The read latency caused by job start preparation of a future job is at least partly hidden within the current job by reading information for job start preparation of the future job integrated with the execution of the current job. Instructions for job start preparation are preferably instrumented (701)...http://www.google.de/patents/US7565658?utm_source=gb-gplus-sharePatent US7565658 - Hidden job start preparation in an instruction-parallel processor system