US3848671A - Method of producing bitumen from a subterranean tar sand formation - Google Patents

Method of producing bitumen from a subterranean tar sand formation Download PDF

Info

Publication number
US3848671A
US3848671A US00409063A US40906373A US3848671A US 3848671 A US3848671 A US 3848671A US 00409063 A US00409063 A US 00409063A US 40906373 A US40906373 A US 40906373A US 3848671 A US3848671 A US 3848671A
Authority
US
United States
Prior art keywords
tar sand
bitumen
fluid
wells
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00409063A
Inventor
L Kern
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Atlantic Richfield Co
Original Assignee
Atlantic Richfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Atlantic Richfield Co filed Critical Atlantic Richfield Co
Priority to US00409063A priority Critical patent/US3848671A/en
Priority to CA200,996A priority patent/CA1001550A/en
Application granted granted Critical
Publication of US3848671A publication Critical patent/US3848671A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2401Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/39Cord and rope holders
    • Y10T24/3996Sliding wedge

Definitions

  • Leppink Attorney, Agent, or Firm-Wofford, Felsman, Fails & Zobal ABSTRACT A method of recovering bitumen from a subterranean tar sand formation characterized by a plurality of steps. First, a plurality of wells comprising at least one injection well and at least one production well are drilled from the surface and completed in the tar sand formation. Next, the bitumen and the tar sand formation are heated between the respective injection and production wells sufficiently to render the bitumen feasibly mobile in the tar sand formation. The heating is effected by passing a predetermined electrical current between the wells for a predetermined time.
  • a fluid is injected into the injection well and the bitumen is produced from the production well.
  • the fluid is preferably hot, for example an aqueous fluid such as steam or hot water. Also disclosed are specific details of the respective operational steps, including determining the predetermined time interval of electrical heating; and the use of alternate and/or simultaneous steps of heating with electrical energy and injection and production.
  • this invention relates to a method of recovering the bitumen from the subterranean tar sand formation by thermal means for increasing the mobility of the bitumen in the tar sand formation and, thereafter, driving the mobilized bitumen to one or more production wells.
  • All of the bitumen has a viscosity greater than at least 5,000 centipoises and the majority of the bitumen has a viscosity in the range of 500,000 -5,000,000 centipoises at 50 Fahrenheit (F).
  • the bitumen has a density greater than water at 60F, with a specific gravity equivalent to about 6-l0 API.
  • bitumens are so different from crude oil that, not only are the production problems different, but also the upgrading and refining of the bitumen after being produced presents problems that are unique.
  • the bitumen has to be upgraded by partial coking, by delayed coking with catalytic hydrodesulfurization of the coke or distillate, or by direct catalytic hydrovisbreaking to be salable.
  • the geology of the subterranean tar sand formations is described in detail at page 688 of the above referenced Kirk-Othmer Encyclopedia. This discussion indicates that about only 10 percent of the known bitumen isrecoverable by conventional mining techniques.
  • the subterranean tar sand formation comprises about 99 percent quartz sand and clays.
  • the sand particles are coated with a connate water envelope.
  • the bitumen exists in the interstices intermediate the water enveloped sand grains.
  • the tar sand formation is underlaid and overlaid by impermeable shales having different physical properties. 7
  • bitumen is recovered by steam or hot water extraction and upgraded by processes comprising: (1) thermal cracking and hydrotreating or (2) coking and hydrotreating. Since the price of crude oil has been driven upwardly by the energy storage in some of the more industralized nations, such as the United States, there are pilot operations being conducted'at present to see if some recovery scheme effecting in situ separation of the bitumen from the tar sand can be made economically feasible.
  • the pilot operations have employed a wide variety of different techniques to try to pre-heat the bitumen to attain a mobility sufficient to produce it from the tar sand formation. For example, it has been known to inject hot water or steam to heat soak around a given well and thereafter try to produce the heated and molten" bitumen, or bitumen of reduced viscosity, from the same well.
  • bitumen is produced from a subterranean tar sand formation by the following multi-step process.
  • a plurality of wells are drilled fromthe surface into and completed in the tar sand formation in a predetermined pattern, including at least one injection well and at least one production well.
  • the bitumen and the tar sand formation are pre-heated, to mobilize the bitumen in the tar sand formation, by heating with a predetermined electrical current for a predetermined time interval.
  • a-drive fluid is injected into the injection .well.
  • the fluid can be at an ambient earth surface temperature or heated above ambient but in any case is preferably immiscible with bitumen and, ordinarily, will comprise steam or hot water or a mixture thereof.
  • An ambient earth surface temperature fluid can be liquid water pumped from an unheated lake or other water source on the earths surface directly to an injection well. Alternate slugs of heated fluid and ambient earth surface temperature fluid can be injected. The bitumen is produced from the production well.
  • the steps of pre-heating with the electrical energy and injecting of the fluid may be employed once only, simultaneously, or alternately as desired to attain the desired throughput rate and production rate.
  • FIG. 1 is a side elevational view, partly shcematic and partly in section, illustrating one simplified embodiment of this invention.
  • FIG. 2 is a profile of averaged temperatures through the formation following the step of preheating with electrical energy, in accordance with FIG. 1.
  • a plurality of wells 11 and 13 have been drilled into and completed within the subterranean tar sand formation 15. Each of the wells 11 and 13 have been completed so they may be operated as either injection or production wells. Specifically, the wells have a string of casing 17 that is inserted in the drilled bore hole and cemented in place with the usual foot 19. A perforate conduit 21 extends into the subterranean tar sand formation adjacent the periphery of the wellbore that was drilled thereinto.
  • the perforate conduit 21 includes a lower electrically insulated conduit for constraining the electrically current flow to the subterranean tar sand formation as much as practical.
  • the perforate conduit 21 may be casing having the same or a different diameter from casing 19, or it may be large diameter tubing inserted through the casing 19.
  • the perforate conduit 21 comprises a separate string of conduit extended from the surface for better preserving the heat content of an injected hot fluid.
  • Each of the wells 11 and 13 has an electrode 23.
  • the respective electrodes 23 are connected via electrical conductors 25 and 27 with surface equipment 28 and a source of electrical current, illustrated as alternating current (AC) source 29.
  • the electrical conductors 25 and 27 are insulated between the electrodes 23 and the surface equipment.
  • the surface equipment 28 includes suitable controls that are employed to effect the predetermined current flow.
  • a switch (SW) 31 and voltage control means, such as rheostat 33 are illustrated for controlling the duration and magnitude of the current flow between the electrodes 23 in the wells 11 and 13 by way of the subterranean tar sand formation 15.
  • the alternating current source 29 be adjusted to provide the correct voltage for effecting the currentl flow through the subterranean tar sand formation 15 without requiring much power loss in surface control equipment, exemplified by rheostat 33.
  • the respective electrical conductors 25 and 27 are emplaced in their respective wells 11 and 13 with conventional means. As illustrated, they are run through lubricators 35 in order to allow alternate or simultaneous heating, and injection and production; without having to alter the surface accessories; such as, changing the configuration of the well head 37, with its valves and the like.
  • the illustrated hot fluid injection system comprises a boiler system 41 for injecting steam of slightly less than percent quality. More specifically, the boiler system 41 comprises one or more field boilers with feed pumps and inlet water surge tanks. A minimal water treating facility may be employed if necessary for a particular water source.
  • the boiler system 41 is constructed and operated in accordance with conventional engineering technology that does not, per se, form part of this invention and is well known and is not described in detail herein. The conventional boiler system technology is contained in a number of printed publications which are incorporated herein by reference for details.
  • the perforate conduit 21 in well 13 is connected to surface production facilities by way of a second surface conduit 45.
  • the production facilities are those normally employed for handling normally viscous crude oils and are not shown, since they are well known in the art.
  • the production facilities include such conventional apparatus as heater treaters, separators, and heated storage tanks, as well as the requisite pumping and flow facilities for handling the bitumen.
  • the production facilities also are connected with suitable conventional bitumen processing facilities (also not shown); such as areemployed in the conventional processing of the bitumen after it is recovered from the tar sand formation by surface mining techniques, or otherwise. Since these production and processing facilities do not, per se, form a part of this invention, they are not described in detail herein.
  • the wells 11 and 13 are completed in the tar sand formation 15 in accordance with conventional technology. Specifically, bore holes are drilled, at the desired distance and patterning, from the surface into the subterranean tar sand formation 15. Thereafter, the casing 17 is set into the formation to the desired depth. As illustrated, the casing 17 may comprise a surface string that is cemented into place immediately above the tar sand formation. Thereafter, a second string of casing, including an insulated perforate conduit 21 is emplaced in the respective bore holes and completed in accordance with the desired construction. For example, a perforate conduit 21 may have its foot cemented in place, or it may be installed with a gravel pack or the like to allow for expansion and contraction and still secure the desired injectivity and productivity.
  • the electrodes are thereafter placed in respective wells.
  • the tar sand formation may be from 100 .to 300 feet thick and the respective electrodes 23 may be from 50 to 100 feet or more in length.
  • the electrodes 23 are continuously conductive along their length and are connected with the respective electrical conductors 25 and 27 by conventional techniques.
  • the electrodes 23 may be of copper based alloy and may be connected with copper based conductors 25 and 27 by suitable copper based electrical connectors.
  • the alternating current source 29 is connected with the conductors 25 and 27 by way of the surface control equipment, illustrated simply as switch 31 and rheostat 33.
  • the desired current densities are obtainable without the use of the rheostat, it is set on the zero resistance position to obtain the desired current flow between the wells. Since there will be a high current density immediately adjacent each of the electrodes 23, the temperature will tend to increase more rapidly inthis area. Accordingly, it may be desirable to periodically interrupt the flow of current and inject a small amount of electrolyte around each of the wells in order to keep the conductivity high in this region.
  • the current flow through the tar sand formation to heat the tar sand formation and the bitumen therewithin depends on the connate water envelopes surrounding the sand grains.
  • the temperature in the regions of highest current densities must not be so high as to cause evaporation of the water envelopes at the pressure that is sustainable by the over burden.
  • the predetermined electrical current is maintained low enough to prevent drying of the tar sand formation 15 around the wells 11 and 13.
  • the electrical current will flow primarily through the tar sand formation, although some of the electrical energy will flow through the bitumen-impermeable shales, as illustrated in the dashed lines 47.
  • the voltage and current flow are adjusted to effect the desired gradual increase in temperature of the tar sand formation 15 and the bitumentherein without over heating locally at the points of greatest current density, as indicated hereinbefore.
  • the current may run from a few hundred to 1,000 or more amperes at the voltage drop between the electrodes 23 in the wells 11 and 13. This voltage drop may run froma few hundred volts to as much as 1,000 or more volts.
  • the pre-heating is continued for a predetermined period of time.
  • the predetermined period of time may be between 2 and 4 years.
  • the period of time may be determined empirically, if desired, to check the theoretical, or projected, calculations of the temperature. The empirical determinations resulting from a given test pattern can then be extrapolated to larger production patterns in accordance with conventional technology.
  • the empirical approach is preferred over initiating a commercial venture without a pilot and test pattern in a given tar sand formation.
  • the empirical testing may take the form of testing mobility by the ultimate test of a throughput rate that is sustainable between the injection and production wells. The throughput is evidenced by the injection rate and the production rate both remaining above an equivalent rate in barrels per day.
  • the empirical approach can be employed directly on a commercial scale venture with assurance of ultimate success because of the flexibility of operation inherent in the various embodiments of this invention.
  • the theoretical calculations can be made using conventional computer-based temperature formulae for heating subterranean formations containing the bitumen.
  • the bitumen As the bitumen is heated, it begins to have a greater mobility in the tar sand formation 15. Once the yield point of the bitumen is reached in the tar sand formation, or at least the temperature at which plastic flow begins at the pressure that can be imposed at the injection well, as described hereinafter, mobility begins to make feasible in situ separation. The mobilities or high viscosities of bitumen in the least heated part of the tar sand formation limits a commercially feasible process. As illustrated in FIG.
  • the temperature profile across the formation may be at some hot temperature T adjacent the wells but will be at a relatively significantly cooler temperature T, at the midpoint between the wells.
  • Starting the injection of the hot fluid initiates a complex series of events. These events are affected by the temperatures that have been effected in the tar sand formation and determine what overall throughput rate can be sustained between the injection and production wells.
  • the events are about as follows. As the steam is injected at its injection pressure, it will lose heat to the formation and condense. The losing of the heat will tend to increase the mobility of the bitumen, but the condensation of the steam to a liquid will tend to decrease the overall mobility.
  • the different temperature bitumen moving into different temperature formation creates complex and interrelated pressure, temperature, mobility relationships that are difficult to predict absolutely.
  • the hotter bitumen from near the injection well; for example, at D is forced into the colder formation. It heats up that formation, but the heated bitumen loses heat and becomes less mobile.
  • the preferable approach is to drill a small bore hole from the surface or the earth into the tar sand formation midway between the injection and production wells; for example, at D and measure a temperature profile vertically through the tar sand for.- mation 15 at D Once the temperature in this area has attained the minimum temperature needed; for example, T the electrical heating is discontinued and injection of the steam is started. This observed temperature profile then verifies the theoretical calculations; or indicates the nature and degree of erroneous assumptions. This information is then helpful in determining the correct predetermined time interval over which the electrical heating is carried out before the injection of the drive fluid is started.
  • injection of the drive fluid is started after the predetermined time interval of electrical heating.
  • the fluid is injected at a pressure below that which is sufficient to lift the overburden, ordinarily referred to as fracturing pressure.”
  • the fracturing pressure not only limits the injection pressure; but, as indicated hereinbefore, also limits the pressure and temperature for maintaining the water envelopes on the sand grains for conductivity. It is recognized that the pressure that will effect fracturing with a given overburden depth may be determined in accordance with conventional petroleum engineering technology. A safe and over simplified figure may be taken as one-half pound per square inch (psi) for each foot of overburden depth. Thus, an overburden depth of 1,200 feet will safely sustain an injection pressure, or a pressure necessary to retain saturation around a well, of 600 psi. Ordinarily, a somewhat higher pressure may be employed once the geology of a given overburden site is properly investigated.
  • the injection pressure will probably not exceed 500 pounds per square inch.
  • the temperature adjacent the well must not have been allowed to exceed the saturated steam temperature; for example, about 467F in the exemplified embodiment.
  • the bitumen is produced from the production well 13 by conventional techniques. For example, if it has been rendered mobile enough to flow readily, the injection pressure will be sufficient to cause production of the heated bitumen out of the production well 13 without requiring pumping facilities. On the other hand, with shallow overburdens, it may be economically feasible to install pumping equipment for pumping the bitumen from the production well 13. As illustrated, the injection pressure is employed to effect flow of the hot bitumen from the production well 13 and to the production facilities through surface conduit 45.
  • Breakthrough is defined as the. time at which the injected fluid has established a flow path completely between the injection well and the production well. At some point after breakthrough, the amount of drive fluid being flowed through the formation will become economically infeasible as compared with the volume of bitumen being produced. When the flowthrough of the injected fluid becomes economically infeasible compared with the level of production of the bitumen, the patterning of the wells is shifted. For exainple, the swept out portion of the tar sand formation 15 may be employed as an enlarged effective production area and the two wells 11 and 13 both employed as production wells while a different injection well is employed for effecting flow of the bitumen to the enlarged effective production area.
  • the bitumen in a predetermined pattern can be separated from the sand grains in situ and the bitumen produced to the surface without requiring the handling of the large quantities of sand, as in surface mining technology.
  • the surface mining technology is, as indicated, infeasible for most of subterranean tar sand formations of appreciable depths.
  • the desired throughput rate is established the second time, injection is continued as described hereinbefore. If, on the other hand, the desired throughput rate is not attainable, injection of the steam is stopped and electrical heating again carried out for a predetermined time interval. In any event, ultimately, the desired throughput rate, with the desired injectivity and productivity, will be attained and the bitumen from the pattern will be produced as described hereinbefore.
  • the following example is given to demonstrate a typical process carried out as described hereinbefore with respect to FIGS. 1 and 2.
  • the exemplified tar sand formation had an averaged thickness of feet with an overburden of 1,000 feet in the pattern area.
  • the tar sand formation had an averaged permeability of 700 millidarcies with the overburden and underburden being impermeable shales.
  • the tar sand formation had an averaged porosity of 0.33 with an initial bitumen saturation of 12 percent by weight, when averaged.
  • the averaged electrical resistivity, in ohm-meters at 50F were, respectively:
  • the exemplified pattern was a S-spot over 10 acres.
  • the electrical pre-heating time required was three years and the average electrical power input level for the pattern was 3,100 kilowatts.
  • the total electrical input per pattern 82 X 10 kilowatt hours (kwh).
  • the temperatures T -T represent equal spacing on the ordinate and are 200, 300 and 400, respectively.
  • the minimum temperature T at the distance D; between the injection and production wells was 160F to attain the desired mobility of the bitumen before beginning injection of the steam.
  • the bitumen had measured viscosities at different temperatures as follows:
  • the total pattern productivity after the preheating period was 190 barrels per day.
  • the productivity and injectivity increased to attain a peak pattern productivity of 510 barrels per day.
  • the bitumen produced during the steam drive was 657,000 barrels and required a total water injection, as steam, over the six year period of 1.16 X 10 barrels.
  • any other fluid that will have the desirable flooding characteristics and convey the heat to the tar sand formation 15 may be employed.
  • steam or hot water will be the fluids most commonly available in the field and have greatest feasibility because of their economy.
  • the hot aqueous fluids have a greater macroscopic sweep efficiency for conveying heat to a greater overall portion of the tar sand formation.
  • Hot fluids that are miscible with the bitumen in the tar sand formation are not employed if banking that comes with such miscible fluids requires intolerably high differential pressures to effect flow to the one or more production wells.
  • the miscible fluids have a lower heat capacity and are not as readily available as are the aqueous fluids. Hence, even though the miscible fluids will effect substantially 100 percent recovery on a microscopic sweep efficiency basis in the areas where they flood, they are, ordinarily, less feasible in recovering the bitumen from the tar sand formation.
  • this invention provides a novel and unobvious way of producing bitumen from a tar sand formation that is feasible.
  • This invention overcomes the disadvantages of the prior art processes which have been demonstrated to be inapplicable in recovering bitumen from the tar sand formations heretofore.
  • a method of producing bitumen from a subterranean tar sand formation containing viscous bitumen comprising the steps of:
  • pre-heating said tar sand formation and sand bitumen intermediate said wells sufticiently to render said bitumen mobile within said tar sand formation; said pre-heating being effected by passing a predetermined electrical current from one of said wells to the other of said wells for a predetermined time interval;
  • said predetermined time interval is sufficient to heat said formation and said bitumen to a temperature that will allow a throughput rate of at least 10 barrels per day that is sustained by injection of said fluid in the one or more injection wells adjacent said production well.
  • electrolyte is injected into said tar sand formation for increased electrical conductivity during said simultaneous steps of electrical pre-heating and injecting of fluid.

Abstract

A method of recovering bitumen from a subterranean tar sand formation characterized by a plurality of steps. First, a plurality of wells comprising at least one injection well and at least one production well are drilled from the surface and completed in the tar sand formation. Next, the bitumen and the tar sand formation are heated between the respective injection and production wells sufficiently to render the bitumen feasibly mobile in the tar sand formation. The heating is effected by passing a predetermined electrical current between the wells for a predetermined time. Thereafter, a fluid is injected into the injection well and the bitumen is produced from the production well. The fluid is preferably hot, for example an aqueous fluid such as steam or hot water. Also disclosed are specific details of the respective operational steps, including determining the predetermined time interval of electrical heating; and the use of alternate and/or simultaneous steps of heating with electrical energy and injection and production.

Description

limited States Patent [1 1 Kern [ Nov. 19, 1974 METHOD OF PRODUCING BITUMEN FROM A SUBTERRANEAN TAR SAND FORMATION [75] Inventor: Loyd Rupert Kern, lrving, Tex. [73] Assignee: Atlantic Richfield Company, Los [57] Angeles, Calif.
[22] Filed: Oct. 24, 1973 [21] Appl. No.: 409,063
[52] US. Cl. 166/248, 166/272 [51] E2lb 43/00 [58] Field of Search 166/248, 272, 268, 303
[56] References Cited UNITED STATES PATENTS 1,372,743 3/1921 Gardner 166/60 2,634,961 4/1953 Ljungstrom.... 166/302 2,795,279 6/1957 Sarapuu 166/248 3,062,282 11/1962 Schleicher 166/256 3,385,359 4/1968 Offeringa 166/263 3,507,330 4/1970 Gill 166/248 3,522,848 8/1970 New 166/60 3,605,888 9/1971 Crowson et a1.... 166/248 3,642,066 2/1972 Gill 166/248 3,696,866 10/1972 Dryden 166/248 A.C.SOURCE Primary Examinerlames A. Leppink" Attorney, Agent, or Firm-Wofford, Felsman, Fails & Zobal ABSTRACT A method of recovering bitumen from a subterranean tar sand formation characterized by a plurality of steps. First, a plurality of wells comprising at least one injection well and at least one production well are drilled from the surface and completed in the tar sand formation. Next, the bitumen and the tar sand formation are heated between the respective injection and production wells sufficiently to render the bitumen feasibly mobile in the tar sand formation. The heating is effected by passing a predetermined electrical current between the wells for a predetermined time. Thereafter, a fluid is injected into the injection well and the bitumen is produced from the production well. The fluid is preferably hot, for example an aqueous fluid such as steam or hot water. Also disclosed are specific details of the respective operational steps, including determining the predetermined time interval of electrical heating; and the use of alternate and/or simultaneous steps of heating with electrical energy and injection and production.
16 Claims, 2 Drawing Figures TO PRODUCTION FACILITIES TO PRODUCTRON FACILITIES A.C.SOURCE PATENILL raw 1 91914 WIIFQ 2 DISTANCE (FEET) METHOD OF PRODUCING BITUMEN FROM A SUBTERRANEAN TAR SAND FORMATION BACKGROUND OF THE INVENTION More particularly, this invention relates to a method of recovering the bitumen from the subterranean tar sand formation by thermal means for increasing the mobility of the bitumen in the tar sand formation and, thereafter, driving the mobilized bitumen to one or more production wells.
2. Description of the Prior Art Large deposits of bitumen in surface tar sands, and subterranean tar sand formations have long been known to exist in several nations of the world. These tar sands are discussed in detail in Kirk-Othmer ENCY- CLOPEDIA OF CHEMICAL TECHNOLOGY, Second Edition, Anthony Standen, Editor, lnterscience Publishers, New York, 1969, Vol. 19, Pages 682-732. That discussion points out that the bitumen in the tar sand formations has been carelessly referred to by a variety of names; such as, tar," hydrocarbons and crude oil; but that this is a misnomer, since the bitumen contains nitrogenous compounds, as well as other constituents not usually found in thenamed products. In fact, that discussion goes on to emphasize that the recovery of tar from the tar sand has proved a fertile field for inventors, since almost all of the methods of recovering conventional hydrocarbons are inoperable in the tar sands because of the problem of achieving mobility of the highly viscous bitumen. All of the bitumen has a viscosity greater than at least 5,000 centipoises and the majority of the bitumen has a viscosity in the range of 500,000 -5,000,000 centipoises at 50 Fahrenheit (F). The bitumen has a density greater than water at 60F, with a specific gravity equivalent to about 6-l0 API.
The bitumens are so different from crude oil that, not only are the production problems different, but also the upgrading and refining of the bitumen after being produced presents problems that are unique. For example, the bitumen has to be upgraded by partial coking, by delayed coking with catalytic hydrodesulfurization of the coke or distillate, or by direct catalytic hydrovisbreaking to be salable.
The geology of the subterranean tar sand formations is described in detail at page 688 of the above referenced Kirk-Othmer Encyclopedia. This discussion indicates that about only 10 percent of the known bitumen isrecoverable by conventional mining techniques. The subterranean tar sand formation comprises about 99 percent quartz sand and clays. The sand particles are coated with a connate water envelope. The bitumen exists in the interstices intermediate the water enveloped sand grains. Ordinarily, the tar sand formation is underlaid and overlaid by impermeable shales having different physical properties. 7
A large number ofdifferent techniques have been tried in attempting to feasibly recover the bitumen from the tar sand reservoirs. A large number of these earlier attempts and patent references and the like are catalogued in a comprehesive bibliography entitled Preliminary Report 65--3,Athabasca Oil Sands Bibliography (1789-1964), M. A. Carrigy, comp., Research Council of Alberta, Alberta, Canada 1965. The large number of recovery processes have included a variety of flooding methods, such as fire floods; exotic recovery schemes, such as emulsion steam drives; and even atomic explosions and the like. Despite the large number of processes tried, the only commercial processes are those employing surface mining. Yet, surface mining of tar sand having a 10 percent saturation .requires handling about 2 tons of tar sand per barrel of bitumen recovered. In the commercial processes employing surface mining, the bitumen is recovered by steam or hot water extraction and upgraded by processes comprising: (1) thermal cracking and hydrotreating or (2) coking and hydrotreating. Since the price of crude oil has been driven upwardly by the energy storage in some of the more industralized nations, such as the United States, there are pilot operations being conducted'at present to see if some recovery scheme effecting in situ separation of the bitumen from the tar sand can be made economically feasible. The pilot operations have employed a wide variety of different techniques to try to pre-heat the bitumen to attain a mobility sufficient to produce it from the tar sand formation. For example, it has been known to inject hot water or steam to heat soak around a given well and thereafter try to produce the heated and molten" bitumen, or bitumen of reduced viscosity, from the same well.
To date, however, insofar as I am aware, none of the processes have been provided economically feasible. Thus, it can be seen that the processes that have achieved success in the recovering of the bitumen from the tar sand formations are vastly different from those employed in recovering conventional crude oil; and none of the conventional oil recovery methods or methods attempting separation of the bitumen from the tar sand in situ has proved commercially successful.
SUMMARY OF THE INVENTION Accordingly, it is an object of this invention to provide a method of recovering bitumen from a subterranean tar sand formation by separating the bitumen from the sand in situ, without requiring handling of the large mass of tar sand.
It is another object of this'invention to provide a method of recovering bitumen from a subterranean tar sand formation by thermally mobilizing the bitumen within the tar sand formation such that it can be separated from the tar sandformation in situ; and then driving the mobilized bitumen toward one or more production wells.
These and other objects will become apparent from the descriptive matter hereinafter, particularly when taken in conjunction with the drawings.
In accordance with this invention, bitumen is produced from a subterranean tar sand formation by the following multi-step process. First, a plurality of wells are drilled fromthe surface into and completed in the tar sand formation in a predetermined pattern, including at least one injection well and at least one production well. Next, the bitumen and the tar sand formation are pre-heated, to mobilize the bitumen in the tar sand formation, by heating with a predetermined electrical current for a predetermined time interval. Thereafter, a-drive fluidis injected into the injection .well. The fluid can be at an ambient earth surface temperature or heated above ambient but in any case is preferably immiscible with bitumen and, ordinarily, will comprise steam or hot water or a mixture thereof. An ambient earth surface temperature fluid can be liquid water pumped from an unheated lake or other water source on the earths surface directly to an injection well. Alternate slugs of heated fluid and ambient earth surface temperature fluid can be injected. The bitumen is produced from the production well.
The steps of pre-heating with the electrical energy and injecting of the fluid may be employed once only, simultaneously, or alternately as desired to attain the desired throughput rate and production rate.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a side elevational view, partly shcematic and partly in section, illustrating one simplified embodiment of this invention.
FIG. 2 is a profile of averaged temperatures through the formation following the step of preheating with electrical energy, in accordance with FIG. 1.
DESCRIPTION OF PREFERRED EMBODIMENTS Referring to FIG. 1, a plurality of wells 11 and 13 have been drilled into and completed within the subterranean tar sand formation 15. Each of the wells 11 and 13 have been completed so they may be operated as either injection or production wells. Specifically, the wells have a string of casing 17 that is inserted in the drilled bore hole and cemented in place with the usual foot 19. A perforate conduit 21 extends into the subterranean tar sand formation adjacent the periphery of the wellbore that was drilled thereinto. Preferably, the perforate conduit 21 includes a lower electrically insulated conduit for constraining the electrically current flow to the subterranean tar sand formation as much as practical. The perforate conduit 21 may be casing having the same or a different diameter from casing 19, or it may be large diameter tubing inserted through the casing 19. As illustrated, the perforate conduit 21 comprises a separate string of conduit extended from the surface for better preserving the heat content of an injected hot fluid.
Each of the wells 11 and 13 has an electrode 23. The respective electrodes 23 are connected via electrical conductors 25 and 27 with surface equipment 28 and a source of electrical current, illustrated as alternating current (AC) source 29. The electrical conductors 25 and 27 are insulated between the electrodes 23 and the surface equipment. The surface equipment 28 includes suitable controls that are employed to effect the predetermined current flow. For example, a switch (SW) 31 and voltage control means, such as rheostat 33, are illustrated for controlling the duration and magnitude of the current flow between the electrodes 23 in the wells 11 and 13 by way of the subterranean tar sand formation 15. It is preferred that the alternating current source 29 be adjusted to provide the correct voltage for effecting the currentl flow through the subterranean tar sand formation 15 without requiring much power loss in surface control equipment, exemplified by rheostat 33. The respective electrical conductors 25 and 27 are emplaced in their respective wells 11 and 13 with conventional means. As illustrated, they are run through lubricators 35 in order to allow alternate or simultaneous heating, and injection and production; without having to alter the surface accessories; such as, changing the configuration of the well head 37, with its valves and the like.
As illustrated, the well 11 is connected with a hot fluid injection system by way of suitable insulated surface conduit 39. The illustrated hot fluid injection system comprises a boiler system 41 for injecting steam of slightly less than percent quality. More specifically, the boiler system 41 comprises one or more field boilers with feed pumps and inlet water surge tanks. A minimal water treating facility may be employed if necessary for a particular water source. The boiler system 41 is constructed and operated in accordance with conventional engineering technology that does not, per se, form part of this invention and is well known and is not described in detail herein. The conventional boiler system technology is contained in a number of printed publications which are incorporated herein by reference for details.
The perforate conduit 21 in well 13 is connected to surface production facilities by way of a second surface conduit 45. The production facilities are those normally employed for handling normally viscous crude oils and are not shown, since they are well known in the art. The production facilities include such conventional apparatus as heater treaters, separators, and heated storage tanks, as well as the requisite pumping and flow facilities for handling the bitumen. The production facilities also are connected with suitable conventional bitumen processing facilities (also not shown); such as areemployed in the conventional processing of the bitumen after it is recovered from the tar sand formation by surface mining techniques, or otherwise. Since these production and processing facilities do not, per se, form a part of this invention, they are not described in detail herein.
Operation: In operation, the wells 11 and 13 are completed in the tar sand formation 15 in accordance with conventional technology. Specifically, bore holes are drilled, at the desired distance and patterning, from the surface into the subterranean tar sand formation 15. Thereafter, the casing 17 is set into the formation to the desired depth. As illustrated, the casing 17 may comprise a surface string that is cemented into place immediately above the tar sand formation. Thereafter, a second string of casing, including an insulated perforate conduit 21 is emplaced in the respective bore holes and completed in accordance with the desired construction. For example, a perforate conduit 21 may have its foot cemented in place, or it may be installed with a gravel pack or the like to allow for expansion and contraction and still secure the desired injectivity and productivity.
In any event, the electrodes are thereafter placed in respective wells. For example, the tar sand formation may be from 100 .to 300 feet thick and the respective electrodes 23 may be from 50 to 100 feet or more in length. The electrodes 23 are continuously conductive along their length and are connected with the respective electrical conductors 25 and 27 by conventional techniques. For example, the electrodes 23 may be of copper based alloy and may be connected with copper based conductors 25 and 27 by suitable copper based electrical connectors. Thereafter, the alternating current source 29 is connected with the conductors 25 and 27 by way of the surface control equipment, illustrated simply as switch 31 and rheostat 33. If the desired current densities are obtainable without the use of the rheostat, it is set on the zero resistance position to obtain the desired current flow between the wells. Since there will be a high current density immediately adjacent each of the electrodes 23, the temperature will tend to increase more rapidly inthis area. Accordingly, it may be desirable to periodically interrupt the flow of current and inject a small amount of electrolyte around each of the wells in order to keep the conductivity high in this region. The current flow through the tar sand formation to heat the tar sand formation and the bitumen therewithin depends on the connate water envelopes surrounding the sand grains. Accordingly, the temperature in the regions of highest current densities; for example, in the regions immediately about and adjoining the wells; must not be so high as to cause evaporation of the water envelopes at the pressure that is sustainable by the over burden. Expressed otherwise, the predetermined electrical current is maintained low enough to prevent drying of the tar sand formation 15 around the wells 11 and 13.
The electrical current will flow primarily through the tar sand formation, although some of the electrical energy will flow through the bitumen-impermeable shales, as illustrated in the dashed lines 47. The voltage and current flow are adjusted to effect the desired gradual increase in temperature of the tar sand formation 15 and the bitumentherein without over heating locally at the points of greatest current density, as indicated hereinbefore. For example, the current may run from a few hundred to 1,000 or more amperes at the voltage drop between the electrodes 23 in the wells 11 and 13. This voltage drop may run froma few hundred volts to as much as 1,000 or more volts.
In any event, the pre-heating is continued for a predetermined period of time. For example, the predetermined period of time may be between 2 and 4 years. There will be temperature variations throughout the formation. Even in averaged temperatures, such as illustrated in FIG. 2, there is variance because of the distance between wells and the differences in current densities. The larger cross sectional areas near the midplane between the wells have less current density and, hence, less temperature increase. Also, there are variations because of the heterogeneities in the tar sand formation 15. In any given tar sand formation 15, the period of time may be determined empirically, if desired, to check the theoretical, or projected, calculations of the temperature. The empirical determinations resulting from a given test pattern can then be extrapolated to larger production patterns in accordance with conventional technology. Since the tar sand formation and the bitumen therewithin do not behave in conventional manner, the empirical approach is preferred over initiating a commercial venture without a pilot and test pattern in a given tar sand formation. The empirical testing may take the form of testing mobility by the ultimate test of a throughput rate that is sustainable between the injection and production wells. The throughput is evidenced by the injection rate and the production rate both remaining above an equivalent rate in barrels per day. On the other hand, the empirical approach can be employed directly on a commercial scale venture with assurance of ultimate success because of the flexibility of operation inherent in the various embodiments of this invention.
In any event, the theoretical calculations can be made using conventional computer-based temperature formulae for heating subterranean formations containing the bitumen. As the bitumen is heated, it begins to have a greater mobility in the tar sand formation 15. Once the yield point of the bitumen is reached in the tar sand formation, or at least the temperature at which plastic flow begins at the pressure that can be imposed at the injection well, as described hereinafter, mobility begins to make feasible in situ separation. The mobilities or high viscosities of bitumen in the least heated part of the tar sand formation limits a commercially feasible process. As illustrated in FIG. 2, the temperature profile across the formation may be at some hot temperature T adjacent the wells but will be at a relatively significantly cooler temperature T, at the midpoint between the wells. Starting the injection of the hot fluid initiates a complex series of events. These events are affected by the temperatures that have been effected in the tar sand formation and determine what overall throughput rate can be sustained between the injection and production wells. Greatly simplified, the events are about as follows. As the steam is injected at its injection pressure, it will lose heat to the formation and condense. The losing of the heat will tend to increase the mobility of the bitumen, but the condensation of the steam to a liquid will tend to decrease the overall mobility. Moreover, the different temperature bitumen moving into different temperature formation creates complex and interrelated pressure, temperature, mobility relationships that are difficult to predict absolutely. The hotter bitumen from near the injection well; for example, at D is forced into the colder formation. It heats up that formation, but the heated bitumen loses heat and becomes less mobile. The less heated bitumen from the colder part of the formation; as from D moves, in turn, into the formerly heated'tar sand formation near the production well. Consequently, there will be a decrease in the mobility of the bitumen near the production well at D;, as the bitumen starts to flow toward the production well.
The complicated and interrelated events that determinethroughput; and, hence, productivity; require that the predetermined time interval for electrical heating must be long enough to get an overall mobility of the bitumen that is high enough to sustain a minimum flow through from the one or more injection wells to the one or' more productionwells. If the predicted temperature at the midpoint D intermediate the two wells is inadequate to sustain the minimum flow through, the electrical heating will have to be continued, with or without the simultaneous injection of steam. Thus, empirically, once injection is started, if mobility of the bitumen will sustain a minimum throughput of at least 10 barrels per day, the steam injection is economically preferable over the electrical heating and the injection of steam is continued without the electrical heating.
It is preferable to employ a more scientific approach to empirically verifying the degree of heating of the tar sand formation. The preferable approach is to drill a small bore hole from the surface or the earth into the tar sand formation midway between the injection and production wells; for example, at D and measure a temperature profile vertically through the tar sand for.- mation 15 at D Once the temperature in this area has attained the minimum temperature needed; for example, T the electrical heating is discontinued and injection of the steam is started. This observed temperature profile then verifies the theoretical calculations; or indicates the nature and degree of erroneous assumptions. This information is then helpful in determining the correct predetermined time interval over which the electrical heating is carried out before the injection of the drive fluid is started.
In any event, injection of the drive fluid is started after the predetermined time interval of electrical heating. The fluid is injected at a pressure below that which is sufficient to lift the overburden, ordinarily referred to as fracturing pressure."
The fracturing pressure not only limits the injection pressure; but, as indicated hereinbefore, also limits the pressure and temperature for maintaining the water envelopes on the sand grains for conductivity. It is recognized that the pressure that will effect fracturing with a given overburden depth may be determined in accordance with conventional petroleum engineering technology. A safe and over simplified figure may be taken as one-half pound per square inch (psi) for each foot of overburden depth. Thus, an overburden depth of 1,200 feet will safely sustain an injection pressure, or a pressure necessary to retain saturation around a well, of 600 psi. Ordinarily, a somewhat higher pressure may be employed once the geology of a given overburden site is properly investigated. For example, if there is 1,000 feet of overburden on the tar sand formation 15, the injection pressure will probably not exceed 500 pounds per square inch. In order to have retained a saturated condition and prevent drying out of the tar sand formation immediately adjacent the well because of the high current densities and the high temperature, the temperature adjacent the well must not have been allowed to exceed the saturated steam temperature; for example, about 467F in the exemplified embodiment.
The bitumen is produced from the production well 13 by conventional techniques. For example, if it has been rendered mobile enough to flow readily, the injection pressure will be sufficient to cause production of the heated bitumen out of the production well 13 without requiring pumping facilities. On the other hand, with shallow overburdens, it may be economically feasible to install pumping equipment for pumping the bitumen from the production well 13. As illustrated, the injection pressure is employed to effect flow of the hot bitumen from the production well 13 and to the production facilities through surface conduit 45.
The injectivity and production continues until breakthrough occurs. Breakthrough is defined as the. time at which the injected fluid has established a flow path completely between the injection well and the production well. At some point after breakthrough, the amount of drive fluid being flowed through the formation will become economically infeasible as compared with the volume of bitumen being produced. When the flowthrough of the injected fluid becomes economically infeasible compared with the level of production of the bitumen, the patterning of the wells is shifted. For exainple, the swept out portion of the tar sand formation 15 may be employed as an enlarged effective production area and the two wells 11 and 13 both employed as production wells while a different injection well is employed for effecting flow of the bitumen to the enlarged effective production area.
Thus, by proper patterning and employing the initial pre-heating by use of electrical energy to mobilize the bitumen in the tar sand formation 15, the bitumen in a predetermined pattern can be separated from the sand grains in situ and the bitumen produced to the surface without requiring the handling of the large quantities of sand, as in surface mining technology. The surface mining technology is, as indicated, infeasible for most of subterranean tar sand formations of appreciable depths.
Other Embodiments: As implied hereinbefore, if the desired throughput rate, as indicated by the obtainable injectivity and productivity, is too low; the injection of the steam through injection well 11 is stopped and the electrical heating resumed. In the event that this course is followed, it may be desirable to inject an electrolyte with the latter portions of the steam to again increase the conductivity around the injection well 11. An electrolyte in aqueous solutions, per se, can be injected into the injection and production wells for increased conductivity if desired. Suitable electrolytes include sodium chloride as the most economically feasible, although other beneficial electrolytes may be employed. Such electrolytes include caustics like sodium hydroxide, sodium carbonate, or the like for improving injectivity around the injection well 11. In any event, the electrical heating is continued for another predetermined time interval to obtain a predicted temperature increase and increase in the mobility of the bitumen in the tar sand formation 15. Thereafter, steam is again injected and the bitumen is produced from the produc tion well 13.
If the desired throughput rate is established the second time, injection is continued as described hereinbefore. If, on the other hand, the desired throughput rate is not attainable, injection of the steam is stopped and electrical heating again carried out for a predetermined time interval. In any event, ultimately, the desired throughput rate, with the desired injectivity and productivity, will be attained and the bitumen from the pattern will be produced as described hereinbefore.
On the other hand, it may be possible to inject the steam simultaneously with a sufficient amount of electrolyte to allow concurrent heating with the electrical energy. It is realized that there may be some hazard if the heatingand the injection of steam plus an electro lyte is carried out concurrently. The hazard of electrical shock is not insurmountable, however. Careful insulation and operation can prevent hazard to operating personnel and allow concurrent and simultaneous electrical heating and steam flooding to attain the desired throughput rate.
EXAMPLE The following example is given to demonstrate a typical process carried out as described hereinbefore with respect to FIGS. 1 and 2. The exemplified tar sand formation had an averaged thickness of feet with an overburden of 1,000 feet in the pattern area. The tar sand formation had an averaged permeability of 700 millidarcies with the overburden and underburden being impermeable shales. The tar sand formation had an averaged porosity of 0.33 with an initial bitumen saturation of 12 percent by weight, when averaged. The averaged electrical resistivity, in ohm-meters at 50F, were, respectively:
horizontally 30 vertically 90 The geological formations adjacent the tar sand, as well as the tar sand formation 15, had an initial temperature of 50F, an averaged thermal conductivity, in British Thermal Units per foot per hour per F (BTU/ft-hr-F) of 0.6; and an averaged thermal volumetric heat capacity in BTU per cubic foot per F (BTU/ft -F) of 44.
The exemplified pattern was a S-spot over 10 acres. The electrical pre-heating time required was three years and the average electrical power input level for the pattern was 3,100 kilowatts. Thus, the total electrical input per pattern 82 X 10 kilowatt hours (kwh).
Referring to FIG. 2, the temperature adjacent the respective injection and production wells, equivalent to wells 11 and 13 in FIG. 1, was as follows:
T adjacent the respective wells, 466F. The temperatures T -T represent equal spacing on the ordinate and are 200, 300 and 400, respectively. The minimum temperature T at the distance D; between the injection and production wells was 160F to attain the desired mobility of the bitumen before beginning injection of the steam.
The bitumen had measured viscosities at different temperatures as follows:
50F 2 X 10 centipoises (cp) l60F 1,500 cp 466F 5.4 cp
The total pattern productivity after the preheating period was 190 barrels per day. The productivity and injectivity increased to attain a peak pattern productivity of 510 barrels per day. The bitumen produced during the steam drive was 657,000 barrels and required a total water injection, as steam, over the six year period of 1.16 X 10 barrels.
General: While the injection of steam has been described hereinbefore, any other fluid that will have the desirable flooding characteristics and convey the heat to the tar sand formation 15 may be employed. As a practical matter, steam or hot water will be the fluids most commonly available in the field and have greatest feasibility because of their economy. Moreover, the hot aqueous fluids have a greater macroscopic sweep efficiency for conveying heat to a greater overall portion of the tar sand formation. Hot fluids that are miscible with the bitumen in the tar sand formation are not employed if banking that comes with such miscible fluids requires intolerably high differential pressures to effect flow to the one or more production wells. Ordinarily, also, the miscible fluids have a lower heat capacity and are not as readily available as are the aqueous fluids. Hence, even though the miscible fluids will effect substantially 100 percent recovery on a microscopic sweep efficiency basis in the areas where they flood, they are, ordinarily, less feasible in recovering the bitumen from the tar sand formation.
From the foregoing descriptive matter, it can be seen that this invention provides a novel and unobvious way of producing bitumen from a tar sand formation that is feasible. This invention overcomes the disadvantages of the prior art processes which have been demonstrated to be inapplicable in recovering bitumen from the tar sand formations heretofore.
Having thus described the invention, it will be understood that such description has been given by way of illustration and example and not by way of limitation, reference for the latter purpose being had to the appended claims.
What is claimed is:
1. A method of producing bitumen from a subterranean tar sand formation containing viscous bitumen comprising the steps of:
a. drilling and completing a plurality of at least two wells extending from the surface into said tar sand formation for production of said bitumen therefrom; at least one said well being completed as an injection well and at least one said well being com pleted as a production well; said wells being spaced apart and arranged in a predetermined pattern;
b, pre-heating said tar sand formation and sand bitumen intermediate said wells sufticiently to render said bitumen mobile within said tar sand formation; said pre-heating being effected by passing a predetermined electrical current from one of said wells to the other of said wells for a predetermined time interval; I
. thereafter injecting a fluid that is immiscible with said bitumen through said injection well and into said tar sand formation; and
d. producing said bitumen from said production well.
2. The method of claim 1 wherein said predetermined time interval is sufficient to heat said formation and said bitumen to a temperature that will allow a throughput rate of at least 10 barrels per day that is sustained by injection of said fluid in the one or more injection wells adjacent said production well.
3. The method of claim 1 wherein said predetermined electrical current is maintained low enough to prevent drying said tar sand formation around said wells and said tar sand formation around said wells is maintained electrically conductive.
4. The method of claim 1 wherein said fluid is steam.
5. The method of claim 1 wherein said fluid is hot water.
6. The method of claim 1 wherein said fluid comprises a mixture of steam and hot water.
7. The method of claim 1 wherein said fluid is injected for a time interval and stopped; and electrical heating is again begun and continued for a predetermined time interval; and said injection of said fluid is again commenced; and wherein the steps of said heat ing and of said injection of said fluid are effected alternately until a desired rate of flow through said forma tion is effected.
8. The method of claim 1 wherein said electrical preheating is continued after said fluid is begun to be injected such that said steps of electrical pre-heating and of injecting of said fluid are carried out simultaneously until a desired throughput rate is effected.
9. The method of claim 1 wherein said plurality of wells are completed so as to be operable as either injection or production wells and wherein the injection and production patterning is altered after predetermined production intervals to effect a more nearly complete sweep of said bitumen from said tar sand formation.
14. The method of claim 7 wherein electrolyte is injected into said tar sand formation for increased electrical conductivity during said alternate electrical heating steps.
15. The method of claim 8 wherein electrolyte is injected into said tar sand formation for increased electrical conductivity during said simultaneous steps of electrical pre-heating and injecting of fluid.
16. The method of claim 1 wherein alternate slugs of hot fluid and ambient earth surface temperature fluid are injected into said tar sand formation.

Claims (16)

1. A METHOD OF PRODUCING BITUMENT FROM A SUBTERRANEAN TAR SAND FORMATION CONTAINING VISCOUS BITUMEN COMPRISING THE STEPS OF: A. DRILLING AND COMPLETING A PLURALITY OF AT LEAST TWO WELLS EXTENDING FROM THE SURFACE INTO SAID TAR SAND FORMATION FOR PRODUCTION OF SAID BITUMENT THEREFROM; AT LEAST ONE SAID WELL BEING COMPLETED AS AN INJECTION WELL AND AT LEAST ONE SAID WELL BEING COMPLETED AS A PRODUCTION WELL; SAID WELLS BEING SPACED APART AND ARRANGED IN A PREDETERMINED PATTERN; B. PRE-HEATING SAID TAR SAND FORMATION AND SAND BITUMENT INTERMEDIATE SAID WELLS SUFFICIENTLY TO RENDER SAID BITUMEN MOBILE WITHIN SAID TAR SAND FORMATION; SAID PRE-HEATING BEING EFFECTIVE BY PASSING A PREDETERMINED ELECTRICAL CURRENT FROM ONE OF SAID WELLS TO THE OTHER OF SAID WELLS FOR A PREDETERMINED TIME INTERVAL; C. THEREAFTER INJECTING A FLUID THAT IS IMMISCIBLE WITH SAID BITUMEN THROUGH SAID INJECTION WELL AND INTO SAID TAR SAND FORMATION; AND D. PRODUCING SAID BITUMENT FROM SAID PRODUCTION WELL.
2. The method of claim 1 wherein said predetermined time interval is sufficient to heat said formation and said bitumen to a temperature that will allow a throughput rate of at least 10 barrels per day that is sustained by injection of said fluid in the one or more injection wells adjacent said production well.
3. The method of claim 1 wherein said predetermined electrical current is maintained low enough to prevent drying said tar sand formation around said wells and said tar sand formation around said wells is maintained electrically conductive.
4. The method of claim 1 wherein said fluid is steam.
5. The method of claim 1 wherein said fluid is hot water.
6. The method of claim 1 wherein said fluid comprises a mixture of steam and hot water.
7. The method of claim 1 wherein said fluid is injected for a time interval and stopped; and electrical heating is again begun and continued for a predetermined time interval; and said injection of said fluid is again commenced; and wherein the steps of said heating and of said injection of said fluid are effected alternately until a desired rate of flow through said formation is effected.
8. The method of claim 1 wherein said electrical pre-heating is continued after said fluid is begun to be injected such that said steps of electrical pre-heating and of injecting of said fluid are carried out simultaneously until a desired throughput rate is effected.
9. The method of claim 1 wherein said plurality of wells are completed so as to be operable as either injection or production wells and wherein The injection and production patterning is altered after predetermined production intervals to effect a more nearly complete sweep of said bitumen from said tar sand formation.
10. The method of claim 1 wherein said fluid is liquid water at ambient earth surface temperature.
11. The method of claim 1 wherein electrolyte is employed in at least one well to improve the electrical conductivity in and around said well.
12. The method of claim 11 wherein electrolyte is employed in at least one injection well and in at least one production well.
13. The method of claim 1 wherein electrolyte is injected into said tar sand formation for increased electrical conductivity between injection and production wells.
14. The method of claim 7 wherein electrolyte is injected into said tar sand formation for increased electrical conductivity during said alternate electrical heating steps.
15. The method of claim 8 wherein electrolyte is injected into said tar sand formation for increased electrical conductivity during said simultaneous steps of electrical pre-heating and injecting of fluid.
16. The method of claim 1 wherein alternate slugs of hot fluid and ambient earth surface temperature fluid are injected into said tar sand formation.
US00409063A 1973-10-24 1973-10-24 Method of producing bitumen from a subterranean tar sand formation Expired - Lifetime US3848671A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US00409063A US3848671A (en) 1973-10-24 1973-10-24 Method of producing bitumen from a subterranean tar sand formation
CA200,996A CA1001550A (en) 1973-10-24 1974-05-28 Method of producing bitumen from a subterranean tar sand formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US00409063A US3848671A (en) 1973-10-24 1973-10-24 Method of producing bitumen from a subterranean tar sand formation

Publications (1)

Publication Number Publication Date
US3848671A true US3848671A (en) 1974-11-19

Family

ID=23618907

Family Applications (1)

Application Number Title Priority Date Filing Date
US00409063A Expired - Lifetime US3848671A (en) 1973-10-24 1973-10-24 Method of producing bitumen from a subterranean tar sand formation

Country Status (2)

Country Link
US (1) US3848671A (en)
CA (1) CA1001550A (en)

Cited By (68)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3946809A (en) * 1974-12-19 1976-03-30 Exxon Production Research Company Oil recovery by combination steam stimulation and electrical heating
US3948319A (en) * 1974-10-16 1976-04-06 Atlantic Richfield Company Method and apparatus for producing fluid by varying current flow through subterranean source formation
US3972372A (en) * 1975-03-10 1976-08-03 Fisher Sidney T Exraction of hydrocarbons in situ from underground hydrocarbon deposits
US4084637A (en) * 1976-12-16 1978-04-18 Petro Canada Exploration Inc. Method of producing viscous materials from subterranean formations
US4228853A (en) * 1978-06-21 1980-10-21 Harvey A Herbert Petroleum production method
US4412585A (en) * 1982-05-03 1983-11-01 Cities Service Company Electrothermal process for recovering hydrocarbons
US4499948A (en) * 1983-12-12 1985-02-19 Atlantic Richfield Company Viscous oil recovery using controlled pressure well pair drainage
US4545435A (en) * 1983-04-29 1985-10-08 Iit Research Institute Conduction heating of hydrocarbonaceous formations
US4558737A (en) * 1981-12-18 1985-12-17 Kuznetsov Oleg L Downhole thermoacoustic device
US4579173A (en) * 1983-09-30 1986-04-01 Exxon Research And Engineering Co. Magnetized drive fluids
US4641709A (en) * 1985-05-17 1987-02-10 Conoco Inc. Controlling steam distribution
US4645004A (en) * 1983-04-29 1987-02-24 Iit Research Institute Electro-osmotic production of hydrocarbons utilizing conduction heating of hydrocarbonaceous formations
US4662438A (en) * 1985-07-19 1987-05-05 Uentech Corporation Method and apparatus for enhancing liquid hydrocarbon production from a single borehole in a slowly producing formation by non-uniform heating through optimized electrode arrays surrounding the borehole
US4886118A (en) * 1983-03-21 1989-12-12 Shell Oil Company Conductively heating a subterranean oil shale to create permeability and subsequently produce oil
US4926941A (en) * 1989-10-10 1990-05-22 Shell Oil Company Method of producing tar sand deposits containing conductive layers
US5042579A (en) * 1990-08-23 1991-08-27 Shell Oil Company Method and apparatus for producing tar sand deposits containing conductive layers
US5046559A (en) * 1990-08-23 1991-09-10 Shell Oil Company Method and apparatus for producing hydrocarbon bearing deposits in formations having shale layers
US5060726A (en) * 1990-08-23 1991-10-29 Shell Oil Company Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication
US5065819A (en) * 1990-03-09 1991-11-19 Kai Technologies Electromagnetic apparatus and method for in situ heating and recovery of organic and inorganic materials
US5109927A (en) * 1991-01-31 1992-05-05 Supernaw Irwin R RF in situ heating of heavy oil in combination with steam flooding
WO1992015770A1 (en) * 1991-03-04 1992-09-17 Kai Technologies, Inc. Electromagnetic method and apparatus for the decontamination of hazardous material-containing volumes
US5255742A (en) * 1992-06-12 1993-10-26 Shell Oil Company Heat injection process
US5297626A (en) * 1992-06-12 1994-03-29 Shell Oil Company Oil recovery process
US5318124A (en) * 1991-11-14 1994-06-07 Pecten International Company Recovering hydrocarbons from tar sand or heavy oil reservoirs
US5325918A (en) * 1993-08-02 1994-07-05 The United States Of America As Represented By The United States Department Of Energy Optimal joule heating of the subsurface
US5829528A (en) * 1997-03-31 1998-11-03 Enhanced Energy, Inc. Ignition suppression system for down hole antennas
US5829519A (en) * 1997-03-10 1998-11-03 Enhanced Energy, Inc. Subterranean antenna cooling system
US6199634B1 (en) 1998-08-27 2001-03-13 Viatchelav Ivanovich Selyakov Method and apparatus for controlling the permeability of mineral bearing earth formations
US20050024284A1 (en) * 2003-07-14 2005-02-03 Halek James Michael Microwave demulsification of hydrocarbon emulsion
WO2009049358A1 (en) * 2007-10-15 2009-04-23 Gomez Rodolfo Antonio M Apparatus and process for extracting oil and gas from oil shale and tar sand deposits
WO2010028917A1 (en) * 2008-09-15 2010-03-18 Siemens Aktiengesellschaft Method for extracting bitumen and/or ultra-heavy oil from an underground deposit, associated installation and operating method for said installation
US20100219106A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Constant specific gravity heat minimization
US20100219184A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Applicator and method for rf heating of material
US20100219105A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Rf heating to reduce the use of supplemental water added in the recovery of unconventional oil
US20100219843A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Dielectric characterization of bituminous froth
US20100223011A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Reflectometry real time remote sensing for in situ hydrocarbon processing
US20100218940A1 (en) * 2009-03-02 2010-09-02 Harris Corporation In situ loop antenna arrays for subsurface hydrocarbon heating
US20100219182A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Apparatus and method for heating material by adjustable mode rf heating antenna array
US20100219108A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Carbon strand radio frequency heating susceptor
US20100219107A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
US20100318360A1 (en) * 2009-06-10 2010-12-16 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for extracting messages
US20110012718A1 (en) * 2009-07-16 2011-01-20 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for detecting gaps between objects
US20110091311A1 (en) * 2009-10-19 2011-04-21 Toyota Motor Engineering & Manufacturing North America High efficiency turbine system
US20110153617A1 (en) * 2009-12-18 2011-06-23 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for describing and organizing image data
US20120312538A1 (en) * 2010-02-22 2012-12-13 Michael Koolman Device and method for obtaining, in particular in situ, a substance containing carbon from an underground deposit
US8373516B2 (en) 2010-10-13 2013-02-12 Harris Corporation Waveguide matching unit having gyrator
US8424621B2 (en) 2010-07-23 2013-04-23 Toyota Motor Engineering & Manufacturing North America, Inc. Omni traction wheel system and methods of operating the same
US8443887B2 (en) 2010-11-19 2013-05-21 Harris Corporation Twinaxial linear induction antenna array for increased heavy oil recovery
US8450664B2 (en) 2010-07-13 2013-05-28 Harris Corporation Radio frequency heating fork
US8453739B2 (en) 2010-11-19 2013-06-04 Harris Corporation Triaxial linear induction antenna array for increased heavy oil recovery
US8511378B2 (en) 2010-09-29 2013-08-20 Harris Corporation Control system for extraction of hydrocarbons from underground deposits
US8616273B2 (en) 2010-11-17 2013-12-31 Harris Corporation Effective solvent extraction system incorporating electromagnetic heating
US8646527B2 (en) 2010-09-20 2014-02-11 Harris Corporation Radio frequency enhanced steam assisted gravity drainage method for recovery of hydrocarbons
US8648760B2 (en) 2010-06-22 2014-02-11 Harris Corporation Continuous dipole antenna
US8692170B2 (en) 2010-09-15 2014-04-08 Harris Corporation Litz heating antenna
US8695702B2 (en) 2010-06-22 2014-04-15 Harris Corporation Diaxial power transmission line for continuous dipole antenna
US8763692B2 (en) 2010-11-19 2014-07-01 Harris Corporation Parallel fed well antenna array for increased heavy oil recovery
US8763691B2 (en) 2010-07-20 2014-07-01 Harris Corporation Apparatus and method for heating of hydrocarbon deposits by axial RF coupler
US8772683B2 (en) 2010-09-09 2014-07-08 Harris Corporation Apparatus and method for heating of hydrocarbon deposits by RF driven coaxial sleeve
US8789599B2 (en) 2010-09-20 2014-07-29 Harris Corporation Radio frequency heat applicator for increased heavy oil recovery
US8807220B2 (en) 2010-09-15 2014-08-19 Conocophillips Company Simultaneous conversion and recovery of bitumen using RF
US8877041B2 (en) 2011-04-04 2014-11-04 Harris Corporation Hydrocarbon cracking antenna
US20160024901A1 (en) * 2013-03-13 2016-01-28 Jilin University Method for heating oil shale subsurface in-situ
US20160160624A1 (en) * 2014-12-04 2016-06-09 Erik H. Clayton Bulk Heating a Subsurface Formation
US10344579B2 (en) * 2013-11-06 2019-07-09 Cnooc Petroleum North America Ulc Processes for producing hydrocarbons from a reservoir
US10697280B2 (en) 2015-04-03 2020-06-30 Rama Rau YELUNDUR Apparatus and method of focused in-situ electrical heating of hydrocarbon bearing formations
US11352867B2 (en) * 2020-08-26 2022-06-07 Saudi Arabian Oil Company Enhanced hydrocarbon recovery with electric current
US11642709B1 (en) 2021-03-04 2023-05-09 Trs Group, Inc. Optimized flux ERH electrode

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9115576B2 (en) 2012-11-14 2015-08-25 Harris Corporation Method for producing hydrocarbon resources with RF and conductive heating and related apparatuses
US9057259B2 (en) 2013-02-01 2015-06-16 Harris Corporation Hydrocarbon resource recovery apparatus including a transmission line with fluid tuning chamber and related methods
US9267365B2 (en) 2013-02-01 2016-02-23 Harris Corporation Apparatus for heating a hydrocarbon resource in a subterranean formation providing an adjustable liquid coolant and related methods
US9157305B2 (en) 2013-02-01 2015-10-13 Harris Corporation Apparatus for heating a hydrocarbon resource in a subterranean formation including a fluid balun and related methods
US9404352B2 (en) 2013-02-01 2016-08-02 Harris Corporation Transmission line segment coupler defining fluid passage ways and related methods

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1372743A (en) * 1920-07-01 1921-03-29 Gardner Benjamin Fulton System for removing obstructions to the flow of fluid in the earth strata adjacent to wells
US2634961A (en) * 1946-01-07 1953-04-14 Svensk Skifferolje Aktiebolage Method of electrothermal production of shale oil
US2795279A (en) * 1952-04-17 1957-06-11 Electrotherm Res Corp Method of underground electrolinking and electrocarbonization of mineral fuels
US3062282A (en) * 1958-01-24 1962-11-06 Phillips Petroleum Co Initiation of in situ combustion in a carbonaceous stratum
US3385359A (en) * 1966-03-18 1968-05-28 Shell Oil Co Method of producing hydrocarbons from a subsurface formation by thermal treatment
US3507330A (en) * 1968-09-30 1970-04-21 Electrothermic Co Method and apparatus for secondary recovery of oil
US3522848A (en) * 1967-05-29 1970-08-04 Robert V New Apparatus for production amplification by stimulated emission of radiation
US3605888A (en) * 1969-10-21 1971-09-20 Electrothermic Co Method and apparatus for secondary recovery of oil
US3642066A (en) * 1969-11-13 1972-02-15 Electrothermic Co Electrical method and apparatus for the recovery of oil
US3696866A (en) * 1971-01-27 1972-10-10 Us Interior Method for producing retorting channels in shale deposits

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1372743A (en) * 1920-07-01 1921-03-29 Gardner Benjamin Fulton System for removing obstructions to the flow of fluid in the earth strata adjacent to wells
US2634961A (en) * 1946-01-07 1953-04-14 Svensk Skifferolje Aktiebolage Method of electrothermal production of shale oil
US2795279A (en) * 1952-04-17 1957-06-11 Electrotherm Res Corp Method of underground electrolinking and electrocarbonization of mineral fuels
US3062282A (en) * 1958-01-24 1962-11-06 Phillips Petroleum Co Initiation of in situ combustion in a carbonaceous stratum
US3385359A (en) * 1966-03-18 1968-05-28 Shell Oil Co Method of producing hydrocarbons from a subsurface formation by thermal treatment
US3522848A (en) * 1967-05-29 1970-08-04 Robert V New Apparatus for production amplification by stimulated emission of radiation
US3507330A (en) * 1968-09-30 1970-04-21 Electrothermic Co Method and apparatus for secondary recovery of oil
US3605888A (en) * 1969-10-21 1971-09-20 Electrothermic Co Method and apparatus for secondary recovery of oil
US3642066A (en) * 1969-11-13 1972-02-15 Electrothermic Co Electrical method and apparatus for the recovery of oil
US3696866A (en) * 1971-01-27 1972-10-10 Us Interior Method for producing retorting channels in shale deposits

Cited By (107)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3948319A (en) * 1974-10-16 1976-04-06 Atlantic Richfield Company Method and apparatus for producing fluid by varying current flow through subterranean source formation
US3946809A (en) * 1974-12-19 1976-03-30 Exxon Production Research Company Oil recovery by combination steam stimulation and electrical heating
US3972372A (en) * 1975-03-10 1976-08-03 Fisher Sidney T Exraction of hydrocarbons in situ from underground hydrocarbon deposits
US4084637A (en) * 1976-12-16 1978-04-18 Petro Canada Exploration Inc. Method of producing viscous materials from subterranean formations
US4228853A (en) * 1978-06-21 1980-10-21 Harvey A Herbert Petroleum production method
US4558737A (en) * 1981-12-18 1985-12-17 Kuznetsov Oleg L Downhole thermoacoustic device
US4412585A (en) * 1982-05-03 1983-11-01 Cities Service Company Electrothermal process for recovering hydrocarbons
US4886118A (en) * 1983-03-21 1989-12-12 Shell Oil Company Conductively heating a subterranean oil shale to create permeability and subsequently produce oil
US4645004A (en) * 1983-04-29 1987-02-24 Iit Research Institute Electro-osmotic production of hydrocarbons utilizing conduction heating of hydrocarbonaceous formations
US4545435A (en) * 1983-04-29 1985-10-08 Iit Research Institute Conduction heating of hydrocarbonaceous formations
US4579173A (en) * 1983-09-30 1986-04-01 Exxon Research And Engineering Co. Magnetized drive fluids
US4499948A (en) * 1983-12-12 1985-02-19 Atlantic Richfield Company Viscous oil recovery using controlled pressure well pair drainage
US4641709A (en) * 1985-05-17 1987-02-10 Conoco Inc. Controlling steam distribution
US4662438A (en) * 1985-07-19 1987-05-05 Uentech Corporation Method and apparatus for enhancing liquid hydrocarbon production from a single borehole in a slowly producing formation by non-uniform heating through optimized electrode arrays surrounding the borehole
US4926941A (en) * 1989-10-10 1990-05-22 Shell Oil Company Method of producing tar sand deposits containing conductive layers
US5065819A (en) * 1990-03-09 1991-11-19 Kai Technologies Electromagnetic apparatus and method for in situ heating and recovery of organic and inorganic materials
US5152341A (en) * 1990-03-09 1992-10-06 Raymond S. Kasevich Electromagnetic method and apparatus for the decontamination of hazardous material-containing volumes
US5060726A (en) * 1990-08-23 1991-10-29 Shell Oil Company Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication
US5042579A (en) * 1990-08-23 1991-08-27 Shell Oil Company Method and apparatus for producing tar sand deposits containing conductive layers
US5046559A (en) * 1990-08-23 1991-09-10 Shell Oil Company Method and apparatus for producing hydrocarbon bearing deposits in formations having shale layers
US5109927A (en) * 1991-01-31 1992-05-05 Supernaw Irwin R RF in situ heating of heavy oil in combination with steam flooding
WO1992015770A1 (en) * 1991-03-04 1992-09-17 Kai Technologies, Inc. Electromagnetic method and apparatus for the decontamination of hazardous material-containing volumes
US5318124A (en) * 1991-11-14 1994-06-07 Pecten International Company Recovering hydrocarbons from tar sand or heavy oil reservoirs
USRE35696E (en) * 1992-06-12 1997-12-23 Shell Oil Company Heat injection process
US5297626A (en) * 1992-06-12 1994-03-29 Shell Oil Company Oil recovery process
US5255742A (en) * 1992-06-12 1993-10-26 Shell Oil Company Heat injection process
US5325918A (en) * 1993-08-02 1994-07-05 The United States Of America As Represented By The United States Department Of Energy Optimal joule heating of the subsurface
US5829519A (en) * 1997-03-10 1998-11-03 Enhanced Energy, Inc. Subterranean antenna cooling system
US5829528A (en) * 1997-03-31 1998-11-03 Enhanced Energy, Inc. Ignition suppression system for down hole antennas
US6199634B1 (en) 1998-08-27 2001-03-13 Viatchelav Ivanovich Selyakov Method and apparatus for controlling the permeability of mineral bearing earth formations
US20050024284A1 (en) * 2003-07-14 2005-02-03 Halek James Michael Microwave demulsification of hydrocarbon emulsion
US7486248B2 (en) 2003-07-14 2009-02-03 Integrity Development, Inc. Microwave demulsification of hydrocarbon emulsion
US20090146897A1 (en) * 2003-07-14 2009-06-11 James Michael Halek Microwave demulsification of hydrocarbon emulsion
US7889146B2 (en) 2003-07-14 2011-02-15 Enhanced Energy, Inc. Microwave demulsification of hydrocarbon emulsion
WO2009049358A1 (en) * 2007-10-15 2009-04-23 Gomez Rodolfo Antonio M Apparatus and process for extracting oil and gas from oil shale and tar sand deposits
WO2010028917A1 (en) * 2008-09-15 2010-03-18 Siemens Aktiengesellschaft Method for extracting bitumen and/or ultra-heavy oil from an underground deposit, associated installation and operating method for said installation
US8739866B2 (en) 2008-09-15 2014-06-03 Siemens Aktiengesellschaft Method for extracting bitumen and/or ultra-heavy oil from an underground deposit, associated installation and operating method for said installation
RU2480579C2 (en) * 2008-09-15 2013-04-27 Сименс Акциенгезелльшафт Method to produce bitumens or extra heavy fraction of oil from underground field, plant for its realisation and method of this plant operation
US20110227349A1 (en) * 2008-09-15 2011-09-22 Norbert Huber Method for extracting bitumen and/or ultra-heavy oil from an underground deposit, associated installation and operating method for said installation
US8120369B2 (en) 2009-03-02 2012-02-21 Harris Corporation Dielectric characterization of bituminous froth
US20100219105A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Rf heating to reduce the use of supplemental water added in the recovery of unconventional oil
US20100219182A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Apparatus and method for heating material by adjustable mode rf heating antenna array
US20100219108A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Carbon strand radio frequency heating susceptor
US20100219107A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
US20100218940A1 (en) * 2009-03-02 2010-09-02 Harris Corporation In situ loop antenna arrays for subsurface hydrocarbon heating
US8674274B2 (en) 2009-03-02 2014-03-18 Harris Corporation Apparatus and method for heating material by adjustable mode RF heating antenna array
US20100223011A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Reflectometry real time remote sensing for in situ hydrocarbon processing
US20100219106A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Constant specific gravity heat minimization
US8887810B2 (en) * 2009-03-02 2014-11-18 Harris Corporation In situ loop antenna arrays for subsurface hydrocarbon heating
US20100219843A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Dielectric characterization of bituminous froth
US8101068B2 (en) 2009-03-02 2012-01-24 Harris Corporation Constant specific gravity heat minimization
CN102341564A (en) * 2009-03-02 2012-02-01 哈里公司 In situ loop antenna arrays for subsurface hydrocarbon heating
US8494775B2 (en) 2009-03-02 2013-07-23 Harris Corporation Reflectometry real time remote sensing for in situ hydrocarbon processing
US8128786B2 (en) 2009-03-02 2012-03-06 Harris Corporation RF heating to reduce the use of supplemental water added in the recovery of unconventional oil
US8133384B2 (en) 2009-03-02 2012-03-13 Harris Corporation Carbon strand radio frequency heating susceptor
US9034176B2 (en) 2009-03-02 2015-05-19 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
US8729440B2 (en) 2009-03-02 2014-05-20 Harris Corporation Applicator and method for RF heating of material
US10772162B2 (en) 2009-03-02 2020-09-08 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
US8337769B2 (en) 2009-03-02 2012-12-25 Harris Corporation Carbon strand radio frequency heating susceptor
US10517147B2 (en) 2009-03-02 2019-12-24 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
CN102341564B (en) * 2009-03-02 2015-06-17 哈里公司 In situ loop antenna arrays for subsurface hydrocarbon heating
US9872343B2 (en) 2009-03-02 2018-01-16 Harris Corporation Radio frequency heating of petroleum ore by particle susceptors
US20100219184A1 (en) * 2009-03-02 2010-09-02 Harris Corporation Applicator and method for rf heating of material
US9328243B2 (en) 2009-03-02 2016-05-03 Harris Corporation Carbon strand radio frequency heating susceptor
US9273251B2 (en) 2009-03-02 2016-03-01 Harris Corporation RF heating to reduce the use of supplemental water added in the recovery of unconventional oil
US8452599B2 (en) 2009-06-10 2013-05-28 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for extracting messages
US20100318360A1 (en) * 2009-06-10 2010-12-16 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for extracting messages
US8269616B2 (en) 2009-07-16 2012-09-18 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for detecting gaps between objects
US20110012718A1 (en) * 2009-07-16 2011-01-20 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for detecting gaps between objects
US20110091311A1 (en) * 2009-10-19 2011-04-21 Toyota Motor Engineering & Manufacturing North America High efficiency turbine system
US8405722B2 (en) 2009-12-18 2013-03-26 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for describing and organizing image data
US8237792B2 (en) 2009-12-18 2012-08-07 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for describing and organizing image data
US20110153617A1 (en) * 2009-12-18 2011-06-23 Toyota Motor Engineering & Manufacturing North America, Inc. Method and system for describing and organizing image data
US9175545B2 (en) * 2010-02-22 2015-11-03 Siemens Aktiengesellschaft Device and method for obtaining, in particular in situ, a substance containing carbon from an underground deposit
US20120312538A1 (en) * 2010-02-22 2012-12-13 Michael Koolman Device and method for obtaining, in particular in situ, a substance containing carbon from an underground deposit
US8648760B2 (en) 2010-06-22 2014-02-11 Harris Corporation Continuous dipole antenna
US8695702B2 (en) 2010-06-22 2014-04-15 Harris Corporation Diaxial power transmission line for continuous dipole antenna
US8450664B2 (en) 2010-07-13 2013-05-28 Harris Corporation Radio frequency heating fork
US8763691B2 (en) 2010-07-20 2014-07-01 Harris Corporation Apparatus and method for heating of hydrocarbon deposits by axial RF coupler
US8424621B2 (en) 2010-07-23 2013-04-23 Toyota Motor Engineering & Manufacturing North America, Inc. Omni traction wheel system and methods of operating the same
US8772683B2 (en) 2010-09-09 2014-07-08 Harris Corporation Apparatus and method for heating of hydrocarbon deposits by RF driven coaxial sleeve
US8807220B2 (en) 2010-09-15 2014-08-19 Conocophillips Company Simultaneous conversion and recovery of bitumen using RF
US8692170B2 (en) 2010-09-15 2014-04-08 Harris Corporation Litz heating antenna
US8789599B2 (en) 2010-09-20 2014-07-29 Harris Corporation Radio frequency heat applicator for increased heavy oil recovery
US8783347B2 (en) 2010-09-20 2014-07-22 Harris Corporation Radio frequency enhanced steam assisted gravity drainage method for recovery of hydrocarbons
US8646527B2 (en) 2010-09-20 2014-02-11 Harris Corporation Radio frequency enhanced steam assisted gravity drainage method for recovery of hydrocarbons
US9322257B2 (en) 2010-09-20 2016-04-26 Harris Corporation Radio frequency heat applicator for increased heavy oil recovery
US8511378B2 (en) 2010-09-29 2013-08-20 Harris Corporation Control system for extraction of hydrocarbons from underground deposits
US10083256B2 (en) 2010-09-29 2018-09-25 Harris Corporation Control system for extraction of hydrocarbons from underground deposits
US8373516B2 (en) 2010-10-13 2013-02-12 Harris Corporation Waveguide matching unit having gyrator
US8776877B2 (en) 2010-11-17 2014-07-15 Harris Corporation Effective solvent extraction system incorporating electromagnetic heating
US8616273B2 (en) 2010-11-17 2013-12-31 Harris Corporation Effective solvent extraction system incorporating electromagnetic heating
US9739126B2 (en) 2010-11-17 2017-08-22 Harris Corporation Effective solvent extraction system incorporating electromagnetic heating
US10082009B2 (en) 2010-11-17 2018-09-25 Harris Corporation Effective solvent extraction system incorporating electromagnetic heating
US8453739B2 (en) 2010-11-19 2013-06-04 Harris Corporation Triaxial linear induction antenna array for increased heavy oil recovery
US8763692B2 (en) 2010-11-19 2014-07-01 Harris Corporation Parallel fed well antenna array for increased heavy oil recovery
US8443887B2 (en) 2010-11-19 2013-05-21 Harris Corporation Twinaxial linear induction antenna array for increased heavy oil recovery
US9375700B2 (en) 2011-04-04 2016-06-28 Harris Corporation Hydrocarbon cracking antenna
US8877041B2 (en) 2011-04-04 2014-11-04 Harris Corporation Hydrocarbon cracking antenna
US9784084B2 (en) * 2013-03-13 2017-10-10 Jilin University Method for heating oil shale subsurface in-situ
US20160024901A1 (en) * 2013-03-13 2016-01-28 Jilin University Method for heating oil shale subsurface in-situ
US10344579B2 (en) * 2013-11-06 2019-07-09 Cnooc Petroleum North America Ulc Processes for producing hydrocarbons from a reservoir
US20160160624A1 (en) * 2014-12-04 2016-06-09 Erik H. Clayton Bulk Heating a Subsurface Formation
US10697280B2 (en) 2015-04-03 2020-06-30 Rama Rau YELUNDUR Apparatus and method of focused in-situ electrical heating of hydrocarbon bearing formations
US10822934B1 (en) 2015-04-03 2020-11-03 Rama Rau YELUNDUR Apparatus and method of focused in-situ electrical heating of hydrocarbon bearing formations
US11352867B2 (en) * 2020-08-26 2022-06-07 Saudi Arabian Oil Company Enhanced hydrocarbon recovery with electric current
US11642709B1 (en) 2021-03-04 2023-05-09 Trs Group, Inc. Optimized flux ERH electrode

Also Published As

Publication number Publication date
CA1001550A (en) 1976-12-14

Similar Documents

Publication Publication Date Title
US3848671A (en) Method of producing bitumen from a subterranean tar sand formation
US3958636A (en) Production of bitumen from a tar sand formation
CA1158155A (en) Thermal recovery of viscous hydrocarbons using arrays of radially spaced horizontal wells
US4412585A (en) Electrothermal process for recovering hydrocarbons
US4640352A (en) In-situ steam drive oil recovery process
CA2049627C (en) Recovering hydrocarbons from hydrocarbon bearing deposits
US3946809A (en) Oil recovery by combination steam stimulation and electrical heating
US4390067A (en) Method of treating reservoirs containing very viscous crude oil or bitumen
CA1117004A (en) Petroleum production method
US5407009A (en) Process and apparatus for the recovery of hydrocarbons from a hydrocarbon deposit
US3513914A (en) Method for producing shale oil from an oil shale formation
US3692111A (en) Stair-step thermal recovery of oil
US4460044A (en) Advancing heated annulus steam drive
US7857056B2 (en) Hydrocarbon recovery from impermeable oil shales using sets of fluid-heated fractures
US4489783A (en) Viscous oil recovery method
US3554285A (en) Production and upgrading of heavy viscous oils
US4415034A (en) Electrode well completion
US4466485A (en) Viscous oil recovery method
US4522260A (en) Method for creating a zone of increased permeability in hydrocarbon-containing subterranean formation penetrated by a plurality of wellbores
US2946382A (en) Process for recovering hydrocarbons from underground formations
US3913671A (en) Recovery of petroleum from viscous petroleum containing formations including tar sand deposits
US3847219A (en) Producing oil from tar sand
US5014787A (en) Single well injection and production system
US4503910A (en) Viscous oil recovery method
US20130008651A1 (en) Method for hydrocarbon recovery using sagd and infill wells with rf heating