CN103970641A - Equipment expansion method based on capacity prediction technology - Google Patents

Equipment expansion method based on capacity prediction technology Download PDF

Info

Publication number
CN103970641A
CN103970641A CN201410205026.XA CN201410205026A CN103970641A CN 103970641 A CN103970641 A CN 103970641A CN 201410205026 A CN201410205026 A CN 201410205026A CN 103970641 A CN103970641 A CN 103970641A
Authority
CN
China
Prior art keywords
equipment
capacity
unit
dilatation
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410205026.XA
Other languages
Chinese (zh)
Inventor
刘成平
张东
刘正伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Electronic Information Industry Co Ltd
Original Assignee
Inspur Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Electronic Information Industry Co Ltd filed Critical Inspur Electronic Information Industry Co Ltd
Priority to CN201410205026.XA priority Critical patent/CN103970641A/en
Publication of CN103970641A publication Critical patent/CN103970641A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an equipment expansion method based on the capacity prediction technology. The method involves an equipment monitoring unit, a capacity prediction unit and an equipment expansion unit. According to usage amount increment prediction of each equipment node, node use sustainable times are evaluated automatically, the sustainable times of the nodes are ordered, an expansion strategy is conducted on the equipment with less sustainable time automatically according to a set expansion plan, overall operation of a resource center is guaranteed to the maximum degree, and single-node faults are avoided; the problem of equipment maintenance is solved fundamentally, and the problem of unpredictability of equipment maintenance of the resource center is thoroughly solved.

Description

A kind of equipment expansion method based on capacity predict technology
Technical field
The present invention relates to computing application technology, cloud computing field, be specifically related to a kind of equipment expansion method based on capacity predict technology.
Background technology
Current resource center's equipment is more, use amount is also more and more, therefore the utilization factor of disk also can become more and more higher, equipment causes maintenance work heavy more, often cause unable to do what one wants very much to doly, equipment component, in the time lacking periodic maintenance machine-processed, will exist disk to write the full situation about safeguarding in time of but can not get, thereby affect the business of moving on computing machine, cause damage to user.So in the maintenance process of computing machine, the generation of this type of situation of minimizing of all can idea managing.In the maintenance process of computing machine, the generation that how to reduce above-mentioned situation has also just become the problem of our care.
Current computer manufacturer solution, general scheme is that the disk entering there being capacity alarm by the hard disk utilization rate of monitoring computer is safeguarded, although can solve some above-mentioned problems, so do not tackle the problem at its root but appoint, thoroughly solve the Unpredictability of resource center's plant maintenance, thoroughly from heavy planning, free, accomplish all planned following, all are all in grasp.The workload of safeguarding in order to reduce to the full extent resource center reaches the hardware device at reserved resource center and the object of customer service simultaneously, and we propose a kind of general; flexibly; equipment expansion method, reaches and economizes on resources to the full extent, reduces the object of maintenance cost.
Summary of the invention
The weak point existing for prior art, the invention provides a kind of general, flexibly, resource apparatus expansion method.
The invention provides a kind of equipment expansion method based on capacity predict technology, its technical scheme that solve the technical problem employing is as follows: the described equipment expansion method based on capacity predict technology, rely on the use amount incremental forecasting of each device node, what automatic evaluation node used can supporting time, and can sort by supporting time each node, can be according to the expansion plan of setting, automatically for the equipment that has less supporting time is carried out dilatation strategy, the overall operation at Support Resource center to the full extent, avoids the generation of single node fault; The architecture of the method comprises: monitoring of equipment unit, capacity predict unit and equipment dilatation unit; Wherein
Described monitoring of equipment unit: major function is to collect the capacity data of monitoring node, data hard disk size and the service condition of each node device of monitoring resource center, and the result of monitoring is sent to capacity predict unit;
Described capacity predict unit: major function is the use amount incremental analysis of each node, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can supporting time sequence, filter out the equipment that needs in the recent period dilatation, and result is sent to equipment dilatation unit;
Described equipment dilatation unit: major function is to increase the hard-disk capacity of node device, delay apparatus can supporting time.
The beneficial effect of the equipment expansion method based on capacity predict technology disclosed by the invention is:
This equipment expansion method based on capacity predict technology relies on the use amount incremental forecasting of each device node, what automatic evaluation node used can supporting time, fundamentally solve plant maintenance problem, thoroughly solve the Unpredictability of resource center's plant maintenance, thoroughly from heavy planning, free, reduce to the full extent the workload that resource center safeguards, reached the hardware device at reserved resource center and the object of customer service simultaneously; Accomplish all planned following, all are all in grasp; Strengthen function and the reliability of server product by this equipment expansion method based on capacity predict technology, improved product competitiveness.
Brief description of the drawings
Accompanying drawing 1 is common resources central apparatus dilatation schematic diagram;
Accompanying drawing 2 is the resource center's equipment dilatation schematic diagram based on capacity predict.
Embodiment
Below by embodiment and accompanying drawing, the equipment expansion method based on capacity predict technology of the present invention is described in further details, do not cause limitation of the present invention.
Equipment expansion method based on capacity predict technology of the present invention, rely on the use amount incremental forecasting of each device node, what automatic evaluation node used can supporting time, and can sort by supporting time each node, can be according to the expansion plan of setting, automatically for the equipment that has less supporting time is carried out dilatation strategy.The overall operation at Support Resource center to the full extent, avoids the generation of single node fault.The architecture of the method comprises: monitoring of equipment unit, capacity predict unit, equipment dilatation unit.
Respectively each ingredient of the method is described below:
Described monitoring of equipment unit: major function is to collect the capacity data of monitoring node, data hard disk size and the service condition of each node device of monitoring resource center, and the result of monitoring is sent to capacity predict unit;
Described capacity predict unit: major function is the use amount incremental analysis of each node, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can supporting time sequence, filter out the equipment that needs in the recent period dilatation, and result is sent to equipment dilatation unit;
Described equipment dilatation unit: major function is to increase the hard-disk capacity of node device, delay apparatus can supporting time.
In addition, monitoring of equipment of the present invention unit, can monitor the data hard disk size of each equipment of resource center, and the routine use situation of each equipment, and result is sent to capacity predict unit;
Described capacity predict unit, according to the device data disk size getting, and equipment routine use amount, calculate the service time that remaining disk size can support; Wherein, equipment routine use amount is according to the hard disk information of collecting, calculate the use amount of hard disk every day, statistics some days (more than 2 days) in the situation that, calculate the mean value of disk use amount every day as the standard value of equipment routine use amount, if when the use amount of some day is these standard value level several times, when more than 10 times, not as the effective number of days that calculates routine use amount, this use amount can be in disk total amount direct deduction, the calculating that can make like this can supporting time more accurate.Can supporting time according to the equipment operation calculating, filter out the equipment that needs at first dilatation in the recent period, and result is sent to equipment dilatation unit;
Described equipment dilatation unit, according to the equipment in the capacity expansion list receiving, the dilatation strategy of sequence starting equipment.For the equipment that has preliminary data dish, automatically start preliminary data dish, increase the hard-disk capacity of this equipment.For the equipment that there is no preliminary data dish, send notice to equipment manager, so that manual this equipment is safeguarded.
The specific implementation process of the equipment expansion method based on capacity predict technology of the present invention is:
1) collect the capacity data of monitoring each node device by monitoring of equipment unit, the while use amount of the each equipment of feedback capacity predicting unit at set intervals; And the result of monitoring is sent to capacity predict unit;
2) by the use amount increment of each node device of capacity predict element analysis, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can supporting time sequence, filter out the equipment of the joint that needs in the recent period dilatation; And result is sent to equipment dilatation unit;
3) increase the hard-disk capacity of node device by equipment dilatation unit, delay apparatus can supporting time: if the equipment of joint has preliminary data dish,, by remote command, automatically complete the hard disk dilatation work of node device; If node device is not supported automatic dilatation, send notice to equipment manager by system, manually finishing equipment dilatation work.
Embodiment:
With reference to the accompanying drawings 2, content of the present invention is described with an instantiation, realize the detailed process of this method: architecture of the present invention mainly comprises: monitoring of equipment list, capacity predict unit and equipment dilatation unit; Wherein:
1) monitoring of equipment unit major function is to collect the capacity data of monitoring node, collect the capacity data of each node device of monitoring by monitoring of equipment unit, for example, the equipment 1(capacity 20T herein collecting), equipment 2(capacity 20T), equipment 3(capacity 20T), equipment 4(capacity 30T), equipment 5(capacity 30T), simultaneously every the use amount of the 1 hour each equipment of feedback capacity predicting unit;
2) capacity predict unit major function is the use amount incremental analysis of each node, by the use amount increment of each node device of capacity predict element analysis, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can sort by supporting time, filter out the equipment that needs in the recent period dilatation.The result of statistics is continuous 30 days of equipment 1 herein, and the hard disk use amount of every day is 50G, and the number of days that equipment 1 can support is 266 days (20T*0.65=13T; 13*1024/50=266 days); Equipment 2 uses 30 days continuously, and wherein having one day use amount is 2T, and the average of all the other number of days use amounts is 5G, according to exclusionary rules, use amount is 2T one day not as the calculated factor of use amount every day; Supported number of days that can computing equipment 2 is 1024 days (20T*0.25=5T; 5*1024/5=1024 days); Same principle can computing equipment 3 can supporting time be 25 days by the Monitoring Data obtaining; Equipment 4 is 70 days; Equipment 5 is 316 days; By sequence that can supporting time, can obtain needing the equipment of dilatation is equipment 3, equipment 4; And result is sent to equipment dilatation unit;
3) equipment dilatation unit major function is the hard-disk capacity that increases node device, increase the hard-disk capacity of node device by equipment dilatation unit, delay apparatus can supporting time, for example obtaining after the capacity expansion application of equipment 3, equipment 4, equipment 3 has 50T data disks for subsequent use, can pass through remote command, the hard disk dilatation of finishing equipment 3 work automatically; 4 of equipment are not supported automatic dilatation, send notice to equipment manager by system, and manually finishing equipment dilatation work compared with traditional mode, is safeguarded more precisely, more succinctly laborsaving.
The foregoing is only embodiments of the invention, within the spirit and principles in the present invention all, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (4)

1. the equipment expansion method based on capacity predict technology, it is characterized in that, this equipment expansion method relies on the use amount incremental forecasting of each device node, what automatic evaluation node used can supporting time, and can sort by supporting time each node, can be according to the expansion plan of setting, automatically for the equipment that has less supporting time is carried out dilatation strategy; The architecture of the method comprises: monitoring of equipment unit, capacity predict unit and equipment dilatation unit; Wherein
Described monitoring of equipment unit: major function is to collect the capacity data of monitoring node, data hard disk size and the service condition of each node device of monitoring resource center, and the result of monitoring is sent to capacity predict unit;
Described capacity predict unit: major function is the use amount incremental analysis of each node, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can supporting time sequence, filter out the equipment that needs in the recent period dilatation, and result is sent to equipment dilatation unit;
Described equipment dilatation unit: major function is to increase the hard-disk capacity of node device, delay apparatus can supporting time.
2. the equipment expansion method based on capacity predict technology according to claim 1, it is characterized in that, described capacity predict unit, according to the device data disk size getting, and equipment routine use amount, calculate the service time that remaining disk size can support; Wherein, equipment routine use amount is according to the hard disk information of collecting, calculate the use amount of hard disk every day, the in the situation that of above in the some skies of statistics, calculate the mean value of disk use amount every day as the standard value of equipment routine use amount, can supporting time according to the equipment operation calculating, filter out the equipment that needs at first dilatation in the recent period, and result is sent to equipment dilatation unit.
3. the equipment expansion method based on capacity predict technology according to claim 1, is characterized in that, described equipment dilatation unit, and according to the equipment in the capacity expansion list receiving, the dilatation strategy of sequence starting equipment; For the equipment that has preliminary data dish, automatically start preliminary data dish, increase the hard-disk capacity of this equipment; For the equipment that there is no preliminary data dish, send notice to equipment manager, so that manual maintenance equipment.
4. the equipment expansion method based on capacity predict technology according to claim 1, is characterized in that, the specific implementation process of described equipment expansion method is:
1) collect the capacity data of monitoring each node device by monitoring of equipment unit, the while use amount of the each equipment of feedback capacity predicting unit at set intervals; And the result of monitoring is sent to capacity predict unit;
2) by the use amount increment of each node device of capacity predict element analysis, and according to the hard-disk capacity of each node, predict that each node can support the time normally, and can supporting time sequence, filter out the equipment of the joint that needs in the recent period dilatation; And result is sent to equipment dilatation unit;
3) increase the hard-disk capacity of node device by equipment dilatation unit, delay apparatus can supporting time: if the equipment of joint has preliminary data dish,, by remote command, automatically complete the hard disk dilatation work of node device; If node device is not supported automatic dilatation, send notice to equipment manager by system, manually finishing equipment dilatation work.
CN201410205026.XA 2014-05-15 2014-05-15 Equipment expansion method based on capacity prediction technology Pending CN103970641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410205026.XA CN103970641A (en) 2014-05-15 2014-05-15 Equipment expansion method based on capacity prediction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410205026.XA CN103970641A (en) 2014-05-15 2014-05-15 Equipment expansion method based on capacity prediction technology

Publications (1)

Publication Number Publication Date
CN103970641A true CN103970641A (en) 2014-08-06

Family

ID=51240171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410205026.XA Pending CN103970641A (en) 2014-05-15 2014-05-15 Equipment expansion method based on capacity prediction technology

Country Status (1)

Country Link
CN (1) CN103970641A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104202371A (en) * 2014-08-20 2014-12-10 浙江宇视科技有限公司 Cross-device dilation method and device based on iSCSI block direct storage
CN104394539A (en) * 2014-08-12 2015-03-04 浪潮通信信息系统有限公司 Configurable network element capacity evaluation method
CN104898988A (en) * 2015-06-02 2015-09-09 浪潮电子信息产业股份有限公司 Method for acquiring total capacity of storage server hard disks
CN105094708A (en) * 2015-08-25 2015-11-25 北京百度网讯科技有限公司 Method and apparatus for predicting disk capacity
CN108268363A (en) * 2016-12-31 2018-07-10 中国移动通信集团山西有限公司 For the method and apparatus of volume of business management
CN108845881A (en) * 2018-05-30 2018-11-20 有米科技股份有限公司 The method and device of server capacity dynamic adjustment
CN109189323A (en) * 2018-07-06 2019-01-11 华为技术有限公司 Expansion method and equipment
CN109901967A (en) * 2019-01-22 2019-06-18 无锡华云数据技术服务有限公司 Storage pool residual capacity pot life predictor method, electronic equipment, storage medium
CN110377228A (en) * 2019-06-19 2019-10-25 深圳壹账通智能科技有限公司 Automatic expansion method, device, O&M terminal and the storage medium of block chain node
CN110489062A (en) * 2019-08-27 2019-11-22 浪潮云信息技术有限公司 A kind of disk expansion method and system based on OpenStack environment
CN110753366A (en) * 2018-07-24 2020-02-04 中国移动通信集团浙江有限公司 Prediction processing method and device for industry short message gateway capacity
CN111625196A (en) * 2020-05-26 2020-09-04 北京海益同展信息科技有限公司 Block chain node capacity expansion method and device, computer equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6148335A (en) * 1997-11-25 2000-11-14 International Business Machines Corporation Performance/capacity management framework over many servers
CN1605060A (en) * 2001-12-17 2005-04-06 国际商业机器公司 Automatic data interpretation and implementation using performance capacity management framework over many servers
CN101236480A (en) * 2007-01-29 2008-08-06 株式会社日立制作所 Storage module and capacity pool free capacity adjustment method
CN102143206A (en) * 2010-12-17 2011-08-03 浪潮(北京)电子信息产业有限公司 Storage pool regulation method, device and system for cluster storage system
CN102713824A (en) * 2009-10-29 2012-10-03 康德斯威技术公司 Allocating storage memory based on future use estimates
CN103365781A (en) * 2012-03-29 2013-10-23 国际商业机器公司 Method and device for dynamically reconfiguring storage system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6148335A (en) * 1997-11-25 2000-11-14 International Business Machines Corporation Performance/capacity management framework over many servers
CN1605060A (en) * 2001-12-17 2005-04-06 国际商业机器公司 Automatic data interpretation and implementation using performance capacity management framework over many servers
CN101236480A (en) * 2007-01-29 2008-08-06 株式会社日立制作所 Storage module and capacity pool free capacity adjustment method
CN102713824A (en) * 2009-10-29 2012-10-03 康德斯威技术公司 Allocating storage memory based on future use estimates
CN102143206A (en) * 2010-12-17 2011-08-03 浪潮(北京)电子信息产业有限公司 Storage pool regulation method, device and system for cluster storage system
CN103365781A (en) * 2012-03-29 2013-10-23 国际商业机器公司 Method and device for dynamically reconfiguring storage system

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104394539A (en) * 2014-08-12 2015-03-04 浪潮通信信息系统有限公司 Configurable network element capacity evaluation method
CN104394539B (en) * 2014-08-12 2017-07-21 浪潮通信信息系统有限公司 A kind of configurable NE capacity appraisal procedure
CN104202371B (en) * 2014-08-20 2017-11-03 浙江宇视科技有限公司 A kind of striding equipment expansion method and device directly deposited based on iSCSI blocks
CN104202371A (en) * 2014-08-20 2014-12-10 浙江宇视科技有限公司 Cross-device dilation method and device based on iSCSI block direct storage
CN104898988A (en) * 2015-06-02 2015-09-09 浪潮电子信息产业股份有限公司 Method for acquiring total capacity of storage server hard disks
US10423882B2 (en) 2015-08-25 2019-09-24 Beijing Baidu Netcom Science And Technology Co., Ltd. Disk capacity predicting method, apparatus, equipment and non-volatile computer storage medium
CN105094708A (en) * 2015-08-25 2015-11-25 北京百度网讯科技有限公司 Method and apparatus for predicting disk capacity
CN105094708B (en) * 2015-08-25 2018-06-12 北京百度网讯科技有限公司 The Forecasting Methodology and device of a kind of disk size
CN108268363A (en) * 2016-12-31 2018-07-10 中国移动通信集团山西有限公司 For the method and apparatus of volume of business management
CN108268363B (en) * 2016-12-31 2021-04-06 中国移动通信集团山西有限公司 Method and apparatus for traffic capacity management
CN108845881A (en) * 2018-05-30 2018-11-20 有米科技股份有限公司 The method and device of server capacity dynamic adjustment
WO2020007336A1 (en) * 2018-07-06 2020-01-09 华为技术有限公司 Capacity expansion method and device
CN109189323A (en) * 2018-07-06 2019-01-11 华为技术有限公司 Expansion method and equipment
CN110753366A (en) * 2018-07-24 2020-02-04 中国移动通信集团浙江有限公司 Prediction processing method and device for industry short message gateway capacity
CN109901967A (en) * 2019-01-22 2019-06-18 无锡华云数据技术服务有限公司 Storage pool residual capacity pot life predictor method, electronic equipment, storage medium
CN109901967B (en) * 2019-01-22 2020-06-26 无锡华云数据技术服务有限公司 Storage pool residual capacity available time estimation method, electronic device and storage medium
CN110377228A (en) * 2019-06-19 2019-10-25 深圳壹账通智能科技有限公司 Automatic expansion method, device, O&M terminal and the storage medium of block chain node
CN110489062A (en) * 2019-08-27 2019-11-22 浪潮云信息技术有限公司 A kind of disk expansion method and system based on OpenStack environment
CN111625196A (en) * 2020-05-26 2020-09-04 北京海益同展信息科技有限公司 Block chain node capacity expansion method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN103970641A (en) Equipment expansion method based on capacity prediction technology
Jiang et al. Asap: A self-adaptive prediction system for instant cloud resource demand provisioning
CN107925612A (en) Network monitoring system, network monitoring method and program
US11307770B2 (en) Capacity forecasting based on capacity policies and transactions
CN103458052B (en) Resource scheduling method and device based on IaaS cloud platform
CN103152393B (en) A kind of charging method of cloud computing and charge system
US8407080B2 (en) Managing and monitoring continuous improvement in information technology services
CN108845878A (en) The big data processing method and processing device calculated based on serverless backup
Bautista et al. Collecting, monitoring, and analyzing facility and systems data at the national energy research scientific computing center
US20140143773A1 (en) Method and system for running a virtual appliance
US9929926B1 (en) Capacity management system and method for a computing resource
CN104301389A (en) Energy efficiency monitoring and managing method and system of cloud computing system
US20110093588A1 (en) Monitoring the performance of a Computer
US9127963B2 (en) Selection of bellwether smart grid meters
CN104301404A (en) Method and device for regulating resources of service system based on virtual machines
CN106068626A (en) Load balancing in distributed network management framework
US20220245485A1 (en) Multi-model block capacity forecasting for a distributed storage system
CN108809760A (en) The control method and device in sampling period in sampled-data system
US10310466B2 (en) Managing energy consumption of a building in an interconnected wide area management system
Radovanovic et al. Power modeling for effective datacenter planning and compute management
JP2015130019A (en) Maintenance work plan preparation system
CN108932241A (en) Daily record data statistical method, device and node
JP6252309B2 (en) Monitoring omission identification processing program, monitoring omission identification processing method, and monitoring omission identification processing device
CN103577600A (en) Method, device and system for adjusting target system performance
CN105491167A (en) Realizing method of sensing operation experience of browser terminal user in real time

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140806