US20150267684A1 - System and method of controlling an electronic component of a wind turbine using contingency communications - Google Patents
System and method of controlling an electronic component of a wind turbine using contingency communications Download PDFInfo
- Publication number
- US20150267684A1 US20150267684A1 US14/221,566 US201414221566A US2015267684A1 US 20150267684 A1 US20150267684 A1 US 20150267684A1 US 201414221566 A US201414221566 A US 201414221566A US 2015267684 A1 US2015267684 A1 US 2015267684A1
- Authority
- US
- United States
- Prior art keywords
- commands
- electrical component
- time frame
- received
- contingency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004891 communication Methods 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 title claims abstract description 60
- 238000004364 calculation method Methods 0.000 claims description 15
- 238000013213 extrapolation Methods 0.000 claims description 11
- 239000004065 semiconductor Substances 0.000 claims description 7
- 238000001514 detection method Methods 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 description 7
- 230000007704 transition Effects 0.000 description 6
- 238000005259 measurement Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000003990 capacitor Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000002688 persistence Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
-
- F03D9/003—
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D9/00—Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
- F03D9/20—Wind motors characterised by the driven apparatus
- F03D9/25—Wind motors characterised by the driven apparatus the apparatus being an electrical generator
- F03D9/255—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Definitions
- the present subject matter relates generally to wind turbines and, more particularly, to a system and method of controlling an electronic component of a wind turbine using contingency communications.
- Wind power is considered one of the cleanest, most environmentally friendly energy sources presently available, and wind turbines have gained increased attention in this regard.
- a modern wind turbine typically includes a tower, a nacelle, one or more rotor blades, a gearbox, a generator, and a power converter.
- the rotor blades capture and transmit kinetic energy in the form of rotational energy so as to turn a shaft coupling the rotor blades to a gearbox, or if a gearbox is not used, directly to the generator.
- the gearbox steps up the inherently low rotational speed of the rotor for the generator to efficiently convert the rotational mechanical energy to electrical energy, which is fed into a utility grid via at least one electrical connection.
- a power converter or bridge is typically used to convert a frequency of a generated electric power to a frequency substantially similar to a utility grid frequency.
- Conventional wind turbines also typically include a main controller to control various operational modes of the wind turbine.
- Various wind turbines also include a converter controller configured to control the power converter. More specifically, the converter controller may be communicatively coupled to the power converter via a bridge logic interface.
- the bridge logic is a programmable logic device that generally refers to the quasi-intelligent Field-Programmable Gate Array (FPGA).
- FPGA Field-Programmable Gate Array
- the bridge logic is the program that is carried in the controller code and downloaded to the power bridge interface card at power-up of the wind turbine.
- the bridge logic typically interfaces with the converter controller over a serial link, e.g. a High-Speed Serial Link (HSSL), and the power bridge via discrete signals.
- HSSL High-Speed Serial Link
- the communications between the controller and the bridge logic occurs periodically at regular intervals, generally referred to as a “frame.”
- a frame For example, feedback communications are sent from the bridge logic to the controller at the beginning of each frame, and upon receipt of the feedback communications, the controller performs calculations that result in new command communications for the bridge logic for the next frame. The controller then sends the new command communications to the bridge logic before the start of the next frame. Upon receipt, the bridge logic uses information in the new command communications to configure the gating and feedback logic for the next frame.
- the bridge logic may not receive the new command communications in a timely fashion. Further, noise in the transmission of the new command communications and/or the feedback communications may delay the communications from being transmitted or received on time. Thus, the gating and feedback logic for the next frame may not be configured properly. For these and other reasons, the bridge logic may experience a resulting disturbance to its gating/command operations and fail to acquire and transmit feedback communications to the controller. Still further electrical components of the wind turbine may experience similar issues when communicating with the controller.
- the present subject matter is directed to a method for controlling an electrical component of a wind turbine.
- the method includes receiving, by the electrical component, a standard set of commands for a first time frame.
- a next step includes receiving, by the electrical component, one or more contingency sets of commands for time frames beyond the first time frame.
- the method also includes determining if the standard set of commands is received within a start window of the first time frame.
- a further step includes implementing, by the electrical component, the standard set of commands during the first time frame if the standard set of commands is received within the start window.
- the method also includes implementing, by the electrical component, one of the contingency sets of commands received during a previous time frame if the standard set of commands is not received within the start window.
- the method further includes detecting whether the electrical component is controlled based on the standard set of commands or the contingency set of commands and sending the detection to the controller. In further embodiments, the method includes overwriting the contingency set of commands received during a previous time frame if the standard set of commands is received within the start window of the first time frame. In additional embodiments, if the electrical component is controlled based on the contingency set of commands, the method may include determining an error between the contingency set of commands and the standard set of commands and adjusting subsequent commands based on the error.
- the contingency set of commands may be calculated utilizing one or more algorithms.
- the one or more algorithms may include one of or a combination of the following: a hold-last value, a stop value, a time/angle-based extrapolation, a zero-order hold value, higher-order extrapolation, a melding technique, and/or similar.
- the present subject matter is direction to a method for controlling an electrical component of a wind turbine.
- the method includes receiving, via the controller, feedback communications from the electrical component; determining if the feedback communications are received within a start window of a first time frame; calculating, via the controller, a set of commands for the first time frame, wherein if the feedback communications are received within the start window of the first time frame, the calculations are based on the feedback communications, and wherein if the feedback communications are not received within the start window of the first time frame, the calculations are based on an estimated feedback value; and, controlling the electrical component based on the set of commands applied during the first time frame.
- the set of commands may include a standard set of commands and a contingency set of commands.
- the method may further include controlling the electrical component based on one of the standard set of commands or the contingency set of commands.
- the method may include detecting whether the electrical component is controlled based on the standard set of commands or the contingency set of commands.
- the method may include determining an error between the contingency set of commands and the standard set of commands and adjusting subsequent commands based on the error.
- the method may further include adjusting subsequent calculated commands based on the error.
- the method may also include overwriting the contingency set of commands when the feedback communications are received within a required start window of the first time frame.
- the contingency set of commands may be calculated utilizing one or more algorithms.
- the one or more algorithms may include one of or a combination of the following: a hold-last value, a stop value, a time/angle-based extrapolation, a zero-order hold value, higher-order extrapolation, a melding technique, or similar.
- the standard set of commands may be determined based on the received feedback communications.
- the present subject matter is directed to a system for controlling an electrical component of a wind turbine.
- the system includes a controller communicatively coupled to one or more processors.
- the controller is configured to: receive feedback communications from the electrical component; determine if the feedback communications are received within a start window of a first time frame; calculate a set of commands for the first time frame, wherein if the feedback communications are received within the start window of the first time frame, the calculations are based on the feedback communications, and wherein if the feedback communications are not received within the start window of the first time frame, the calculations are based on an estimated feedback value; and, control the electrical component based on the set of commands during the second time frame.
- controller and the electrical component are communicatively coupled via a serial link.
- the electrical component as described herein may be any suitable electrical component of the wind turbine, including, but not limited to a power converter, a bridge logic interface, a bridge rectifier, a power semiconductor device, and/or an insulated-gate bipolar transistor (IGBT).
- a power converter including, but not limited to a power converter, a bridge logic interface, a bridge rectifier, a power semiconductor device, and/or an insulated-gate bipolar transistor (IGBT).
- IGBT insulated-gate bipolar transistor
- FIG. 1 illustrates a perspective view of a portion of one embodiment of a wind turbine according to the present disclosure
- FIG. 2 illustrates a schematic view of one embodiment of an electrical and control system suitable for use with the wind turbine shown in FIG. 1 ;
- FIG. 3 illustrates a block diagram of one embodiment of a controller suitable for use with the wind turbine shown in FIG. 1 ;
- FIG. 4 illustrates a schematic diagram of one embodiment of a system for controlling a wind turbine according to the present disclosure
- FIG. 5 illustrates a schematic diagram of one embodiment of the converter controller communicating with the bridge logic according to the present disclosure.
- FIG. 6 illustrates one embodiment of a method according to the present disclosure.
- the present subject matter is directed to a system and method for controlling an electrical component, e.g. a power bridge, of a wind turbine using contingency communications.
- the electrical component corresponds to a bridge logic interface of the power converter.
- the electrical component is configured to receive a standard set of commands for a first time frame.
- the electrical component receives one or more contingency sets of commands for time frames beyond the first time frame.
- the electrical component is also configured to determine if the standard set of commands is received within a start window of the first time frame. If the standard set of commands is received on time, the electrical component implements the standard set of commands during the first time frame. In contrast, if the standard set of commands are not received on time, the electrical component implements one of the contingency sets of commands received during a previous time frame.
- the present subject matter has many advantages not present in the prior art. For example, if conventional systems failed to receive commands and/or feedback communications in a timely fashion, then the gating and feedback logic for the next frame would not be configured properly, resulting in a disturbance in the gating operation of the power bridge and/or a failure to acquire and transmit the feedback to the controller.
- the present disclosure determines contingency information for subsequent time frames beyond simply that of the next time frame such that the contingency information can be utilized in the event that feedback data and/or commands are not received in time.
- the system and method of the present disclosure provides tolerance for late or degraded communications between the wind turbine controller and one or more electrical components of the wind turbine and thereby eliminates and/or reduces corresponding faults and/or system failures. Further, the present disclosure provides robust and reliable operation of the electrical equipment in the presence of intermittent communication problems.
- FIG. 1 is a perspective view of a portion of an exemplary wind turbine 100 according to the present disclosure.
- the wind turbine 100 includes a nacelle 102 that typically houses a generator (not shown).
- the nacelle 102 is mounted on a tower 104 having any suitable height that facilitates operation of the wind turbine 100 as described herein.
- the wind turbine 100 also includes a rotor 106 that includes three blades 108 attached to a rotating hub 110 .
- the wind turbine 100 may include any number of blades 108 that facilitates operation of the wind turbine 100 as described herein.
- FIG. 2 a schematic view of an exemplary electrical and control system 200 that may be used with the wind turbine 100 is illustrated.
- wind impacts the blades 108 and the blades 108 transform wind energy into a mechanical rotational torque that rotatably drives a low-speed shaft 112 via the hub 110 .
- the low-speed shaft 112 is configured to drive a gearbox 114 that subsequently steps up the low rotational speed of the low-speed shaft 112 to drive a high-speed shaft 116 at an increased rotational speed.
- the high-speed shaft 116 is generally rotatably coupled to a generator 118 so as to rotatably drive a generator rotor 122 .
- the generator 118 may be a wound rotor, three-phase, double-fed induction (asynchronous) generator (DFIG) that includes a generator stator 120 magnetically coupled to a generator rotor 122 .
- a rotating magnetic field may be induced by the generator rotor 122 and a voltage may be induced within a generator stator 120 that is magnetically coupled to the generator rotor 122 .
- the generator 118 is configured to convert the rotational mechanical energy to a sinusoidal, three-phase alternating current (AC) electrical energy signal in the generator stator 120 .
- AC alternating current
- the associated electrical power can be transmitted to a main transformer 234 via a stator bus 208 , a stator synchronizing switch 206 , a system bus 216 , a main transformer circuit breaker 214 , and a generator-side bus 236 .
- the main transformer 234 steps up the voltage amplitude of the electrical power such that the transformed electrical power may be further transmitted to a grid via a breaker-side bus 240 , a grid circuit breaker 238 , and a grid bus 242 .
- the electrical and control system 200 may include a wind turbine controller 202 configured to control any of the components of the wind turbine 100 .
- the controller 202 may include one or more processor(s) 204 and associated memory device(s) 207 configured to perform a variety of computer-implemented functions (e.g., performing the methods, steps, calculations and the like and storing relevant data as disclosed herein).
- the controller 202 may also include a communications module 209 to facilitate communications between the controller 202 and the various components of the wind turbine 100 , e.g. any of the components of FIG. 2 .
- the communications module 209 may include a sensor interface 211 (e.g., one or more analog-to-digital converters) to permit signals transmitted from one or more sensors to be converted into signals that can be understood and processed by the processors 204 .
- the sensors e.g. sensors 252 , 254 , 256 , 264
- the communications module 209 may be communicatively coupled to the communications module 209 using any suitable means.
- the sensors 252 , 254 , 256 , 264 are coupled to the sensor interface 211 via a wired connection.
- the sensors 252 , 254 , 256 , 264 may be coupled to the sensor interface 211 via a wireless connection, such as by using any suitable wireless communications protocol known in the art.
- the processor 204 may be configured to receive one or more signals from the sensors.
- processor refers not only to integrated circuits referred to in the art as being included in a computer, but also refers to a controller, a microcontroller, a microcomputer, a programmable logic controller (PLC), an application specific integrated circuit, and other programmable circuits.
- the processor 204 is also configured to compute advanced control algorithms and communicate to a variety of Ethernet or serial-based protocols (Modbus, OPC, CAN, etc.).
- the memory device(s) 207 may generally comprise memory element(s) including, but not limited to, computer readable medium (e.g., random access memory (RAM)), computer readable non-volatile medium (e.g., a flash memory), a floppy disk, a compact disc-read only memory (CD-ROM), a magneto-optical disk (MOD), a digital versatile disc (DVD) and/or other suitable memory elements.
- RAM random access memory
- computer readable non-volatile medium e.g., a flash memory
- CD-ROM compact disc-read only memory
- MOD magneto-optical disk
- DVD digital versatile disc
- Such memory device(s) 207 may generally be configured to store suitable computer-readable instructions that, when implemented by the processor(s) 204 , configure the controller 202 to perform the various functions as described herein.
- the generator stator 120 may be electrically coupled to a stator synchronizing switch 206 via a stator bus 208 .
- the generator rotor 122 is electrically coupled to a bi-directional power conversion assembly 210 via a rotor bus 212 .
- the generator rotor 122 may be electrically coupled to the rotor bus 212 via any other device that facilitates operation of electrical and control system 200 as described herein.
- the stator synchronizing switch 206 may be electrically coupled to a main transformer circuit breaker 214 via a system bus 216 .
- the power conversion assembly 210 may include a rotor filter 218 that is electrically coupled to the generator rotor 122 via the rotor bus 212 .
- a rotor filter bus 219 electrically couples the rotor filter 218 to a rotor-side power converter 220 .
- the rotor-side power converter 220 may be electrically coupled to a line-side power converter 222 . It should be understood that the rotor-side converter 220 and the line-side converter 222 may be any suitable type of converter.
- the converters 220 , 222 as described herein may be any one of or combination of the following: an AC-DC converter, an AC-AC converter, a DC-DC converter, a DC-AC converter, a bridge rectifier, a power semiconductor device, an insulated-gate bipolar transistor (IGBT), or similar.
- the IGBT is generally a three-terminal power semiconductor device that is primarily used as an electronic switch.
- the rotor-side power converter 220 and the line-side power converter 222 may have any configuration using any switching devices that facilitate operation of electrical and control system 200 as described herein.
- the power conversion assembly 210 may be coupled in electronic data communication with the turbine controller 202 and/or a separate or integral converter controller 262 to control the operation of the rotor-side power converter 220 and the line-side power converter 222 , which will be discussed in more detail below.
- a line-side power converter bus 223 may electrically couple the line-side power converter 222 to a line filter 224 .
- a line bus 225 may electrically couple the line filter 224 to a line contactor 226 .
- the line contactor 226 may be electrically coupled to a conversion circuit breaker 228 via a conversion circuit breaker bus 230 .
- the conversion circuit breaker 228 may be electrically coupled to the main transformer circuit breaker 214 via system bus 216 and a connection bus 232 .
- the main transformer circuit breaker 214 may be electrically coupled to an electric power main transformer 234 via a generator-side bus 236 .
- the main transformer 234 may be electrically coupled to a grid circuit breaker 238 via a breaker-side bus 240 .
- the grid circuit breaker 238 may be connected to the electric power transmission and distribution grid via a grid bus 242 .
- the rotor-side power converter 220 may be electrically coupled with the line-side power converter 222 via a single direct current (DC) link 244 .
- the rotor-side power converter 220 and the line-side power converter 222 may be electrically coupled via individual and separate DC links.
- the DC link 244 may include a positive rail 246 , a negative rail 248 , and at least one capacitor 250 coupled therebetween.
- the controller 202 may be configured to receive one or more voltage and/or electric current measurement signals from a first set of voltage and electric current sensors 252 .
- the controller 202 may be configured to monitor and control at least some of the operational variables associated with the wind turbine 100 via the sensors 252 .
- each of the sensors 252 may be electrically coupled to each one of the three phases of grid bus 242 .
- the sensors 252 may be electrically coupled to any portion of electrical and control system 200 that facilitates operation of electrical and control system 200 as described herein.
- the sensors as described herein may be configured to measure and/or monitor one or more operating parameters of wind turbine 100 .
- the sensors may include the first set of voltage and electric current sensors 252 , a second set of voltage and electric current sensors 254 , a third set of voltage and electric current sensors 256 , a fourth set of voltage and electric current sensors 264 (all shown in FIG. 2 ), and/or any other suitable sensors.
- the sensors may be a Micro Inertial Measurement Units (MIMUs), strain gauges, accelerometers, pressure sensors, temperature sensors, angle of attack sensors, vibration sensors, Light Detecting and Ranging (LIDAR) sensors, camera systems, fiber optic systems, anemometers, wind vanes, Sonic Detection and Ranging (SODAR) sensors, infra lasers, radiometers, pitot tubes, rawinsondes, other optical sensors, and/or any other suitable sensors.
- MIMUs Micro Inertial Measurement Units
- LIDAR Light Detecting and Ranging
- SODAR Sonic Detection and Ranging
- the sensors and/or devices may be part of the same wind farm, from different wind farms, or independent of any wind farm.
- the system 200 may also include a converter controller 262 configured to receive one or more voltage and electric current measurement signals.
- the converter controller 262 receives voltage and electric current measurement signals from the second set of voltage and electric current sensors 254 coupled in electronic data communication with stator bus 208 .
- the converter controller 262 may also receive the third and fourth set of voltage and electric current measurement signals from the third and fourth set of voltage and electric current sensors 256 , 264 .
- the converter controller 262 may be configured with any of the features described herein in regards to the main controller 202 . Further, the converter controller 262 may be separate from or integral with the main controller 202 .
- the system 300 typically includes a converter controller 262 communicatively coupled to an electrical component.
- the electrical component corresponds to the bridge logic interface 260 .
- the electrical component may include any suitable electrical and/or power component of the wind turbine 100 , including, but not limited to, a power converter (including an AC-DC converter, an AC-AC converter, a DC-DC converter, a DC-AC converter, or similar), a bridge rectifier, a power semiconductor device, an insulated-gate bipolar transistor (IGBT), or similar.
- the converter controller 262 and the bridge logic 260 communicate with each other over a communication link 304 .
- the communication link corresponds to a serial link 304 .
- a serial link generally refers to a link having the ability to communicate by sending data one bit at a time, sequentially, over a communication channel or computer bus.
- the serial link 304 may be a High-Speed Serial Link (HSSL).
- the communication link 304 may include any other suitable communication channel known in the art.
- the bridge logic interface 260 continuously generates feedback communications (represented in FIG. 5 as A-fbk, B-fbk, C-fbk) that are affected by commands received from the converter controller 262 and various other factors.
- the feedback communications may include any information regarding the operational status of the electrical component, e.g. voltages, currents, state information, commands, fault status, temperature, etc.
- the converter controller 262 continuously generates commands based on the feedback communications received from the bridge logic 260 .
- the commands may include information regarding single-edge or multi-edge modulations and/or bridge transitions, rotations, advancing voltages, low-to-high transitions, high-to-low transitions, progression of a phasor onto the terminals of the multi-phase system, pattern firing, notched square-wave, etc.
- bridge transitions involve phase-by-phase transition direction (positive or negative) and the time at which the transition is to take place.
- the communications typically occur periodically and at a regular time intervals, as indicated by Time Frames A through D.
- the time frames may be any suitable time period, for example from about 50 microseconds to about 200 microseconds. In still further embodiments, the time frames may be less than 50 microseconds or greater than 200 microseconds.
- the feedback communications e.g. A-fbk, B-fbk, and C-fbk are sent from the bridge logic 260 to the converter controller 262 during a start window of one of the time frames, as indicated by the bold vertical lines 302 .
- Time Frame B For example, feedback communications, namely A-fbk, are sent from the bridge logic 260 to the controller at the start of Time Frame B, as indicated by the bold lines 302 .
- the converter controller 262 Upon receipt of the A-fbk communications, the converter controller 262 performs calculations, depicted as B-Calc, that result in one or more commands (e.g. C-Gate (norm)) for the bridge logic 260 for the next time frame, Time Frame C.
- the converter controller 262 then sends the new commands to the bridge logic 260 before the start of Time Frame C.
- the bridge logic 260 uses information in the new commands to configure the gating and feedback logic (B-fbk) for Time Frame C.
- the converter controller 262 is also configured to calculate one or more contingency commands for a time frame beyond the next time frame. For example, during Time Frame A, the controller 262 calculates one set of normal commands (e.g. B-Gate (norm)) for Time Frame B and one set of contingency commands (C-Gate (cont)) for Time Frame C and can continue this process for subsequent time frames. Thus, as the controller 262 and the bridge logic 260 continue to communicate over subsequent time frames, if the bridge logic 260 does not receive the normal commands (e.g. C-Gate (norm)) in a timely fashion, the gating and feedback logic for Time Frame C will be based on the contingency commands (C-Gate (cont)) that were calculated during Time Frame B. Accordingly, the system 300 reduces disturbance to the system associated with disturbance in data transmission between the bridge logic 260 and the controller 262 by providing backup commands and feedback.
- normal commands e.g. B-Gate (norm)
- the contingency commands e.g. C-Gate (cont)
- the bridge logic 260 receives the C-Gate (norm) commands in a timely fashion
- the contingency commands may be overwritten by the normal commands contained that are received in a timely fashion.
- the bridge logic 260 is configured to employ the contingency commands, e.g. C-Gate (cont), from the last timely set of commands received by the bridge logic 260 (e.g. the contingency commands received at the start of Time Frame A).
- the controller 262 is configured to detect that the utilized command was a contingency.
- the controller 262 has a more accurate model of what ideally should have been commanded, and calculates an error to incorporate into subsequent commands.
- the error can be used to compensate subsequent commands and mitigate the effect of the contingency.
- the controller 202 does not have to wait to sense and respond to the effect of command errors introduced by use of the contingency commands by way of normal feedback communications, as the controller 262 can take corrective action at much higher bandwidth and reduced latency.
- the error from the desired non-contingency commands can be anticipated.
- a response resulting from this error can be reduced by actions of the controller 262 that form the standard commands. Since the error(s) can be anticipated, the next computed standard commands can make necessary adjustments in response to the known error. Accordingly, the contingency commands allow the bridge gating and acquisition and transmission of the feedback communications to continue to operate with minimal disturbance.
- Time Frame B in conventional systems, if the converter controller 262 failed to receive the new feedback communications (e.g. A-fbk) in a timely fashion, the converter controller 262 calculations (e.g. B-Calc) would not have valid data to work with, thereby causing a corresponding disturbance to the bridge commands (e.g. C-Gate (norm)). To address this problem, the converter controller 262 of the present disclosure detects that the feedbacks communications (e.g. A-fbk) were not received in time and estimates the feedback communications, e.g. determines an estimated feedback value, to use in the converter controller 262 calculations.
- the feedbacks communications e.g. A-fbk
- the controller 262 can continue to operate properly by estimating the missed feedback communications and calculating the standard set of commands 306 and the contingency set of commands 308 based on estimated feedback and sending the standard and contingency sets of commands 306 , 308 to the bridge logic 260 such that the bridge logic 260 will continuously receive commands from the converter controller 262 .
- the communications between the converter controller 262 and the bridge logic 260 will continue to operate with minimal disturbance.
- the controller 262 may determine a hold-last value. More specifically, and referring to Time Frame C of FIG. 5 , if B-fbk is not received by the converter controller 262 in a timely fashion (e.g. at the start of Time Frame C), then the controller 262 may utilize the last value that was received for a feedback communication, namely A-fbk, to calculate the commands for Time Frame C. In further embodiments, the converter controller 262 may extrapolate the missed feedback communication. For example, the controller 262 may utilize one or more time/angle-based extrapolations to estimate the missed communication.
- the electrical component includes a multi-phase AC component
- electrical quantities are rotating in a two-dimensional plane.
- steady-state involves a continuously-changing set of states, as opposed to a set of constant values.
- the nature of the missed communication could be an angle and/or a magnitude, and may involve any number of derivatives in time.
- an expectation of the near future bridge logic 260 commands can be estimated by first predicting a frame-by-frame average desired voltage, and then computing the bridge logic 260 commands necessary to enforce them.
- extrapolation can be increasingly complex, as further sophistication and/or time extensions are to be accommodated.
- the converter controller 262 may estimate the missed feedback communications using one or more melding or blending techniques.
- the missed feedback communications may be estimated by incorporating some of the command content.
- such content may be in the form of feed-forward estimates of responses to commands, assuming a given shape of response.
- the feedback communications are expected to confirm information resulting from the average voltage command
- the average voltage command may be used.
- the feedback communications are expected to confirm information resulting from a contingent prior computation of the average voltage command, the prior average voltage computation may be used.
- the missed feedback communications may be estimated using a stop value, a zero-order hold value, higher-order extrapolation, or any other suitable calculation method. The estimation of the feedback communications allows the converter controller 262 calculations to continue to operate with minimal disturbance.
- the method 400 may include a step 402 of receiving, by the electrical component, a standard set of commands for a first time frame.
- a next step 404 may include receiving, by the electrical component, one or more contingency sets of commands for time frames beyond the first time frame.
- the method 400 may also include a step 406 of determining if the standard set of commands is received within a start window of the first time frame.
- another step 408 includes implementing, by the electrical component, the standard set of commands during the first time frame if the standard set of commands is received within the start window.
- the method 400 may also include a step 410 of implementing, by the electrical component, one of the contingency sets of commands received during a previous time frame if the standard set of commands is not received within the start window.
Abstract
Description
- The present subject matter relates generally to wind turbines and, more particularly, to a system and method of controlling an electronic component of a wind turbine using contingency communications.
- Wind power is considered one of the cleanest, most environmentally friendly energy sources presently available, and wind turbines have gained increased attention in this regard. A modern wind turbine typically includes a tower, a nacelle, one or more rotor blades, a gearbox, a generator, and a power converter. The rotor blades capture and transmit kinetic energy in the form of rotational energy so as to turn a shaft coupling the rotor blades to a gearbox, or if a gearbox is not used, directly to the generator. The gearbox steps up the inherently low rotational speed of the rotor for the generator to efficiently convert the rotational mechanical energy to electrical energy, which is fed into a utility grid via at least one electrical connection. A power converter or bridge is typically used to convert a frequency of a generated electric power to a frequency substantially similar to a utility grid frequency. Conventional wind turbines also typically include a main controller to control various operational modes of the wind turbine.
- Various wind turbines also include a converter controller configured to control the power converter. More specifically, the converter controller may be communicatively coupled to the power converter via a bridge logic interface. The bridge logic is a programmable logic device that generally refers to the quasi-intelligent Field-Programmable Gate Array (FPGA). In other words, the bridge logic is the program that is carried in the controller code and downloaded to the power bridge interface card at power-up of the wind turbine. In addition, the bridge logic typically interfaces with the converter controller over a serial link, e.g. a High-Speed Serial Link (HSSL), and the power bridge via discrete signals.
- Typically, the communications between the controller and the bridge logic occurs periodically at regular intervals, generally referred to as a “frame.” For example, feedback communications are sent from the bridge logic to the controller at the beginning of each frame, and upon receipt of the feedback communications, the controller performs calculations that result in new command communications for the bridge logic for the next frame. The controller then sends the new command communications to the bridge logic before the start of the next frame. Upon receipt, the bridge logic uses information in the new command communications to configure the gating and feedback logic for the next frame.
- Due to the number of asynchronous processes running in the controller, however, the bridge logic may not receive the new command communications in a timely fashion. Further, noise in the transmission of the new command communications and/or the feedback communications may delay the communications from being transmitted or received on time. Thus, the gating and feedback logic for the next frame may not be configured properly. For these and other reasons, the bridge logic may experience a resulting disturbance to its gating/command operations and fail to acquire and transmit feedback communications to the controller. Still further electrical components of the wind turbine may experience similar issues when communicating with the controller.
- Accordingly, a system and method that addresses the aforementioned problems would be welcomed in the technology. More specifically, a system and method that incorporates contingency communications for the upcoming gating frame and one or more subsequent frames would be advantageous.
- Aspects and advantages of the invention will be set forth in part in the following description, or may be obvious from the description, or may be learned through practice of the invention.
- In one aspect, the present subject matter is directed to a method for controlling an electrical component of a wind turbine. The method includes receiving, by the electrical component, a standard set of commands for a first time frame. A next step includes receiving, by the electrical component, one or more contingency sets of commands for time frames beyond the first time frame. The method also includes determining if the standard set of commands is received within a start window of the first time frame. A further step includes implementing, by the electrical component, the standard set of commands during the first time frame if the standard set of commands is received within the start window. The method also includes implementing, by the electrical component, one of the contingency sets of commands received during a previous time frame if the standard set of commands is not received within the start window.
- In one embodiment, the method further includes detecting whether the electrical component is controlled based on the standard set of commands or the contingency set of commands and sending the detection to the controller. In further embodiments, the method includes overwriting the contingency set of commands received during a previous time frame if the standard set of commands is received within the start window of the first time frame. In additional embodiments, if the electrical component is controlled based on the contingency set of commands, the method may include determining an error between the contingency set of commands and the standard set of commands and adjusting subsequent commands based on the error.
- In various embodiments, the contingency set of commands may be calculated utilizing one or more algorithms. For example, in several embodiments, the one or more algorithms may include one of or a combination of the following: a hold-last value, a stop value, a time/angle-based extrapolation, a zero-order hold value, higher-order extrapolation, a melding technique, and/or similar.
- In another aspect, the present subject matter is direction to a method for controlling an electrical component of a wind turbine. The method includes receiving, via the controller, feedback communications from the electrical component; determining if the feedback communications are received within a start window of a first time frame; calculating, via the controller, a set of commands for the first time frame, wherein if the feedback communications are received within the start window of the first time frame, the calculations are based on the feedback communications, and wherein if the feedback communications are not received within the start window of the first time frame, the calculations are based on an estimated feedback value; and, controlling the electrical component based on the set of commands applied during the first time frame.
- In one embodiment, the set of commands may include a standard set of commands and a contingency set of commands. Thus, in a further embodiment, the method may further include controlling the electrical component based on one of the standard set of commands or the contingency set of commands. In addition, the method may include detecting whether the electrical component is controlled based on the standard set of commands or the contingency set of commands. In yet another embodiment, the method may include determining an error between the contingency set of commands and the standard set of commands and adjusting subsequent commands based on the error. In still a further embodiment, the method may further include adjusting subsequent calculated commands based on the error. Further, in additional embodiments, the method may also include overwriting the contingency set of commands when the feedback communications are received within a required start window of the first time frame.
- In several embodiments, the contingency set of commands may be calculated utilizing one or more algorithms. For example, in various embodiments, the one or more algorithms may include one of or a combination of the following: a hold-last value, a stop value, a time/angle-based extrapolation, a zero-order hold value, higher-order extrapolation, a melding technique, or similar. In various embodiments, the standard set of commands may be determined based on the received feedback communications.
- In yet another aspect, the present subject matter is directed to a system for controlling an electrical component of a wind turbine. The system includes a controller communicatively coupled to one or more processors. The controller is configured to: receive feedback communications from the electrical component; determine if the feedback communications are received within a start window of a first time frame; calculate a set of commands for the first time frame, wherein if the feedback communications are received within the start window of the first time frame, the calculations are based on the feedback communications, and wherein if the feedback communications are not received within the start window of the first time frame, the calculations are based on an estimated feedback value; and, control the electrical component based on the set of commands during the second time frame.
- In various embodiments, the controller and the electrical component are communicatively coupled via a serial link.
- It should be understood that the electrical component as described herein may be any suitable electrical component of the wind turbine, including, but not limited to a power converter, a bridge logic interface, a bridge rectifier, a power semiconductor device, and/or an insulated-gate bipolar transistor (IGBT).
- These and other features, aspects and advantages of the present invention will become better understood with reference to the following description and appended claims. The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and, together with the description, serve to explain the principles of the invention.
- A full and enabling disclosure of the present invention, including the best mode thereof, directed to one of ordinary skill in the art, is set forth in the specification, which makes reference to the appended figures, in which:
-
FIG. 1 illustrates a perspective view of a portion of one embodiment of a wind turbine according to the present disclosure; -
FIG. 2 illustrates a schematic view of one embodiment of an electrical and control system suitable for use with the wind turbine shown inFIG. 1 ; -
FIG. 3 illustrates a block diagram of one embodiment of a controller suitable for use with the wind turbine shown inFIG. 1 ; -
FIG. 4 illustrates a schematic diagram of one embodiment of a system for controlling a wind turbine according to the present disclosure; -
FIG. 5 illustrates a schematic diagram of one embodiment of the converter controller communicating with the bridge logic according to the present disclosure; and, -
FIG. 6 illustrates one embodiment of a method according to the present disclosure. - Reference now will be made in detail to embodiments of the invention, one or more examples of which are illustrated in the drawings. Each example is provided by way of explanation of the invention, not limitation of the invention. In fact, it will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the scope or spirit of the invention. For instance, features illustrated or described as part of one embodiment can be used with another embodiment to yield a still further embodiment. Thus, it is intended that the present invention covers such modifications and variations as come within the scope of the appended claims and their equivalents.
- Generally, the present subject matter is directed to a system and method for controlling an electrical component, e.g. a power bridge, of a wind turbine using contingency communications. As mentioned, in one embodiment, the electrical component corresponds to a bridge logic interface of the power converter. The electrical component is configured to receive a standard set of commands for a first time frame. In addition, the electrical component receives one or more contingency sets of commands for time frames beyond the first time frame. The electrical component is also configured to determine if the standard set of commands is received within a start window of the first time frame. If the standard set of commands is received on time, the electrical component implements the standard set of commands during the first time frame. In contrast, if the standard set of commands are not received on time, the electrical component implements one of the contingency sets of commands received during a previous time frame.
- The present subject matter has many advantages not present in the prior art. For example, if conventional systems failed to receive commands and/or feedback communications in a timely fashion, then the gating and feedback logic for the next frame would not be configured properly, resulting in a disturbance in the gating operation of the power bridge and/or a failure to acquire and transmit the feedback to the controller. The present disclosure, however, determines contingency information for subsequent time frames beyond simply that of the next time frame such that the contingency information can be utilized in the event that feedback data and/or commands are not received in time. Thus, the system and method of the present disclosure provides tolerance for late or degraded communications between the wind turbine controller and one or more electrical components of the wind turbine and thereby eliminates and/or reduces corresponding faults and/or system failures. Further, the present disclosure provides robust and reliable operation of the electrical equipment in the presence of intermittent communication problems.
- Referring now to the drawings,
FIG. 1 is a perspective view of a portion of anexemplary wind turbine 100 according to the present disclosure. Thewind turbine 100 includes anacelle 102 that typically houses a generator (not shown). Thenacelle 102 is mounted on atower 104 having any suitable height that facilitates operation of thewind turbine 100 as described herein. Thewind turbine 100 also includes arotor 106 that includes threeblades 108 attached to arotating hub 110. Alternatively, thewind turbine 100 may include any number ofblades 108 that facilitates operation of thewind turbine 100 as described herein. - Referring to
FIG. 2 , a schematic view of an exemplary electrical andcontrol system 200 that may be used with thewind turbine 100 is illustrated. During operation, wind impacts theblades 108 and theblades 108 transform wind energy into a mechanical rotational torque that rotatably drives a low-speed shaft 112 via thehub 110. The low-speed shaft 112 is configured to drive a gearbox 114 that subsequently steps up the low rotational speed of the low-speed shaft 112 to drive a high-speed shaft 116 at an increased rotational speed. The high-speed shaft 116 is generally rotatably coupled to agenerator 118 so as to rotatably drive agenerator rotor 122. In one embodiment, thegenerator 118 may be a wound rotor, three-phase, double-fed induction (asynchronous) generator (DFIG) that includes agenerator stator 120 magnetically coupled to agenerator rotor 122. As such, a rotating magnetic field may be induced by thegenerator rotor 122 and a voltage may be induced within agenerator stator 120 that is magnetically coupled to thegenerator rotor 122. In one embodiment, thegenerator 118 is configured to convert the rotational mechanical energy to a sinusoidal, three-phase alternating current (AC) electrical energy signal in thegenerator stator 120. The associated electrical power can be transmitted to amain transformer 234 via astator bus 208, a stator synchronizing switch 206, asystem bus 216, a maintransformer circuit breaker 214, and a generator-side bus 236. Themain transformer 234 steps up the voltage amplitude of the electrical power such that the transformed electrical power may be further transmitted to a grid via a breaker-side bus 240, agrid circuit breaker 238, and a grid bus 242. - In addition, the electrical and
control system 200 may include awind turbine controller 202 configured to control any of the components of thewind turbine 100. For example, as shown particularly inFIG. 3 , thecontroller 202 may include one or more processor(s) 204 and associated memory device(s) 207 configured to perform a variety of computer-implemented functions (e.g., performing the methods, steps, calculations and the like and storing relevant data as disclosed herein). Additionally, thecontroller 202 may also include acommunications module 209 to facilitate communications between thecontroller 202 and the various components of thewind turbine 100, e.g. any of the components ofFIG. 2 . Further, thecommunications module 209 may include a sensor interface 211 (e.g., one or more analog-to-digital converters) to permit signals transmitted from one or more sensors to be converted into signals that can be understood and processed by theprocessors 204. It should be appreciated that the sensors (e.g. sensors communications module 209 using any suitable means. For example, as shown inFIG. 3 , thesensors sensor interface 211 via a wired connection. However, in other embodiments, thesensors sensor interface 211 via a wireless connection, such as by using any suitable wireless communications protocol known in the art. As such, theprocessor 204 may be configured to receive one or more signals from the sensors. - As used herein, the term “processor” refers not only to integrated circuits referred to in the art as being included in a computer, but also refers to a controller, a microcontroller, a microcomputer, a programmable logic controller (PLC), an application specific integrated circuit, and other programmable circuits. The
processor 204 is also configured to compute advanced control algorithms and communicate to a variety of Ethernet or serial-based protocols (Modbus, OPC, CAN, etc.). Additionally, the memory device(s) 207 may generally comprise memory element(s) including, but not limited to, computer readable medium (e.g., random access memory (RAM)), computer readable non-volatile medium (e.g., a flash memory), a floppy disk, a compact disc-read only memory (CD-ROM), a magneto-optical disk (MOD), a digital versatile disc (DVD) and/or other suitable memory elements. Such memory device(s) 207 may generally be configured to store suitable computer-readable instructions that, when implemented by the processor(s) 204, configure thecontroller 202 to perform the various functions as described herein. - Referring back to
FIG. 2 , thegenerator stator 120 may be electrically coupled to a stator synchronizing switch 206 via astator bus 208. In one embodiment, to facilitate the DFIG configuration, thegenerator rotor 122 is electrically coupled to a bi-directionalpower conversion assembly 210 via arotor bus 212. Alternatively, thegenerator rotor 122 may be electrically coupled to therotor bus 212 via any other device that facilitates operation of electrical andcontrol system 200 as described herein. In a further embodiment, the stator synchronizing switch 206 may be electrically coupled to a maintransformer circuit breaker 214 via asystem bus 216. - The
power conversion assembly 210 may include arotor filter 218 that is electrically coupled to thegenerator rotor 122 via therotor bus 212. Arotor filter bus 219 electrically couples therotor filter 218 to a rotor-side power converter 220. Further, the rotor-side power converter 220 may be electrically coupled to a line-side power converter 222. It should be understood that the rotor-side converter 220 and the line-side converter 222 may be any suitable type of converter. For example, theconverters side power converter 220 and the line-side power converter 222 may have any configuration using any switching devices that facilitate operation of electrical andcontrol system 200 as described herein. Further, thepower conversion assembly 210 may be coupled in electronic data communication with theturbine controller 202 and/or a separate orintegral converter controller 262 to control the operation of the rotor-side power converter 220 and the line-side power converter 222, which will be discussed in more detail below. - Still referring to
FIG. 2 , a line-sidepower converter bus 223 may electrically couple the line-side power converter 222 to aline filter 224. Also, aline bus 225 may electrically couple theline filter 224 to a line contactor 226. Moreover, the line contactor 226 may be electrically coupled to aconversion circuit breaker 228 via a conversioncircuit breaker bus 230. In addition, theconversion circuit breaker 228 may be electrically coupled to the maintransformer circuit breaker 214 viasystem bus 216 and a connection bus 232. The maintransformer circuit breaker 214 may be electrically coupled to an electric powermain transformer 234 via a generator-side bus 236. Themain transformer 234 may be electrically coupled to agrid circuit breaker 238 via a breaker-side bus 240. Thegrid circuit breaker 238 may be connected to the electric power transmission and distribution grid via a grid bus 242. - Within the
power conversion assembly 210, the rotor-side power converter 220 may be electrically coupled with the line-side power converter 222 via a single direct current (DC) link 244. Alternatively, the rotor-side power converter 220 and the line-side power converter 222 may be electrically coupled via individual and separate DC links. In addition, as shown, the DC link 244 may include apositive rail 246, a negative rail 248, and at least onecapacitor 250 coupled therebetween. - During operation, the
controller 202 may be configured to receive one or more voltage and/or electric current measurement signals from a first set of voltage and electriccurrent sensors 252. Thus, thecontroller 202 may be configured to monitor and control at least some of the operational variables associated with thewind turbine 100 via thesensors 252. In the illustrated embodiment, each of thesensors 252 may be electrically coupled to each one of the three phases of grid bus 242. Alternatively, thesensors 252 may be electrically coupled to any portion of electrical andcontrol system 200 that facilitates operation of electrical andcontrol system 200 as described herein. In addition, the sensors as described herein may be configured to measure and/or monitor one or more operating parameters ofwind turbine 100. In one embodiment, for example, the sensors may include the first set of voltage and electriccurrent sensors 252, a second set of voltage and electriccurrent sensors 254, a third set of voltage and electriccurrent sensors 256, a fourth set of voltage and electric current sensors 264 (all shown inFIG. 2 ), and/or any other suitable sensors. - It should also be understood that any number or type of sensors may be employed within the
wind turbine 100 and at any location. For example, the sensors may be a Micro Inertial Measurement Units (MIMUs), strain gauges, accelerometers, pressure sensors, temperature sensors, angle of attack sensors, vibration sensors, Light Detecting and Ranging (LIDAR) sensors, camera systems, fiber optic systems, anemometers, wind vanes, Sonic Detection and Ranging (SODAR) sensors, infra lasers, radiometers, pitot tubes, rawinsondes, other optical sensors, and/or any other suitable sensors. Further, the sensors and/or devices may be part of the same wind farm, from different wind farms, or independent of any wind farm. - As mentioned, the
system 200 may also include aconverter controller 262 configured to receive one or more voltage and electric current measurement signals. For example, as shown in the illustrated embodiment, theconverter controller 262 receives voltage and electric current measurement signals from the second set of voltage and electriccurrent sensors 254 coupled in electronic data communication withstator bus 208. Theconverter controller 262 may also receive the third and fourth set of voltage and electric current measurement signals from the third and fourth set of voltage and electriccurrent sensors converter controller 262 may be configured with any of the features described herein in regards to themain controller 202. Further, theconverter controller 262 may be separate from or integral with themain controller 202. - Referring now to
FIGS. 4-6 , various embodiments of asystem 300 andmethod 400 for controlling thewind turbine 100 according to the present disclosure are illustrated. Referring particularly toFIG. 4 , thesystem 300 typically includes aconverter controller 262 communicatively coupled to an electrical component. For example, as shown in the illustrated embodiment, the electrical component corresponds to thebridge logic interface 260. It should be understood that the electrical component may include any suitable electrical and/or power component of thewind turbine 100, including, but not limited to, a power converter (including an AC-DC converter, an AC-AC converter, a DC-DC converter, a DC-AC converter, or similar), a bridge rectifier, a power semiconductor device, an insulated-gate bipolar transistor (IGBT), or similar. Further, theconverter controller 262 and thebridge logic 260 communicate with each other over acommunication link 304. More specifically, as shown, the communication link corresponds to aserial link 304. As used herein, a serial link generally refers to a link having the ability to communicate by sending data one bit at a time, sequentially, over a communication channel or computer bus. For example, in various embodiments, theserial link 304 may be a High-Speed Serial Link (HSSL). In further embodiments, thecommunication link 304 may include any other suitable communication channel known in the art. - Referring to
FIGS. 4 and 5 , thebridge logic interface 260 continuously generates feedback communications (represented inFIG. 5 as A-fbk, B-fbk, C-fbk) that are affected by commands received from theconverter controller 262 and various other factors. In various embodiments, the feedback communications may include any information regarding the operational status of the electrical component, e.g. voltages, currents, state information, commands, fault status, temperature, etc. Similarly, theconverter controller 262 continuously generates commands based on the feedback communications received from thebridge logic 260. In various embodiments, the commands may include information regarding single-edge or multi-edge modulations and/or bridge transitions, rotations, advancing voltages, low-to-high transitions, high-to-low transitions, progression of a phasor onto the terminals of the multi-phase system, pattern firing, notched square-wave, etc. For example, in certain embodiments, bridge transitions involve phase-by-phase transition direction (positive or negative) and the time at which the transition is to take place. - Referring particularly to
FIG. 5 , the communications typically occur periodically and at a regular time intervals, as indicated by Time Frames A through D. The time frames may be any suitable time period, for example from about 50 microseconds to about 200 microseconds. In still further embodiments, the time frames may be less than 50 microseconds or greater than 200 microseconds. The feedback communications (e.g. A-fbk, B-fbk, and C-fbk) are sent from thebridge logic 260 to theconverter controller 262 during a start window of one of the time frames, as indicated by the boldvertical lines 302. - The present disclosure will now be explained further in reference to Time Frame B, however, it should be understood that preceding and subsequent time frames operate in a similar manner and Time Frame B is simply discussed for illustrated purposes only. For example, feedback communications, namely A-fbk, are sent from the
bridge logic 260 to the controller at the start of Time Frame B, as indicated by thebold lines 302. Upon receipt of the A-fbk communications, theconverter controller 262 performs calculations, depicted as B-Calc, that result in one or more commands (e.g. C-Gate (norm)) for thebridge logic 260 for the next time frame, Time Frame C. Theconverter controller 262 then sends the new commands to thebridge logic 260 before the start of Time Frame C. Upon reception, thebridge logic 260 uses information in the new commands to configure the gating and feedback logic (B-fbk) for Time Frame C. - The
converter controller 262 is also configured to calculate one or more contingency commands for a time frame beyond the next time frame. For example, during Time Frame A, thecontroller 262 calculates one set of normal commands (e.g. B-Gate (norm)) for Time Frame B and one set of contingency commands (C-Gate (cont)) for Time Frame C and can continue this process for subsequent time frames. Thus, as thecontroller 262 and thebridge logic 260 continue to communicate over subsequent time frames, if thebridge logic 260 does not receive the normal commands (e.g. C-Gate (norm)) in a timely fashion, the gating and feedback logic for Time Frame C will be based on the contingency commands (C-Gate (cont)) that were calculated during Time Frame B. Accordingly, thesystem 300 reduces disturbance to the system associated with disturbance in data transmission between thebridge logic 260 and thecontroller 262 by providing backup commands and feedback. - In additional embodiments, if the contingency commands (e.g. C-Gate (cont)) are not utilized by the
bridge logic 260 during a certain time frame (e.g. because thebridge logic 260 receives the C-Gate (norm) commands in a timely fashion), then the contingency commands may be overwritten by the normal commands contained that are received in a timely fashion. Alternatively, in the case that the normal commands are not received by thebridge logic 260 in a timely manner, then thebridge logic 260 is configured to employ the contingency commands, e.g. C-Gate (cont), from the last timely set of commands received by the bridge logic 260 (e.g. the contingency commands received at the start of Time Frame A). If the contingency commands are utilized, then thecontroller 262 is configured to detect that the utilized command was a contingency. Thus, thecontroller 262 has a more accurate model of what ideally should have been commanded, and calculates an error to incorporate into subsequent commands. The error can be used to compensate subsequent commands and mitigate the effect of the contingency. As such, thecontroller 202 does not have to wait to sense and respond to the effect of command errors introduced by use of the contingency commands by way of normal feedback communications, as thecontroller 262 can take corrective action at much higher bandwidth and reduced latency. In several embodiments, where the contingency commands have been used, the error from the desired non-contingency commands can be anticipated. In such an embodiment, a response resulting from this error can be reduced by actions of thecontroller 262 that form the standard commands. Since the error(s) can be anticipated, the next computed standard commands can make necessary adjustments in response to the known error. Accordingly, the contingency commands allow the bridge gating and acquisition and transmission of the feedback communications to continue to operate with minimal disturbance. - Still referring to Time Frame B, in conventional systems, if the
converter controller 262 failed to receive the new feedback communications (e.g. A-fbk) in a timely fashion, theconverter controller 262 calculations (e.g. B-Calc) would not have valid data to work with, thereby causing a corresponding disturbance to the bridge commands (e.g. C-Gate (norm)). To address this problem, theconverter controller 262 of the present disclosure detects that the feedbacks communications (e.g. A-fbk) were not received in time and estimates the feedback communications, e.g. determines an estimated feedback value, to use in theconverter controller 262 calculations. Thus, if theconverter controller 262 fails to receive the A-fbk communications, thecontroller 262 can continue to operate properly by estimating the missed feedback communications and calculating the standard set ofcommands 306 and the contingency set ofcommands 308 based on estimated feedback and sending the standard and contingency sets ofcommands bridge logic 260 such that thebridge logic 260 will continuously receive commands from theconverter controller 262. Thus, the communications between theconverter controller 262 and thebridge logic 260 will continue to operate with minimal disturbance. - It should be understood that various algorithms may be utilized to estimate the feedback communications. For example, in one embodiment, the
controller 262 may determine a hold-last value. More specifically, and referring to Time Frame C ofFIG. 5 , if B-fbk is not received by theconverter controller 262 in a timely fashion (e.g. at the start of Time Frame C), then thecontroller 262 may utilize the last value that was received for a feedback communication, namely A-fbk, to calculate the commands for Time Frame C. In further embodiments, theconverter controller 262 may extrapolate the missed feedback communication. For example, thecontroller 262 may utilize one or more time/angle-based extrapolations to estimate the missed communication. In one embodiment, where the electrical component includes a multi-phase AC component, electrical quantities are rotating in a two-dimensional plane. Thus, steady-state involves a continuously-changing set of states, as opposed to a set of constant values. Accordingly, the nature of the missed communication could be an angle and/or a magnitude, and may involve any number of derivatives in time. In further embodiments, where a continuation of low dynamic states predict future phasor persistence, an expectation of the nearfuture bridge logic 260 commands can be estimated by first predicting a frame-by-frame average desired voltage, and then computing thebridge logic 260 commands necessary to enforce them. In still additional embodiments, extrapolation can be increasingly complex, as further sophistication and/or time extensions are to be accommodated. - In still additional embodiments, the
converter controller 262 may estimate the missed feedback communications using one or more melding or blending techniques. For example, in one embodiment, the missed feedback communications may be estimated by incorporating some of the command content. In certain embodiments, such content may be in the form of feed-forward estimates of responses to commands, assuming a given shape of response. In further embodiments, where the feedback communications are expected to confirm information resulting from the average voltage command, the average voltage command may be used. In still additional embodiments, where the feedback communications are expected to confirm information resulting from a contingent prior computation of the average voltage command, the prior average voltage computation may be used. In still further embodiments, the missed feedback communications may be estimated using a stop value, a zero-order hold value, higher-order extrapolation, or any other suitable calculation method. The estimation of the feedback communications allows theconverter controller 262 calculations to continue to operate with minimal disturbance. - Referring now to
FIG. 6 , one embodiment of amethod 400 for controlling awind turbine 100 according to the present disclosure is illustrated. As shown, themethod 400 may include astep 402 of receiving, by the electrical component, a standard set of commands for a first time frame. Anext step 404 may include receiving, by the electrical component, one or more contingency sets of commands for time frames beyond the first time frame. Themethod 400 may also include astep 406 of determining if the standard set of commands is received within a start window of the first time frame. In addition, anotherstep 408 includes implementing, by the electrical component, the standard set of commands during the first time frame if the standard set of commands is received within the start window. Themethod 400 may also include astep 410 of implementing, by the electrical component, one of the contingency sets of commands received during a previous time frame if the standard set of commands is not received within the start window. - This written description uses examples to disclose the invention, including the best mode, and also to enable any person skilled in the art to practice the invention, including making and using any devices or systems and performing any incorporated methods. The patentable scope of the invention is defined by the claims, and may include other examples that occur to those skilled in the art. Such other examples are intended to be within the scope of the claims if they include structural elements that do not differ from the literal language of the claims, or if they include equivalent structural elements with insubstantial differences from the literal languages of the claims.
Claims (20)
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/221,566 US9157415B1 (en) | 2014-03-21 | 2014-03-21 | System and method of controlling an electronic component of a wind turbine using contingency communications |
CA2884649A CA2884649C (en) | 2014-03-21 | 2015-03-12 | System and method of controlling an electronic component of a wind turbine using contingency communications |
DE102015103952.4A DE102015103952B4 (en) | 2014-03-21 | 2015-03-17 | System and method for controlling an electronic component of a wind turbine using contingency communication |
DKPA201570154A DK179321B1 (en) | 2014-03-21 | 2015-03-18 | System and method for controlling an electronic component of a wind turbine using contingent communication |
BR102015006271-0A BR102015006271B1 (en) | 2014-03-21 | 2015-03-20 | Method and system for controlling an electrical component of a wind turbine |
CN201510127013.XA CN104929862B (en) | 2014-03-21 | 2015-03-23 | Utilize the system and method for the electronic component of emergency communication control wind turbine |
DKPA201770756A DK179327B1 (en) | 2014-03-21 | 2017-10-05 | System and method for controlling an electronic component of a wind turbine using contingent communication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/221,566 US9157415B1 (en) | 2014-03-21 | 2014-03-21 | System and method of controlling an electronic component of a wind turbine using contingency communications |
Publications (2)
Publication Number | Publication Date |
---|---|
US20150267684A1 true US20150267684A1 (en) | 2015-09-24 |
US9157415B1 US9157415B1 (en) | 2015-10-13 |
Family
ID=54053777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/221,566 Active 2034-04-10 US9157415B1 (en) | 2014-03-21 | 2014-03-21 | System and method of controlling an electronic component of a wind turbine using contingency communications |
Country Status (6)
Country | Link |
---|---|
US (1) | US9157415B1 (en) |
CN (1) | CN104929862B (en) |
BR (1) | BR102015006271B1 (en) |
CA (1) | CA2884649C (en) |
DE (1) | DE102015103952B4 (en) |
DK (2) | DK179321B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3470669A1 (en) * | 2017-10-13 | 2019-04-17 | General Electric Company | System and method for mitigating blade run-away loads in the event of a pitch system failure |
CN113446152A (en) * | 2020-03-27 | 2021-09-28 | 北京金风科创风电设备有限公司 | Variable pitch control method and control system of wind generating set |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080944B (en) * | 2018-01-26 | 2021-09-24 | 通用电气公司 | Wind power generation system and control method thereof |
CN113992084B (en) * | 2021-12-29 | 2022-04-01 | 苏州乾能电气有限公司 | Method, system, device and medium for inhibiting generator vibration |
Citations (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4371938A (en) * | 1981-03-30 | 1983-02-01 | United Technologies Corporation | Automatic airspeed engage/disengage |
US4385356A (en) * | 1981-03-30 | 1983-05-24 | United Technologies Corporation | Non-saturating airspeed/attitude controls |
US4477876A (en) * | 1981-03-30 | 1984-10-16 | United Technologies Corporation | Dual response aircraft reference synchronization |
US20020029097A1 (en) * | 2000-04-07 | 2002-03-07 | Pionzio Dino J. | Wind farm control system |
US6429648B1 (en) * | 2000-05-26 | 2002-08-06 | Mitsubishi Denki Kabushiki Kaisha | Current detecting device and current detecting method |
US20030102675A1 (en) * | 2000-04-17 | 2003-06-05 | Umweltkontor Renewable Energy Ag | Power generators and method and device for generating power |
US20040230377A1 (en) * | 2003-05-16 | 2004-11-18 | Seawest Holdings, Inc. | Wind power management system and method |
US20050213967A1 (en) * | 2004-03-29 | 2005-09-29 | Fujitsu Limited | Optical wavelength division multiplexing transmission system |
US7099800B2 (en) * | 2001-09-28 | 2006-08-29 | Neg Micon Control Systems A/S | Method and a computer for handling operational data of wind power plants |
US20070026996A1 (en) * | 2005-08-01 | 2007-02-01 | Toyota Jidosha Kabushiki Kaisha | Shift control apparartus and shift control method of automatic transmission of vehicle |
US20070177314A1 (en) * | 2006-01-31 | 2007-08-02 | Haiqing Weng | Method, apparatus and computer program product for injection current |
US20070194574A1 (en) * | 2006-02-21 | 2007-08-23 | Nordex Energy Gmbh | Method for the operation of a wind turbine generator system |
US20090137361A1 (en) * | 2005-10-26 | 2009-05-28 | Toyota Jidosha Kabushiki Kaisha | Controller for vehicle drive device |
US20090284747A1 (en) * | 2008-05-16 | 2009-11-19 | Charles Bernard Valois | Non-Contact Selection and Control of Lighting Devices |
US20100049486A1 (en) * | 2008-08-22 | 2010-02-25 | General Electric Company | Systems and Methods for Simulating Plant Operations |
US20100138188A1 (en) * | 2009-06-08 | 2010-06-03 | Amit Vasant Mengane | System, remote device, and method for validating operation of a wind turbine |
US20100142237A1 (en) * | 2009-01-23 | 2010-06-10 | General Electric Company | System and method for control of a grid connected power generating system |
US7826988B2 (en) * | 2007-08-02 | 2010-11-02 | Nordex Energy Gmbh | Method and apparatus for determining a characteristic curve for an electric variable of a wind energy plant |
US7908035B2 (en) * | 2009-08-31 | 2011-03-15 | General Electric Company | System and method for wind formulary |
US20110144817A1 (en) * | 2010-08-26 | 2011-06-16 | Ralph Teichmann | Method and apparatus for controlling wind turbine electric power generation |
US8024492B2 (en) * | 2008-12-23 | 2011-09-20 | Schneider Electric USA, Inc. | System for managing a power monitoring system containing a multiplicity of intelligent electronic devices |
US8108080B2 (en) * | 2010-05-28 | 2012-01-31 | Mitsubishi Heavy Industries, Ltd. | Monitoring and control apparatus and method and wind power plant equipped with the same |
US20120041711A1 (en) * | 2010-08-16 | 2012-02-16 | Invensys Systems Inc. | Enhanced Rotation Measurement |
US8162788B2 (en) * | 2009-08-27 | 2012-04-24 | General Electric Company | System, device and method for wind turbine control based on operating profiles |
US8169097B2 (en) * | 2006-07-21 | 2012-05-01 | Repower Systems Ag | Method for operating a wind energy installation |
US8180498B2 (en) * | 2009-12-25 | 2012-05-15 | General Electric Company | System and method for monitoring and controlling a wind turbine farm |
US20120199411A1 (en) * | 2011-02-07 | 2012-08-09 | Unisia Jkc Steering Systems Co., Ltd. | Variable displacement pump |
US20120249013A1 (en) * | 2011-03-16 | 2012-10-04 | Charles Bernard Valois | System and method for low level dimming |
US8295987B2 (en) * | 2010-03-31 | 2012-10-23 | General Electric Company | Systems and methods for performance monitoring and identifying upgrades for wind turbines |
US20120280625A1 (en) * | 2011-05-05 | 2012-11-08 | I2Systems Inc | Systems and methods for active thermal management |
US8355823B2 (en) * | 2009-05-25 | 2013-01-15 | Vestas Wind Systems A/S | Method and system for controlling operation of a wind turbine |
US20130140820A1 (en) * | 2010-08-13 | 2013-06-06 | Germán Claudio Tarnowski | Wind-power production with reduced power fluctuations |
US20130214534A1 (en) * | 2012-02-21 | 2013-08-22 | Mitsubishi Heavy Industries, Ltd. | Method for operating wind farm and operation control system for wind farm |
US8538593B2 (en) * | 2010-07-02 | 2013-09-17 | Alstom Grid Inc. | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20130263928A1 (en) * | 2010-12-27 | 2013-10-10 | Mitsubishi Heavy Industries, Ltd. | Condensate flow rate control device and condensate flow rate control method for power plant |
US8606686B1 (en) * | 2008-03-07 | 2013-12-10 | Versify Solutions, Inc. | System and method for gathering and performing complex analyses on power data from multiple remote sources |
US8660706B2 (en) * | 2007-01-04 | 2014-02-25 | Dewind Co. | SCADA unit |
US20140064916A1 (en) * | 2012-08-29 | 2014-03-06 | Hon Hai Precision Industry Co., Ltd. | Cooling system and method for data center |
US20140062085A1 (en) * | 2012-08-31 | 2014-03-06 | General Electric Company | Voltage control for wind turbine generators |
US8761948B1 (en) * | 2008-04-25 | 2014-06-24 | Versify Solutions, Inc. | System and method for managing and monitoring renewable energy power generation |
US20150021912A1 (en) * | 2013-07-16 | 2015-01-22 | John Bech | Method and arrangement for controlling a wind turbine |
US20150061289A1 (en) * | 2013-09-05 | 2015-03-05 | General Electric Company | System and method for voltage control of wind generators |
US20150061290A1 (en) * | 2013-09-05 | 2015-03-05 | General Electric Company | System and method for voltage control of wind generators |
US8977403B2 (en) * | 2011-06-22 | 2015-03-10 | Mitsubishi Heavy Industries, Ltd. | Remote monitoring apparatus, wind turbine generator system, and method of controlling remote monitoring apparatus |
US9035479B1 (en) * | 2014-07-11 | 2015-05-19 | Wind Stream Properties, Llc | Turbine controller for optimizing economic present value of the turbine |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5341663A (en) * | 1992-04-22 | 1994-08-30 | Aluminum Company Of America | Automatic process control and noise suppression |
US20040095237A1 (en) * | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US6804600B1 (en) * | 2003-09-05 | 2004-10-12 | Honeywell International, Inc. | Sensor error detection and compensation system and method |
CN100594525C (en) * | 2008-01-25 | 2010-03-17 | 华中科技大学 | Data processing system and processing method in industry wireless sensing network |
ES2327488B1 (en) * | 2008-04-15 | 2010-06-18 | GAMESA INNOVATION & TECHNOLOGY, S.L. | A SYSTEM OF EVALUATION AND CONTROL OF THE PERFORMANCE OF A WINDER. |
US8624561B1 (en) | 2009-12-29 | 2014-01-07 | Solarbridge Technologies, Inc. | Power conversion having energy storage with dynamic reference |
EP2531723B1 (en) * | 2010-02-05 | 2016-04-27 | Vestas Wind Systems A/S | Method of operating a wind power plant |
US7987067B2 (en) * | 2010-03-26 | 2011-07-26 | General Electric Company | Method and apparatus for optimizing wind turbine operation |
US20120147637A1 (en) | 2010-12-13 | 2012-06-14 | Northern Power Systems, Inc. | Methods, Systems, and Software for Controlling a Power Converter During Low (Zero)-Voltage Ride-Through Conditions |
US8611107B2 (en) | 2011-04-27 | 2013-12-17 | Solarbridge Technologies, Inc. | Method and system for controlling a multi-stage power inverter |
US8942856B2 (en) | 2011-12-22 | 2015-01-27 | General Electric Company | Power converter and methods of controlling the same |
TWI470151B (en) * | 2011-12-28 | 2015-01-21 | Ind Tech Res Inst | Wind turbine system |
US9490689B2 (en) * | 2012-01-05 | 2016-11-08 | Schneider Electric It Corporation | Methods and apparatus for controlling power switches via a digital communication bus |
CN103216383B (en) * | 2013-04-18 | 2014-10-22 | 北京金风科创风电设备有限公司 | Control system and control method for wind generating set |
-
2014
- 2014-03-21 US US14/221,566 patent/US9157415B1/en active Active
-
2015
- 2015-03-12 CA CA2884649A patent/CA2884649C/en active Active
- 2015-03-17 DE DE102015103952.4A patent/DE102015103952B4/en active Active
- 2015-03-18 DK DKPA201570154A patent/DK179321B1/en active
- 2015-03-20 BR BR102015006271-0A patent/BR102015006271B1/en active IP Right Grant
- 2015-03-23 CN CN201510127013.XA patent/CN104929862B/en active Active
-
2017
- 2017-10-05 DK DKPA201770756A patent/DK179327B1/en active
Patent Citations (58)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4385356A (en) * | 1981-03-30 | 1983-05-24 | United Technologies Corporation | Non-saturating airspeed/attitude controls |
US4477876A (en) * | 1981-03-30 | 1984-10-16 | United Technologies Corporation | Dual response aircraft reference synchronization |
US4371938A (en) * | 1981-03-30 | 1983-02-01 | United Technologies Corporation | Automatic airspeed engage/disengage |
US20020029097A1 (en) * | 2000-04-07 | 2002-03-07 | Pionzio Dino J. | Wind farm control system |
US20030102675A1 (en) * | 2000-04-17 | 2003-06-05 | Umweltkontor Renewable Energy Ag | Power generators and method and device for generating power |
US6429648B1 (en) * | 2000-05-26 | 2002-08-06 | Mitsubishi Denki Kabushiki Kaisha | Current detecting device and current detecting method |
US7099800B2 (en) * | 2001-09-28 | 2006-08-29 | Neg Micon Control Systems A/S | Method and a computer for handling operational data of wind power plants |
US20040230377A1 (en) * | 2003-05-16 | 2004-11-18 | Seawest Holdings, Inc. | Wind power management system and method |
US6925385B2 (en) * | 2003-05-16 | 2005-08-02 | Seawest Holdings, Inc. | Wind power management system and method |
US20050213967A1 (en) * | 2004-03-29 | 2005-09-29 | Fujitsu Limited | Optical wavelength division multiplexing transmission system |
US20070026996A1 (en) * | 2005-08-01 | 2007-02-01 | Toyota Jidosha Kabushiki Kaisha | Shift control apparartus and shift control method of automatic transmission of vehicle |
US7544149B2 (en) * | 2005-08-01 | 2009-06-09 | Toyota Jidosha Kabushiki Kaisha | Shift control apparatus and shift control method of automatic transmission of vehicle |
US20090137361A1 (en) * | 2005-10-26 | 2009-05-28 | Toyota Jidosha Kabushiki Kaisha | Controller for vehicle drive device |
US7798938B2 (en) * | 2005-10-26 | 2010-09-21 | Toyota Jidosha Kabushiki Kaisha | Controller system for device unit of vehicle |
US20070177314A1 (en) * | 2006-01-31 | 2007-08-02 | Haiqing Weng | Method, apparatus and computer program product for injection current |
US7423412B2 (en) * | 2006-01-31 | 2008-09-09 | General Electric Company | Method, apparatus and computer program product for injecting current |
US20070194574A1 (en) * | 2006-02-21 | 2007-08-23 | Nordex Energy Gmbh | Method for the operation of a wind turbine generator system |
US7525209B2 (en) * | 2006-02-21 | 2009-04-28 | Nordex Energy Gmbh | Method for the operation of a wind turbine generator system |
US8169097B2 (en) * | 2006-07-21 | 2012-05-01 | Repower Systems Ag | Method for operating a wind energy installation |
US8660706B2 (en) * | 2007-01-04 | 2014-02-25 | Dewind Co. | SCADA unit |
USRE44464E1 (en) * | 2007-08-02 | 2013-08-27 | Nordex Energy Gmbh | Method and apparatus for determining a characteristic curve for an electric variable of a wind energy plant |
US7826988B2 (en) * | 2007-08-02 | 2010-11-02 | Nordex Energy Gmbh | Method and apparatus for determining a characteristic curve for an electric variable of a wind energy plant |
US8606686B1 (en) * | 2008-03-07 | 2013-12-10 | Versify Solutions, Inc. | System and method for gathering and performing complex analyses on power data from multiple remote sources |
US8761948B1 (en) * | 2008-04-25 | 2014-06-24 | Versify Solutions, Inc. | System and method for managing and monitoring renewable energy power generation |
US8243278B2 (en) * | 2008-05-16 | 2012-08-14 | Integrated Illumination Systems, Inc. | Non-contact selection and control of lighting devices |
US8264172B2 (en) * | 2008-05-16 | 2012-09-11 | Integrated Illumination Systems, Inc. | Cooperative communications with multiple master/slaves in a LED lighting network |
US20100084992A1 (en) * | 2008-05-16 | 2010-04-08 | Charles Bernard Valois | Intensity control and color mixing of light emitting devices |
US20090284184A1 (en) * | 2008-05-16 | 2009-11-19 | Integrated Illumination Systems, Inc. | Cooperative Communications with Multiple Master/Slaves in a Led Lighting Network |
US20090284747A1 (en) * | 2008-05-16 | 2009-11-19 | Charles Bernard Valois | Non-Contact Selection and Control of Lighting Devices |
US20100049486A1 (en) * | 2008-08-22 | 2010-02-25 | General Electric Company | Systems and Methods for Simulating Plant Operations |
US8024492B2 (en) * | 2008-12-23 | 2011-09-20 | Schneider Electric USA, Inc. | System for managing a power monitoring system containing a multiplicity of intelligent electronic devices |
US7804184B2 (en) * | 2009-01-23 | 2010-09-28 | General Electric Company | System and method for control of a grid connected power generating system |
US20100142237A1 (en) * | 2009-01-23 | 2010-06-10 | General Electric Company | System and method for control of a grid connected power generating system |
US8355823B2 (en) * | 2009-05-25 | 2013-01-15 | Vestas Wind Systems A/S | Method and system for controlling operation of a wind turbine |
US8155923B2 (en) * | 2009-06-08 | 2012-04-10 | General Electric Company | System, remote device, and method for validating operation of a wind turbine |
US20100138188A1 (en) * | 2009-06-08 | 2010-06-03 | Amit Vasant Mengane | System, remote device, and method for validating operation of a wind turbine |
US8162788B2 (en) * | 2009-08-27 | 2012-04-24 | General Electric Company | System, device and method for wind turbine control based on operating profiles |
US7908035B2 (en) * | 2009-08-31 | 2011-03-15 | General Electric Company | System and method for wind formulary |
US8180498B2 (en) * | 2009-12-25 | 2012-05-15 | General Electric Company | System and method for monitoring and controlling a wind turbine farm |
US8295987B2 (en) * | 2010-03-31 | 2012-10-23 | General Electric Company | Systems and methods for performance monitoring and identifying upgrades for wind turbines |
US8108080B2 (en) * | 2010-05-28 | 2012-01-31 | Mitsubishi Heavy Industries, Ltd. | Monitoring and control apparatus and method and wind power plant equipped with the same |
US8538593B2 (en) * | 2010-07-02 | 2013-09-17 | Alstom Grid Inc. | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20130140820A1 (en) * | 2010-08-13 | 2013-06-06 | Germán Claudio Tarnowski | Wind-power production with reduced power fluctuations |
US20120041711A1 (en) * | 2010-08-16 | 2012-02-16 | Invensys Systems Inc. | Enhanced Rotation Measurement |
US20110144817A1 (en) * | 2010-08-26 | 2011-06-16 | Ralph Teichmann | Method and apparatus for controlling wind turbine electric power generation |
US8121738B2 (en) * | 2010-08-26 | 2012-02-21 | General Electric Company | Method and apparatus for controlling wind turbine electric power generation |
US20130263928A1 (en) * | 2010-12-27 | 2013-10-10 | Mitsubishi Heavy Industries, Ltd. | Condensate flow rate control device and condensate flow rate control method for power plant |
US20120199411A1 (en) * | 2011-02-07 | 2012-08-09 | Unisia Jkc Steering Systems Co., Ltd. | Variable displacement pump |
US20120249013A1 (en) * | 2011-03-16 | 2012-10-04 | Charles Bernard Valois | System and method for low level dimming |
US20120280625A1 (en) * | 2011-05-05 | 2012-11-08 | I2Systems Inc | Systems and methods for active thermal management |
US8977403B2 (en) * | 2011-06-22 | 2015-03-10 | Mitsubishi Heavy Industries, Ltd. | Remote monitoring apparatus, wind turbine generator system, and method of controlling remote monitoring apparatus |
US20130214534A1 (en) * | 2012-02-21 | 2013-08-22 | Mitsubishi Heavy Industries, Ltd. | Method for operating wind farm and operation control system for wind farm |
US20140064916A1 (en) * | 2012-08-29 | 2014-03-06 | Hon Hai Precision Industry Co., Ltd. | Cooling system and method for data center |
US20140062085A1 (en) * | 2012-08-31 | 2014-03-06 | General Electric Company | Voltage control for wind turbine generators |
US20150021912A1 (en) * | 2013-07-16 | 2015-01-22 | John Bech | Method and arrangement for controlling a wind turbine |
US20150061289A1 (en) * | 2013-09-05 | 2015-03-05 | General Electric Company | System and method for voltage control of wind generators |
US20150061290A1 (en) * | 2013-09-05 | 2015-03-05 | General Electric Company | System and method for voltage control of wind generators |
US9035479B1 (en) * | 2014-07-11 | 2015-05-19 | Wind Stream Properties, Llc | Turbine controller for optimizing economic present value of the turbine |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3470669A1 (en) * | 2017-10-13 | 2019-04-17 | General Electric Company | System and method for mitigating blade run-away loads in the event of a pitch system failure |
US10830208B2 (en) | 2017-10-13 | 2020-11-10 | General Electric Company | System and method for mitigating blade run-away loads in the event of a pitch system failure |
CN113446152A (en) * | 2020-03-27 | 2021-09-28 | 北京金风科创风电设备有限公司 | Variable pitch control method and control system of wind generating set |
Also Published As
Publication number | Publication date |
---|---|
DK179327B1 (en) | 2018-05-07 |
DK201570154A1 (en) | 2015-10-05 |
DK179321B1 (en) | 2018-04-30 |
BR102015006271B1 (en) | 2022-05-10 |
CA2884649C (en) | 2017-03-28 |
CN104929862A (en) | 2015-09-23 |
BR102015006271A2 (en) | 2016-02-10 |
DE102015103952B4 (en) | 2023-02-09 |
CA2884649A1 (en) | 2015-09-21 |
CN104929862B (en) | 2019-05-31 |
DK201770756A1 (en) | 2017-10-16 |
US9157415B1 (en) | 2015-10-13 |
DE102015103952A1 (en) | 2015-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2918825B1 (en) | System and method for initializing a startup sequence of a wind turbine | |
DK201770756A1 (en) | System and method of controlling an electronic component of a wind turbine using contingency communications | |
US10113533B2 (en) | System and method for reducing wind turbine oscillations caused by grid faults | |
US10024305B2 (en) | System and method for stabilizing a wind farm during one or more contingency events | |
EP3205875B1 (en) | System and method for operating a wind turbine | |
US20210135611A1 (en) | System and Method for Designing and Operating a Wind Turbine Power System Based on Statistical Analysis of Operational And/Or Grid Data Thereof | |
EP3723230A1 (en) | System and method for estimating grid strength | |
EP3628860B1 (en) | System and method for initializing startup of a wind turbine | |
US10871145B2 (en) | System and method for preventing voltage collapse of wind turbine power systems connected to a power grid | |
US11013070B2 (en) | System and method for controlling multiple IGBT temperatures in a power converter of an electrical power system | |
EP3462018A1 (en) | Methods for adapting wind farms for grid compliance | |
EP3844388B1 (en) | Trip reduction tool for a wind turbine power system | |
EP3654521B1 (en) | System and method for mitigating overvoltage on a dc link of a power converter | |
US11428209B2 (en) | System and method for operating a wind farm for fast connection after farm shutdown | |
EP3809224A1 (en) | Systems and methods for optimizing scheduling of health checks for wind turbines during periods of low wind speeds |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: GENERAL ELECTRIC COMPANY, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SEYMOUR, ROBERT ALLEN;NOWAK, JAMES MICHAEL;SMITH, DAVID;AND OTHERS;REEL/FRAME:032495/0655 Effective date: 20140321 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
AS | Assignment |
Owner name: GE INFRASTRUCTURE TECHNOLOGY LLC, SOUTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GENERAL ELECTRIC COMPANY;REEL/FRAME:065727/0001 Effective date: 20231110 |