an expanding foam.
44. The piling of claim 43 wherein the expanding foam is an expanding urethane foam.
45. The piling of claim 1 wherein the sealing member comprises an elastomeric member.
46. The piling of claim 1 wherein the sealing member comprises foam.
47. The piling of claim 1 wherein the intermediate material and sealing member comprises foam which adheres between the core and shell.
48. The piling of claim 47 wherein the foam seals and provides shock absorbing capacity.
49. A method of making a piling comprising:
a) selecting a length of core of structural material;
b) placing impact resistant, non-abrasive a plastic outer shell surrounding and spaced from a selected part of the core;
c) filling at least a portion of space between core and shell with impact absorbent material; and
d) sealing the space.
50. The method of claim 49 wherein the material comprises pellets or discrete pieces of various sizes and shapes retained in the space.
51. The method of claim 50 wherein the pellets or pieces are retained by one or more spacers positioned between the core and the shell.
52. The method of claim 49 wherein the fill is inserted between the space between the core and shell near the bottom of the shell, compressed, and a spacer installed over an in abutnent with the compressed material.
53. The method of claim 52 further comprising filling a second part of the space between core and shell with fill, compressing and installing a spacer above it.
54. The method of claim 49 wherein the shock absorbent intermediate material is an expandable foam.
55. The method of claim 54 wherein the expandable foam is injected in the space between core and shell, leaving space for expansion of the foam.
56. The method of claim 49 wherein the core is tubular.
57. The method of claim 55 wherein the core is alumininum or steel.
58. The method of claim 49 wherein the fill is pelletized.
59. The method of claim 58 wherein the fill is rubber recycled pieces.
60. The method of claim 49 wherein the core is a solid material.
61. The method of claim 60 wherein the solid material is wood.
62. The method of claim 60 wherein the fill is expandable foam.
63. The method of claim 62 wherein the expandable foam is expandable urethane foam.
64. The method of claim 59 wherein the recycle pellets are various sizes and shapes.
65. The method of claim 49 further comprising capping the top of the inner core and shell.
66. The method of claim 65 firther comprising sealing the cap to the shell.
67. The method of claim 49 wherein the shell is one inch or less thickness.
68. The method of claim 49 wherein the shell is made of high density polyethylene.
69. A method of supporting a dock comprising:
a) surrounding a substantial portion of a piling with an impact resistant non-abrasive plastic shell and impact absorbing fill therebetween;
b) sealing the ends of the shell relative to the piling.
70. The method of claim 69 wherein the shell extends around the piling from above water level to below water floor level.
71. The method of claim 69 wherein shell is made of environmentally friendly material.
72. The method of claim 69 wherein the shell is made of marine grade material that is resistant to degradation by water, sun, or marine organisms.
73. The method of claim 69 flirther comprising selecting a plurality of pilings of claim 69 of selected lengths and installing lower ends below water floor level and attaching structure to upper ends.
74. The method of claim 69 wherein the piling has a selected color and texture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/449,383 US20050002741A1 (en) | 2003-05-30 | 2003-05-30 | Apparatus and method for dock support or composite piling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/449,383 US20050002741A1 (en) | 2003-05-30 | 2003-05-30 | Apparatus and method for dock support or composite piling |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050002741A1 true US20050002741A1 (en) | 2005-01-06 |
Family
ID=33551252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/449,383 Abandoned US20050002741A1 (en) | 2003-05-30 | 2003-05-30 | Apparatus and method for dock support or composite piling |
Country Status (1)
Country | Link |
---|---|
US (1) | US20050002741A1 (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040240945A1 (en) * | 2002-06-04 | 2004-12-02 | Frantz Anthony F. | Piling decontamination and marine life enhancement system |
US20080215457A1 (en) * | 2000-05-08 | 2008-09-04 | Pappas Christian S | Method and system for reserving future purchases of goods and services |
US20080215495A1 (en) * | 2000-05-08 | 2008-09-04 | Pappas Christian S | Method and system for reserving future purchases of goods and services |
US20090036720A1 (en) * | 2007-07-31 | 2009-02-05 | Carner William E | System and method for recycling plastics |
US20090279960A1 (en) * | 2006-06-25 | 2009-11-12 | Basem Hazzan | Device and Method for Improved Pile Casting |
US7865424B2 (en) | 2000-05-08 | 2011-01-04 | Option It, Inc. | Method and system for reserving future purchases of goods and services |
US8301550B2 (en) | 2000-05-08 | 2012-10-30 | Smart Options, Llc | Method and system for reserving future purchases of goods or services |
US8620771B2 (en) | 2000-05-08 | 2013-12-31 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US8650114B2 (en) | 2000-05-08 | 2014-02-11 | Smart Options, Llc | Method and system for reserving future purchases of goods or services |
US8930260B2 (en) | 2000-05-08 | 2015-01-06 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9026471B2 (en) | 2000-05-08 | 2015-05-05 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9026472B2 (en) | 2000-05-08 | 2015-05-05 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9047634B2 (en) | 2000-05-08 | 2015-06-02 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9064258B2 (en) | 2000-05-08 | 2015-06-23 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9070150B2 (en) | 2000-05-08 | 2015-06-30 | Smart Options, Llc | Method and system for providing social and environmental performance based sustainable financial instruments |
US9092813B2 (en) | 2000-05-08 | 2015-07-28 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
JP2015232215A (en) * | 2014-06-09 | 2015-12-24 | 西武ポリマ化成株式会社 | Double pipe sealing material |
CN108485017A (en) * | 2018-04-04 | 2018-09-04 | 江蔓青 | A kind of high-performance is given up rubber and plastic base pitch energy hole infiltrating irrigation and preparation method thereof |
US20180266066A1 (en) * | 2017-03-14 | 2018-09-20 | Sean A. Barnes | Pile guide |
US20200063457A1 (en) * | 2018-08-27 | 2020-02-27 | Gaétan GENEST | Adjustable cap for column foundation |
USD899901S1 (en) | 2019-07-24 | 2020-10-27 | Sean A. Barnes | Pile guide having an external stabilizer |
US10822063B1 (en) | 2020-01-30 | 2020-11-03 | Sean A. Barnes | Floating platform |
US11390363B2 (en) | 2020-04-08 | 2022-07-19 | Sean A. Barnes | Boat lift |
CN114922132A (en) * | 2022-05-19 | 2022-08-19 | 中交第二航务工程局有限公司 | High-pile wharf upper structure part materialized construction method based on combined inclined piles |
US11447216B2 (en) | 2019-05-23 | 2022-09-20 | Sean A. Barnes | Floating platform |
US11535995B2 (en) | 2019-05-23 | 2022-12-27 | Sean A. Barnes | Pile guide and adjustable mounting |
US11598063B2 (en) | 2020-03-26 | 2023-03-07 | Sean A. Barnes | Pile guide and adjustable mounting |
US11745838B2 (en) | 2019-05-23 | 2023-09-05 | Sean A. Barnes | Boat lift construct |
US11851836B2 (en) | 2022-01-18 | 2023-12-26 | Sean A. Barnes | Pile guide construct for docks |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2874548A (en) * | 1959-02-24 | Protection against corrosion | ||
US3180099A (en) * | 1963-05-27 | 1965-04-27 | Mikolajczyk Wallace | Pile protector |
US3319328A (en) * | 1962-09-24 | 1967-05-16 | Millmont Ind Inc | Method of installing a protective cap on an exposed wooden pole |
US3728864A (en) * | 1971-03-04 | 1973-04-24 | G Wiswell | Apparatus for repairing steel supporting piles |
US3736759A (en) * | 1971-02-17 | 1973-06-05 | Schlegel Mfg Co | Pile covering |
US4244156A (en) * | 1978-12-04 | 1981-01-13 | Watts Jr Ridley | Pole and piling protector |
US4245931A (en) * | 1979-07-10 | 1981-01-20 | Watts Jr Ridley | Post assembly and method |
US4306821A (en) * | 1978-06-20 | 1981-12-22 | Moore Charles D | Method and apparatus for restoring piling |
US4439070A (en) * | 1981-07-23 | 1984-03-27 | Dimmick Floyd E | Method for restoring an underwater piling and an underwater jacket used therewith |
US4659255A (en) * | 1984-07-19 | 1987-04-21 | Nippon Steel Corporation | Marine structure of precoated corrosion resistant steel pipe piles |
US4697957A (en) * | 1978-07-31 | 1987-10-06 | Hellmers Emil D | Marine pile protective system |
US4892410A (en) * | 1986-06-16 | 1990-01-09 | Sandoz Ltd. | Method and apparatus for protective encapsulation of structural members |
US5226751A (en) * | 1992-02-04 | 1993-07-13 | Doleshal Donald L | Controlling the environment around a submerged pile or other structures by encapsulation, and treating and repairing the encapsulation area |
US5516236A (en) * | 1994-06-20 | 1996-05-14 | Winn & Coales (Denso), Ltd. | Timber pile protection system |
US5518342A (en) * | 1994-10-17 | 1996-05-21 | Wright; A. Lee | Marine dock bumper and tie line storage device |
US5591265A (en) * | 1991-05-10 | 1997-01-07 | Colebrand Limited | Protective coating |
US6364575B1 (en) * | 2000-09-07 | 2002-04-02 | Michael S. Bradley | Underwater pile repair jacket form |
US6536991B1 (en) * | 2000-10-11 | 2003-03-25 | Madcon Corporation | Method of structurally reinforcing an assembly of tubular members in a marine environment |
-
2003
- 2003-05-30 US US10/449,383 patent/US20050002741A1/en not_active Abandoned
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2874548A (en) * | 1959-02-24 | Protection against corrosion | ||
US3319328A (en) * | 1962-09-24 | 1967-05-16 | Millmont Ind Inc | Method of installing a protective cap on an exposed wooden pole |
US3180099A (en) * | 1963-05-27 | 1965-04-27 | Mikolajczyk Wallace | Pile protector |
US3736759A (en) * | 1971-02-17 | 1973-06-05 | Schlegel Mfg Co | Pile covering |
US3728864A (en) * | 1971-03-04 | 1973-04-24 | G Wiswell | Apparatus for repairing steel supporting piles |
US4306821A (en) * | 1978-06-20 | 1981-12-22 | Moore Charles D | Method and apparatus for restoring piling |
US4697957A (en) * | 1978-07-31 | 1987-10-06 | Hellmers Emil D | Marine pile protective system |
US4244156A (en) * | 1978-12-04 | 1981-01-13 | Watts Jr Ridley | Pole and piling protector |
US4245931A (en) * | 1979-07-10 | 1981-01-20 | Watts Jr Ridley | Post assembly and method |
US4439070A (en) * | 1981-07-23 | 1984-03-27 | Dimmick Floyd E | Method for restoring an underwater piling and an underwater jacket used therewith |
US4659255A (en) * | 1984-07-19 | 1987-04-21 | Nippon Steel Corporation | Marine structure of precoated corrosion resistant steel pipe piles |
US4892410A (en) * | 1986-06-16 | 1990-01-09 | Sandoz Ltd. | Method and apparatus for protective encapsulation of structural members |
US5591265A (en) * | 1991-05-10 | 1997-01-07 | Colebrand Limited | Protective coating |
US5226751A (en) * | 1992-02-04 | 1993-07-13 | Doleshal Donald L | Controlling the environment around a submerged pile or other structures by encapsulation, and treating and repairing the encapsulation area |
US5516236A (en) * | 1994-06-20 | 1996-05-14 | Winn & Coales (Denso), Ltd. | Timber pile protection system |
US5518342A (en) * | 1994-10-17 | 1996-05-21 | Wright; A. Lee | Marine dock bumper and tie line storage device |
US6364575B1 (en) * | 2000-09-07 | 2002-04-02 | Michael S. Bradley | Underwater pile repair jacket form |
US6536991B1 (en) * | 2000-10-11 | 2003-03-25 | Madcon Corporation | Method of structurally reinforcing an assembly of tubular members in a marine environment |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9026471B2 (en) | 2000-05-08 | 2015-05-05 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US7962375B2 (en) | 2000-05-08 | 2011-06-14 | Option It, Inc. | Method and system for reserving future purchases of goods and services |
US20080215457A1 (en) * | 2000-05-08 | 2008-09-04 | Pappas Christian S | Method and system for reserving future purchases of goods and services |
US20080215495A1 (en) * | 2000-05-08 | 2008-09-04 | Pappas Christian S | Method and system for reserving future purchases of goods and services |
US9064258B2 (en) | 2000-05-08 | 2015-06-23 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9026472B2 (en) | 2000-05-08 | 2015-05-05 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9070150B2 (en) | 2000-05-08 | 2015-06-30 | Smart Options, Llc | Method and system for providing social and environmental performance based sustainable financial instruments |
US7865424B2 (en) | 2000-05-08 | 2011-01-04 | Option It, Inc. | Method and system for reserving future purchases of goods and services |
US9092813B2 (en) | 2000-05-08 | 2015-07-28 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US8301550B2 (en) | 2000-05-08 | 2012-10-30 | Smart Options, Llc | Method and system for reserving future purchases of goods or services |
US7996292B2 (en) | 2000-05-08 | 2011-08-09 | Option It, Inc. | Method and system for reserving future purchases of goods and services |
US8032447B2 (en) | 2000-05-08 | 2011-10-04 | Option It, Inc. | Method and system for reserving future purchases of goods and services |
US8229841B2 (en) | 2000-05-08 | 2012-07-24 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US9047634B2 (en) | 2000-05-08 | 2015-06-02 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US8543450B2 (en) | 2000-05-08 | 2013-09-24 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US8620771B2 (en) | 2000-05-08 | 2013-12-31 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US8650114B2 (en) | 2000-05-08 | 2014-02-11 | Smart Options, Llc | Method and system for reserving future purchases of goods or services |
US8930260B2 (en) | 2000-05-08 | 2015-01-06 | Smart Options, Llc | Method and system for reserving future purchases of goods and services |
US7104219B2 (en) * | 2002-06-04 | 2006-09-12 | Frantz Anthony F | Piling decontamination and marine life enhancement system |
US20040240945A1 (en) * | 2002-06-04 | 2004-12-02 | Frantz Anthony F. | Piling decontamination and marine life enhancement system |
AU2007264734B2 (en) * | 2006-06-25 | 2019-06-20 | Basem Hazzan | Device and method for improved pile casting |
US20090279960A1 (en) * | 2006-06-25 | 2009-11-12 | Basem Hazzan | Device and Method for Improved Pile Casting |
US20100080738A1 (en) * | 2007-07-31 | 2010-04-01 | Carner William E | Method and System for Recycling Plastics |
US20090036720A1 (en) * | 2007-07-31 | 2009-02-05 | Carner William E | System and method for recycling plastics |
US7892500B2 (en) | 2007-07-31 | 2011-02-22 | Carner William E | Method and system for recycling plastics |
JP2015232215A (en) * | 2014-06-09 | 2015-12-24 | 西武ポリマ化成株式会社 | Double pipe sealing material |
US20180266066A1 (en) * | 2017-03-14 | 2018-09-20 | Sean A. Barnes | Pile guide |
US10267003B2 (en) * | 2017-03-14 | 2019-04-23 | Sean A. Barnes | Pile guide |
CN108485017A (en) * | 2018-04-04 | 2018-09-04 | 江蔓青 | A kind of high-performance is given up rubber and plastic base pitch energy hole infiltrating irrigation and preparation method thereof |
US20200063457A1 (en) * | 2018-08-27 | 2020-02-27 | Gaétan GENEST | Adjustable cap for column foundation |
US11447216B2 (en) | 2019-05-23 | 2022-09-20 | Sean A. Barnes | Floating platform |
US11535995B2 (en) | 2019-05-23 | 2022-12-27 | Sean A. Barnes | Pile guide and adjustable mounting |
US11745838B2 (en) | 2019-05-23 | 2023-09-05 | Sean A. Barnes | Boat lift construct |
USD899901S1 (en) | 2019-07-24 | 2020-10-27 | Sean A. Barnes | Pile guide having an external stabilizer |
US10822063B1 (en) | 2020-01-30 | 2020-11-03 | Sean A. Barnes | Floating platform |
US11598063B2 (en) | 2020-03-26 | 2023-03-07 | Sean A. Barnes | Pile guide and adjustable mounting |
US11390363B2 (en) | 2020-04-08 | 2022-07-19 | Sean A. Barnes | Boat lift |
US11851836B2 (en) | 2022-01-18 | 2023-12-26 | Sean A. Barnes | Pile guide construct for docks |
CN114922132A (en) * | 2022-05-19 | 2022-08-19 | 中交第二航务工程局有限公司 | High-pile wharf upper structure part materialized construction method based on combined inclined piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050002741A1 (en) | Apparatus and method for dock support or composite piling | |
US8650831B2 (en) | Reconstruction methods for structural elements | |
US6659686B2 (en) | Precast modular intermodal concrete shapes and methods of installation to form shoreline stabilization, marine and terrestrial structures | |
US6099208A (en) | Ice composite bodies | |
US10024018B2 (en) | Method of forming a concrete column utilizing a thermoplastic concrete forming tube | |
KR100959301B1 (en) | Tunnel structure object and tunnel and tunnel construction work method | |
CN101648591A (en) | Floating island foundation | |
CN108677945A (en) | A kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod | |
US20110299937A1 (en) | Pre-stressed concrete foundation for a marine building structure | |
CN108560613A (en) | A kind of opening prestressed high strength coagulation pile pile anti-float method integrated with anti-float anchor rod | |
US6994048B1 (en) | Floating low density concrete barrier | |
CN111719580B (en) | Basement anti-floating pile foundation | |
DE102011100627A1 (en) | Floating concrete platform for buildings, settlements, energy independent ecological cities and transport device for transporting houses, power plants, industrial plants and mass, has cavities surrounded by concrete components and layers | |
CA2484660A1 (en) | Foundation piles or similar load carrying elements | |
US20180202120A1 (en) | Boat dock and method of installation | |
CN211422015U (en) | Shock insulation support utilizing waste tires | |
WO2011154799A2 (en) | Pre-stressed concrete foundation for a marine building structure | |
CN208309582U (en) | A kind of opening prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod | |
KR0162272B1 (en) | Waste tire tube | |
US6312196B1 (en) | Sea wall and method of construction thereof | |
CN115637727B (en) | Multistage wave-blocking seepage-proofing retaining wall and construction method thereof | |
CN219261827U (en) | Spliced water injection type electric pole overturning prevention reinforcing device | |
KR100311238B1 (en) | a frame structure in confine the fish raising industry to use a bald tire | |
CN112177059B (en) | Anti-floating anchor rod structure and assembling method thereof | |
CN117286911A (en) | HDPE (high-density polyethylene) film structure with anchor and processing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SPECTRUM DOCK SYSTEMS, INC., FLORIDA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BRENSINGER, FRANK J.;KALAT, JEFFREY M.;BUCK, BRENDA;REEL/FRAME:013880/0212 Effective date: 20030529 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |