CN104580482A - Data real-time transmission method based on electricity consumption information acquisition system front-end computer - Google Patents
Data real-time transmission method based on electricity consumption information acquisition system front-end computer Download PDFInfo
- Publication number
- CN104580482A CN104580482A CN201510024089.XA CN201510024089A CN104580482A CN 104580482 A CN104580482 A CN 104580482A CN 201510024089 A CN201510024089 A CN 201510024089A CN 104580482 A CN104580482 A CN 104580482A
- Authority
- CN
- China
- Prior art keywords
- data
- end processor
- platform
- monitoring
- code
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/18—File system types
- G06F16/182—Distributed file systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
- H04L67/1097—Protocols in which an application is distributed across nodes in the network for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Abstract
The invention belongs to the field of power grid operation monitoring and management systems. In order to enhance monitoring of massive detail data and make full use of a data center massive platform, the traditional mode that data enter a massive data platform through an electricity information acquisition system and a database is changed, the method that acquired original data are directly transmitted to the massive data platform through a system front-end computer is adopted, and accordingly timeliness of massive data monitoring is enhanced, and data processing and monitoring efficiency is improved.
Description
Technical field
The invention belongs to power grid operation management system for monitoring field, for strengthening the monitoring of magnanimity detailed data, give full play to data center's magnanimity platform action, change traditional approach in, data through power information acquisition system, abbreviation extraction system, the mode of data base access mass data platform, by with extraction system front end processor directly by the original data transmissions that gathers to the method for mass data platform, thus strengthen the promptness of mass data monitoring, improve data processing and monitoring efficiency.
Background technology
In recent years, company information construction and application deepen constantly, particularly along with intelligent substation, distribution automation, generalized information system, intelligent meter take into account the development construction of communication network technology, the information-based every aspect having incorporated enterprise production and operation management, accumulation is also producing a large amount of production and management functions detailed data.For strengthening information-based application of result further, since Eleventh Five-Year Plan, company information work is according to the principle of " unified leadership, unified planning, unified standard, organization of unity are implemented ", take SG-ERP as core, by effectively advancing integration across service management flow with collaborative, carry forward vigorously data center, mass data platform construction, achieve the comprehensive support of company information to service management.
According to corporate information management's unified plan, for the measuring apparatus detailed data that power information acquisition system gathers, seek unification data access mass data platform, then complete data storage, exchange, computing by mass data platform.Traditional approach, by with extraction system front end processor by after on-site data gathering, through with extraction system database to mass data transfers, transmission mode, transmission time and efficiency are all affected.
For strengthening the promptness of mass data monitoring, improve data processing and monitoring efficiency, the present invention mainly achieves the reach of mass data platform data access way, accesses from changing into the access of extraction system database directly to extraction system front end processor.Being send instructions under main website end is to collection in worksite terminal with extraction system, receive image data, forward the front-end equipment of image data with extraction system front end processor, is the equipment that realization is connected with acquisition terminal with extraction system.Front end processor to patrol survey every day, mend to recruit etc. and take turns timed task more, while can real-time implementation parameter issue, change, the task of manual filling mining.By existing transmission mode, the passage that front end processor connects, accesses the designated lanes such as movement, UNICOM on the one hand, and carrying collection in worksite information, on the one hand to the data gathered by extraction system database transmissions.In the present invention, a circuit-switched data will be set up again and spread out of passage, and realize front end processor Information Monitoring one and receive two, and namely send with while adopting database, send to mass data platform.
Summary of the invention
The object of the invention is to the above-mentioned deficiency overcoming prior art, a kind of real-time data transmission method based on power information acquisition system front end processor is provided.The present invention adopts following technical scheme:
A kind of described real-time data transmission method based on power information acquisition system front end processor, it is characterized in that, mainly comprise from front end processor to the transmission data of mass data platform in the method: be a time point with one day every 15 minutes, whole day is the voltage of totally 96 time points, electric current, power, only code, every day, electric energy meter freezed only code, region code, address code, measurement point information that collection in worksite terminal is corresponding; In front end processor, determine unique stoichiometric point by region code, address code, measurement point information, be associated with the voltage of 96 time points, electric current, power, only code, every day, electric energy meter freezed only code; Electricity consumption acquisition system front end processor is " one two receipts " mode of operation, namely front end processor pushes identical original timescale data to mass data platform write electricity consumption acquisition system database after transmission Data Analysis while, can ensure that data are timely, complete, strengthen the promptness of mass data monitoring, improve data processing and monitoring efficiency; In conjunction with using extraction system file data, by the electric energy meter of user and correspondence thereof, realizing associating of electric energy meter and measurement point, finally realizing user and associate with Information Monitoring.
A kind of described real-time data transmission method based on power information acquisition system front end processor, it is characterized in that, in the method, front end processor carries out Data View according to the uniform data of mass data platform access specification and collects, and calls the application program access interface of standard to mass data platform propelling data; Real-time monitoring data gets involved whole transmitting procedure, provides response, Restoration Mechanism for data access abnormal conditions; The data being transferred to magnanimity platform through data adaptation, cleaning, will form standard storage format; The quality of data verification rule that last basis is preset, carries out examination to mistakes and omissions data, again communicates after gathering problem data with front end processor, initiate benefit and pass, retransmit flow process.
A kind of described real-time data transmission method based on power information acquisition system front end processor, it is characterized in that, in described method, data are entered the conversion of mass data platform identification, this mass data platform is set up based on distributed file system, data store with measuring point, electric energy table number for mark, storage of collected information; Magnanimity platform is entered in order to realize front end processor image data, mark conversion need be carried out in data transmission procedure, existing measurement point and electric energy table number corresponding relation in support extraction system, by data structure in front end processor by " region code+address code+measurement point+Information Monitoring ", the form being converted into " electric energy table number+Information Monitoring " stores.
Patent of the present invention has following beneficial effect:
The present invention is transmitted directly to magnanimity platform by with extraction system front end processor, effectively ensure that and enter mass data platform in time by the raw data of extraction system collection, data acquisition and conversion are efficiently, effectively improve the promptness of data monitoring, the transmission lag time will be greatly reduced, provide powerful support for for follow-up relevant monitoring service application mass data platform provides.
Accompanying drawing explanation
Fig. 1: based on the data transmission schematic diagram of the real-time data transmission method of power information acquisition system front end processor;
Fig. 2: real-time data transmission and storage format flow path switch figure;
Embodiment
Below in conjunction with drawings and Examples, the embodiment of patent of the present invention is described in further detail.Following examples for illustration of patent of the present invention, but are not used for limiting the scope of patent of the present invention.
As shown in Figure 1, real-time data transmission and storage format flow path switch are as shown in Figure 2 for the data transmission schematic diagram of a kind of real-time data transmission method based on power information acquisition system front end processor provided by the present invention.
In power information acquisition system database, data gather in such a way, for same measurement point, by phase sequence record every 15 minutes voltage, electric current, power, only code value.Following table is 96 point voltage data example, and unit is volt.
Table 1 extraction system database measurement point A, B, C phase sequence 96 point voltage value
And in front end processor, table 1 actual storage is following form.
Table 2 front end processor data memory format
Data Date | Time | Region code | Address code | Measurement point | Voltage | Electric current | Only code |
2015/1/14 | 0:00 | 4211 | 4FDA | 1 | 220 | 0.14 | 4513 |
2015/1/14 | 0:15 | 4211 | 4FDA | 1 | 212 | 0.13 | 4514 |
2015/1/14 | 0:30 | 4211 | 4FDA | 1 | 225 | 0.16 | 4516 |
2015/1/14 | 0:45 | 4211 | 4FDA | 1 | 228 | 0.12 | 4518 |
2015/1/14 | 0:00 | 4211 | 8FE1 | 2 | 223 | 0.15 | 2134 |
2015/1/14 | 0:15 | 4211 | 8FE1 | 2 | 223 | 0.11 | 2134 |
2015/1/14 | 0:30 | 4211 | 8FE1 | 2 | 223 | 0.2 | 2136 |
2015/1/14 | 0:45 | 4211 | 8FE1 | 2 | 223 | 0.19 | 2137 |
After indicating conversion, obtain in mass data platform, data store by following form, as shown in table 3.
Table 3 mass data platform data storage format
Difficult point of the present invention is: in data by front end processor in mass data transfers process, mark conversion must be carried out, will be by: region code+address code+measurement period, by with extraction system Archives incidence relation, by measurement period and electric energy meter factory number, show to count No. ID and be associated.Because within every 15 minutes, gathering the one group of data (voltage, electric current, only code, power) once specially becoming user, Gong Biantai district electric energy meter with extraction system front end processor, consider that the whole province specially becomes user, Gong Biantai district 300,000 total amount, the data amount check produced for every 15 minutes is 1,200,000, every 15 points of clockwise mass data platforms transmission, data volume is large, requires high to work efficiency.
The odds of the present invention and classic method is comparatively:
In front end processor one two receipts, accelerate magnanimity detailed data greatly and enter magnanimity plateau time.Because of in traditional approach, adopt oracle database with extraction system, copy to interface library by Oracle Golden Gate software, life period is poor, and the time is longer, then enters mass data platform, and data promptness is not high.And original mass data, enter with after extraction system database, business department can process data, may affect the authenticity of data.
In the present invention, mass data platform is directly transferred data to from front end processor, accelerate data transmission efficiency, avoid magnanimity raw data through with after extraction system database processing, the situation that raw data may be modified, directly obtain most raw data, carry out practical monitoring, improve authenticity and the reliability of monitoring.
Claims (3)
1. the real-time data transmission method based on power information acquisition system front end processor, it is characterized in that, mainly comprise from front end processor to the transmission data of mass data platform in the method: be a time point with one day every 15 minutes, whole day is the voltage of totally 96 time points, electric current, power, only code, every day, electric energy meter freezed only code, region code, address code, measurement point information that collection in worksite terminal is corresponding; In front end processor, determine unique stoichiometric point by region code, address code, measurement point information, be associated with the voltage of 96 time points, electric current, power, only code, every day, electric energy meter freezed only code; Electricity consumption acquisition system front end processor is " one two receipts " mode of operation, namely front end processor pushes identical original timescale data to mass data platform write electricity consumption acquisition system database after transmission Data Analysis while, can ensure that data are timely, complete, strengthen the promptness of mass data monitoring, improve data processing and monitoring efficiency; In conjunction with using extraction system file data, by the electric energy meter of user and correspondence thereof, realizing associating of electric energy meter and measurement point, finally realizing user and associate with Information Monitoring.
2. a kind of real-time data transmission method based on power information acquisition system front end processor according to claim 1, it is characterized in that, in the method, front end processor carries out Data View according to the uniform data of mass data platform access specification and collects, and calls the application program access interface of standard to mass data platform propelling data; Real-time monitoring data gets involved whole transmitting procedure, provides response, Restoration Mechanism for data access abnormal conditions; The data being transferred to magnanimity platform through data adaptation, cleaning, will form standard storage format; The quality of data verification rule that last basis is preset, carries out examination to mistakes and omissions data, again communicates after gathering problem data with front end processor, initiate benefit and pass, retransmit flow process.
3. a kind of real-time data transmission method based on power information acquisition system front end processor according to claim 1, it is characterized in that, in the method, data are entered the conversion of mass data platform identification, this mass data platform is set up based on distributed file system, data store with measuring point, electric energy table number for mark, storage of collected information; Magnanimity platform is entered in order to realize front end processor image data, mark conversion need be carried out in data transmission procedure, existing measurement point and electric energy table number corresponding relation in support extraction system, by data structure in front end processor by " region code+address code+measurement point+Information Monitoring ", the form being converted into " electric energy table number+Information Monitoring " stores.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510024089.XA CN104580482A (en) | 2015-01-16 | 2015-01-16 | Data real-time transmission method based on electricity consumption information acquisition system front-end computer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510024089.XA CN104580482A (en) | 2015-01-16 | 2015-01-16 | Data real-time transmission method based on electricity consumption information acquisition system front-end computer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104580482A true CN104580482A (en) | 2015-04-29 |
Family
ID=53095639
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510024089.XA Pending CN104580482A (en) | 2015-01-16 | 2015-01-16 | Data real-time transmission method based on electricity consumption information acquisition system front-end computer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104580482A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071994A (en) * | 2015-08-27 | 2015-11-18 | 许继集团有限公司 | Mass data monitoring system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216984A (en) * | 2008-01-02 | 2008-07-09 | 江苏省电力公司 | An electricity energy information acquisition integrated platform |
US20100117856A1 (en) * | 2008-11-11 | 2010-05-13 | Itron, Inc. | System and method of high volume import, validation and estimation of meter data |
CN101834902A (en) * | 2010-04-30 | 2010-09-15 | 广州合立正通信息网络集成有限公司 | Front-end processor system and method for comprehensive management of remote power distribution room |
-
2015
- 2015-01-16 CN CN201510024089.XA patent/CN104580482A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216984A (en) * | 2008-01-02 | 2008-07-09 | 江苏省电力公司 | An electricity energy information acquisition integrated platform |
US20100117856A1 (en) * | 2008-11-11 | 2010-05-13 | Itron, Inc. | System and method of high volume import, validation and estimation of meter data |
CN101834902A (en) * | 2010-04-30 | 2010-09-15 | 广州合立正通信息网络集成有限公司 | Front-end processor system and method for comprehensive management of remote power distribution room |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071994A (en) * | 2015-08-27 | 2015-11-18 | 许继集团有限公司 | Mass data monitoring system |
CN105071994B (en) * | 2015-08-27 | 2018-08-03 | 许继集团有限公司 | A kind of mass data monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107402976B (en) | Power grid multi-source data fusion method and system based on multi-element heterogeneous model | |
CN105574652B (en) | Intelligent power distribution network planning big data management and control system and method | |
CN201757929U (en) | Fully wireless networked power consumer power consumption information acquisition system | |
CN104317800A (en) | Hybrid storage system and method for mass intelligent power utilization data | |
CN105447247A (en) | Method and system for checking regulation and control information | |
CN107730394A (en) | The polynary isomeric data fusion method of panorama power network based on big data | |
CN102955977A (en) | Energy efficiency service method and energy efficiency service platform adopting same on basis of cloud technology | |
CN108446396B (en) | Power data processing method based on improved CIM model | |
CN111600296A (en) | Power load prediction system based on edge calculation and prediction method thereof | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
CN104574207A (en) | Regional power grid electric quantity analyzing and counting system | |
CN112286962A (en) | Electricity consumption information acquisition terminal meter reading success rate statistical method and system | |
CN111737325A (en) | Power data analysis method and device based on big data technology | |
CN103606032A (en) | Two-dimensional grid GIS data concentration method | |
CN110826731A (en) | Digital management method and management system for electrical equipment of thermal power plant | |
CN110555583A (en) | method for uniformly processing wide-area operation data of intelligent power grid dispatching control system | |
CN103699688A (en) | Terminal model for supporting management of reliability in power supply of terminal user | |
CN117009610A (en) | K line graph visualization system and method based on power data | |
CN104580482A (en) | Data real-time transmission method based on electricity consumption information acquisition system front-end computer | |
CN203811206U (en) | Enterprise carbon discharge metering and analysis device | |
CN103473654A (en) | Asset data cleaning auxiliary method and system for electric ERP system | |
CN102929266A (en) | Energy-saving technology modification and water-saving project information management system for enterprises | |
CN110674235A (en) | Marketing and distribution topology file synchronous management system and method | |
CN202939473U (en) | Energy-saving technology modification and water-saving project information management system for enterprise | |
CN104765348A (en) | Energy amount measuring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |