WO2003094414A3 - Valuing and optimizing scheduling of generation assets - Google Patents
Valuing and optimizing scheduling of generation assets Download PDFInfo
- Publication number
- WO2003094414A3 WO2003094414A3 PCT/US2003/008367 US0308367W WO03094414A3 WO 2003094414 A3 WO2003094414 A3 WO 2003094414A3 US 0308367 W US0308367 W US 0308367W WO 03094414 A3 WO03094414 A3 WO 03094414A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- facilities
- determining
- valuing
- decision tree
- dynamic programming
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Abstract
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2003225856A AU2003225856A1 (en) | 2002-05-03 | 2003-03-19 | Valuing and optimizing scheduling of generation assets |
EP03747567A EP1509825A4 (en) | 2002-05-03 | 2003-03-19 | Valuing and optimizing scheduling of generation assets |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US37770902P | 2002-05-03 | 2002-05-03 | |
US60/377,709 | 2002-05-03 | ||
US10/336,541 | 2003-01-02 | ||
US10/336,541 US7474995B2 (en) | 2002-05-03 | 2003-01-02 | Valuing and optimizing scheduling of generation assets |
US10/336,542 | 2003-01-02 | ||
US10/336,542 US7389209B2 (en) | 2002-05-03 | 2003-01-02 | Valuing and optimizing scheduling of generation assets for a group of facilities |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2003094414A2 WO2003094414A2 (en) | 2003-11-13 |
WO2003094414A3 true WO2003094414A3 (en) | 2004-06-17 |
Family
ID=29407752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2003/008367 WO2003094414A2 (en) | 2002-05-03 | 2003-03-19 | Valuing and optimizing scheduling of generation assets |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1509825A4 (en) |
AU (1) | AU2003225856A1 (en) |
WO (1) | WO2003094414A2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7698233B1 (en) | 2007-01-23 | 2010-04-13 | Southern Company Services, Inc. | System and method for determining expected unserved energy to quantify generation reliability risks |
US20150184549A1 (en) | 2013-12-31 | 2015-07-02 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
US9957843B2 (en) | 2013-12-31 | 2018-05-01 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
CN109711728B (en) * | 2018-12-27 | 2023-04-18 | 陕西师范大学 | Double-layer multi-target power dispatching method based on power uncertainty and low-carbon appeal |
CN111817302A (en) * | 2020-07-31 | 2020-10-23 | 三峡大学 | Load operation optimization method considering flexibility potential |
CN112965374B (en) * | 2021-02-02 | 2022-11-01 | 郑州轻工业大学 | Method for disassembling and scheduling in consideration of random demand and operation time under resource constraint |
CN116914861B (en) * | 2023-09-12 | 2024-01-23 | 南方电网数字电网研究院有限公司 | Wind power station economic optimization scheduling method and system based on model predictive control |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6021402A (en) * | 1997-06-05 | 2000-02-01 | International Business Machines Corporaiton | Risk management system for electric utilities |
US6185483B1 (en) * | 1998-01-27 | 2001-02-06 | Johnson Controls, Inc. | Real-time pricing controller of an energy storage medium |
US6223101B1 (en) * | 1997-06-30 | 2001-04-24 | Kabushiki Kaisha Toshiba | District heat supply plant controller |
US6321207B1 (en) * | 1999-04-15 | 2001-11-20 | I2 Technologies Us, Inc. | System and method for optimizing the allocation of a resource |
-
2003
- 2003-03-19 WO PCT/US2003/008367 patent/WO2003094414A2/en not_active Application Discontinuation
- 2003-03-19 EP EP03747567A patent/EP1509825A4/en not_active Ceased
- 2003-03-19 AU AU2003225856A patent/AU2003225856A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6021402A (en) * | 1997-06-05 | 2000-02-01 | International Business Machines Corporaiton | Risk management system for electric utilities |
US6223101B1 (en) * | 1997-06-30 | 2001-04-24 | Kabushiki Kaisha Toshiba | District heat supply plant controller |
US6185483B1 (en) * | 1998-01-27 | 2001-02-06 | Johnson Controls, Inc. | Real-time pricing controller of an energy storage medium |
US6321207B1 (en) * | 1999-04-15 | 2001-11-20 | I2 Technologies Us, Inc. | System and method for optimizing the allocation of a resource |
Non-Patent Citations (1)
Title |
---|
See also references of EP1509825A4 * |
Also Published As
Publication number | Publication date |
---|---|
EP1509825A2 (en) | 2005-03-02 |
AU2003225856A1 (en) | 2003-11-17 |
WO2003094414A2 (en) | 2003-11-13 |
AU2003225856A8 (en) | 2003-11-17 |
EP1509825A4 (en) | 2006-09-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Najafi et al. | A stochastic bilevel model for the energy hub manager problem | |
Fang et al. | Strategic scheduling of energy storage for load serving entities in locational marginal pricing market | |
Moreira et al. | An adjustable robust optimization approach for contingency-constrained transmission expansion planning | |
Olsson et al. | Modeling real-time balancing power market prices using combined SARIMA and Markov processes | |
Chevallier | Banking and borrowing in the EU ETS: A review of economic modelling, current provisions and prospects for future design | |
Reddy et al. | Optimum day-ahead clearing of energy and reserve markets with wind power generation using anticipated real-time adjustment costs | |
WO2003077072A3 (en) | Clickstream analysis methods and systems | |
WO2005033840A3 (en) | An optimal method, system, and storage medium for resolving demand and supply imbalances | |
WO2002067401A3 (en) | Decision support for automated power trading | |
GB2434671A (en) | Global asset risk management system and methods | |
WO2005013055A3 (en) | Method and apparatus for trading energy commitments | |
WO2003085493A3 (en) | Method and system for predicting multi-variable outcomes | |
Mazengia | Forecasting spot electricity market prices using time series models | |
Karamdel et al. | Robust expansion co‐planning of electricity and natural gas infrastructures for multi energy‐hub systems with high penetration of renewable energy sources | |
JP2008225755A (en) | Power transaction prediction system and power transaction prediction program | |
Ghorani et al. | Risk-based networked-constrained unit commitment considering correlated power system uncertainties | |
WO2003094414A3 (en) | Valuing and optimizing scheduling of generation assets | |
Khoshjahan et al. | Developing new participation model of thermal generating units in flexible ramping market | |
Ellabban et al. | Optimal hybrid microgrid sizing framework for the mining industry with three case studies from Australia | |
Pourahmadi et al. | Economically optimal uncertainty set characterization for power system operational flexibility | |
Swain et al. | Population variant differential evolution–based multiobjective economic emission load dispatch | |
Deng et al. | A real options approach for pricing electricity tolling agreements | |
AU2002358515A1 (en) | Method and device for the computer-implemented processing of electronic payment orders | |
Vardanyan et al. | Hydropower bidding strategies to day-ahead and real-time markets: different approaches | |
Lim et al. | Optimisation of Industry Revolution 4.0 Implementation Strategy for Palm Oil Industry in Cyber Security. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2003747567 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 2003747567 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |