Prior art keywords
electrical power
power network
performance
historical
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US11/712,814
Other versions
US7787995B2 (en
Inventor
Dingguo Chen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens Power Transmission and Distribution Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Power Transmission and Distribution Inc filed Critical Siemens Power Transmission and Distribution Inc
Priority to US11/712,814 priority Critical patent/US7787995B2/en
Assigned to SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC. reassignment SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CHEN, DINGGUO
Priority to PCT/US2007/005930 priority patent/WO2007103500A2/en
Publication of US20070211887A1 publication Critical patent/US20070211887A1/en
Assigned to SIEMENS POWER GENERATION, INC. reassignment SIEMENS POWER GENERATION, INC. MERGER (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
Assigned to SIEMENS ENERGY, INC. reassignment SIEMENS ENERGY, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS POWER GENERATION, INC.
Application granted granted Critical
Publication of US7787995B2 publication Critical patent/US7787995B2/en
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS ENERGY, INC.
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a method and system for controlling an operation of an electrical power network, and, in particular, to a method and system for monitoring a performance of the network, for calculating a network performance target value based on historical performance data, and for controlling the production of power in the network responsive to the target.
  • ISOs Independent system operators of electrical power networks are required to monitor and operate within certain power generation performance standards. These performance standards determine the amount of imbalance that is permissible for reliability on power networks.
  • ISOs operate by reacting to power trends as well as scheduled power interchange.
  • operators provide regulatory agencies with schedule information detailing the quantity of energy and the time that energy will be produced. These schedules of energy vary over the course of a year, month, week, day, hour and other intervals of time such as seasons and special days such as holidays and weekends.
  • schedules of energy vary over the course of a year, month, week, day, hour and other intervals of time such as seasons and special days such as holidays and weekends.
  • operators are often tasked with the burden of meeting demand for real-time and unanticipated shortage in energy. Meeting these unanticipated demands is often the cause of increased energy costs.
  • FIG. 1 illustrates a ten minute window of example ACE variances about a CPS1 control threshold
  • FIG. 2 illustrates a ten minute window of example ACE variances about a CPS2 control threshold L 10 ;
  • FIG. 3 shows a flow chart of an example method for controlling an electrical power network
  • FIG. 4 shows a block diagram of an example system for controlling electrical power network.
  • ACE Absolute Control Error
  • I refers to the algebraic sum of all power (MW) flows on tie-lines between a control area and its surrounding control areas
  • F is the interconnection frequency (Hz)
  • A is actual
  • S is scheduled
  • B is the control area's frequency bias (MW/0.1 Hz).
  • Frequency bias is the amount of generation needed to respond to a 0.1 Hz change in interconnection frequency. It is normally set to the supply-plus-load response of a control area to a change in interconnection frequency.
  • the first terms shows how well the control area performs in matching its schedules with other control areas.
  • the second term is the individual control area's contribution to the interconnection to maintain frequency at its scheduled value.
  • ACE i is the instantaneous difference between actual and scheduled interchange, taking into account the effects of frequency. It measures how well a control area manages its generation to match time-varying loads and scheduled interchange.
  • CPS1 is a yearly measure of one-minute averages and is shown below:
  • ACE i is the clock-minute average of ACE (tie-line bias ACE)
  • B i is the frequency bias of the control area
  • ⁇ i is the interconnections' targeted frequency bound
  • ⁇ F i is the clock-minute average frequency error.
  • CPS1 measures the relationship between ACE and interconnection frequency on a 1-minute average basis. If the above equation is evaluated for the various instantaneous inputs into ACE i , the resultant should be greater than or equal to 100% or a compliance factor of 1. Throughout the year, system operators attempt to monitor and control power generation to meet the CPS1 objective.
  • An evaluation of the current 1-minute ACE i average is made, and then at each AGC cycle, an instantaneous NERC CPS1 percentage or compliance factor is calculated. Depending on the resultant values as well as other input data, regulating controls signals are generated. The calculated CPS1 compliance factor is compared to the CPS1 target value set by the system operator. Whenever, the CPS1 falls below 1, a correction signal is generated.
  • the system operator may set the CPS1 target value higher or lower depending on the operators prior 12 month performance. For example, as shown in FIG. 1 , a control threshold is set for 100% and whenever, the instantaneously calculated CPS1 percentage falls below the 100% threshold, a correction signal is generated. Alternatively, a trend within that 10-minute window or any other period may be used as a basis for determining a control action that may be required.
  • CPS2 performance standard requires that the average ACE for each of the six ten-minute periods during an hour must be within specific limits referred to as L 10 .
  • the standard requires a 90% compliance of the 10 minute ACE averages over a month or on average, no more than 14.4 violations over a 24 hour period.
  • CPS2 compliance requires that the ACE ten minute average be less than or equal to the L 10 average as shown below.
  • NERC requires 90% compliance of 10-minute ACE averages over 1 month.
  • the CPS2 standard can be defined as:
  • ACE i is the clock-minute average of ACE (i.e., tie-line bias ACE) and L 10 is defined as:
  • L 10 L pr ⁇ 10 ⁇ square root over (( ⁇ 10 B i )( ⁇ 10 B s )) ⁇ square root over (( ⁇ 10 B i )( ⁇ 10 B s )) ⁇ (5)
  • ⁇ 10 is a constant derived from the targeted frequency bound
  • L pr is a constant equal to 1.65 used to convert the frequency target to 90% probability
  • B i is the frequency bias of the control area
  • B s is the sum of frequency bias settings of the control areas in the respective interconnection.
  • CPS2 is a monthly standard that limits unscheduled power flow. It is also a numeric measure of ACE (in MW) over all 10 minute periods within a month. Under CPS2, ACE is limited to within a band bounded by L 10 limits. For the most part, industry compliance of the CPS2 standard is accomplished through trend analysis or time weighted factors. Rising and waning 10 minute ACE averages are tracked and responded to by the noting the direction and slope of the collected 10 minute average data points. Action may be taken within a predefined threshold value reached prior to crossing the L 10 limits or may be set to trigger upon a detected violation of the L 10 thresholds.
  • control threshold values are set by system operators and determined by historical field data, power generation algorithms and variations of the L 10 equation 5. (i.e. 90% of L 10 boundaries)
  • a snapshot of a 10 minute window reveals the occurrence of a CPS2 threshold violation (not an L 10 violation) at the fifth minute of the 10 minute interval.
  • a system operator may take corrective action to change the ACE value away from the threshold values and L 10 limits. Whether performance is guided by L 10 limits or threshold values, is a matter of choice.
  • the present invention may be applied to any operating band as set for by the system operator.
  • a method includes calculating the CPS1 performance over moving 12-month time period and the CPS2 performance over the present month and then adjusting the control effort based on up-to-date CPS1/CPS2 performance numbers at a certain time, and how much time is remaining in the 12-month time period and the current month.
  • CPS1 compliance
  • CPS2 methodology described in commonly assigned, pending U.S. patent application Ser. No. 11/157,056 may be used in conjunction with the present invention to manage power flow in a power network.
  • a method for controlling an operation of an electrical power network may include configuring an allowable performance of an electrical power network over a predetermined time period as a probability expression comprising a historical term and a future term having an electrical power network operating condition variable. The method may then include calculating a network performance target value according to the probability expression by using a historical electrical power network operating condition value for the electrical power network operating condition variable. The method may further include using the performance target value for controlling the electrical power network effective to achieve the allowable performance.
  • a corrective action for satisfying the CPS1 requirement may be determined by comparing a calculated one minute ACE target value with a calculated running one minute average ACE. When an absolute value of the running one minute average ACE is less than the corresponding one minute ACE target, no corrective action is generally required. Conversely, when the absolute value of the running one minute average ACE is greater than the corresponding one minute ACE target, corrective action may be necessary.
  • the CPS1 term may be expressed as a probability corresponding to a number of past clock periods during a 12 month time period and a number of future clock periods in the 12 month time period.
  • the term n T may be used to designate the number of total clock-minute time intervals within a time period T.
  • the term n t may be used to denote a number of clock-minute time intervals until a present time within a desired 12-month time period T, i.e. past clock periods.
  • the term n T-t may be used to denote the number of remaining clock-minute time intervals until the end of period T, i.e., future clock periods.
  • term X may be used to represent:
  • the CPS1 standard may be equivalently expressed in probabilistic terms as an expected value:
  • Equation (7) then becomes:
  • X _ n t n t + n T - t ⁇ X _ 1 + n T - t n t + n T - t ⁇ X _ 2 ⁇ ⁇ 1 2 ( 8 )
  • Equation (9) the average of X during the n t clock-minute time period X 1 may be computed with historical data using Equation (9):
  • X _ 1 AVG n t ⁇ Clock - MinuteTimeIntervals [ ( ACE i - 10 ⁇ ⁇ B i ) i ⁇ ⁇ ⁇ ⁇ F i ] ( 9 )
  • Equation (8) may be expressed in terms of the average of X during the remaining n T-t clock-minute time period, X 2 as:
  • This statistical target can be lower or higher depending on the CPS1 performance up until a current point in time. Consequently, a prediction of a future target may be based on past CPS1 performance.
  • Equation (11) If Equation (11) is satisfied for every clock-minute for the remaining n T-t clock-minute time horizon, then a desired performance of X 2 ⁇ [( n t +n T-t ) ⁇ 1 2 ⁇ n t X 1 ]/n T-t may be achieved.
  • a just prior clock-minute average frequency error ⁇ F i can be used as a current clock-minute average frequency error to calculate a current clock-minute ACE target, which in turns allows determination of an eventual CPS1 based control amount.
  • equation (11) may be rearranged as:
  • equation (11) may be rearranged as:
  • the clock-minute ACE target ACE t may be calculated, for example, using a just prior clock-minute average frequency error or a largest clock-minute average frequency error, as:
  • This clock-minute ACE target (ACE t ) may be calculated on a minute-by-minute (minutely) basis.
  • the CPS1 control scheme requires that CPS based AGC must take appropriate control actions such that the algebraic value of the current average 1-minute average ACE is below the calculated CPS1 1-minute average ACE target (ACE t ), as shown in Equation (14).
  • the amount of power produced as a corrective action to comply with the CPS1 standard is based on the calculated ACE target and a sum of the deviations between the calculated ACE target and the instantaneous ACE values from the beginning of a particular period, such as the 12 month monitoring period. As shown in the flow chart of FIG. 3 , the amount of power to be generated to achieve CPS1 compliance requires the calculation of the ACE target (ACE t ) as provided for in equation 14.
  • these ACE t values may be calculated at any period of time or interval, but may typically be calculated at the end of each monitoring interval, although calculations may be done more often during each AGC monitoring cycle.
  • the AGC monitoring cycle for a power network is the time during which performance is monitored and control signals are generated.
  • the ACE target is calculated at an AGC monitoring cycle of 4 seconds, although 1 minute monitoring cycles, or any other interval may be used.
  • the ACE target values may be calculated for current, past or future (expected/predicted) time intervals and are used as reference points and performance guides.
  • the ACE target (ACE t ) for the current 1 minute time interval is calculated, for example, according to equation (14).
  • the instantaneous ACE value (ACE t ) for the current monitoring time interval is then calculated in step 302 .
  • a -difference or deviation from the corresponding ACE target (ACE t ) is determined and may be stored in a memory of a monitoring and control system.
  • the deviations from the ACE target values may be -algebraically calculated as:
  • a corresponding deviation is calculated and summed with previous calculated deviations.
  • the deviations may be summed from a first monitoring time interval to a just prior monitoring interval within a monitoring period or selected time interval of interest (although any combination or subset of the stored deviation values may be used).
  • the deviations, ⁇ ACE i may be summed from a beginning of a current 1 minute interval to previous AGC control cycle 306 .
  • the resulting summed deviations may be denoted as ⁇ ACE i .
  • the total number of monitoring time intervals from the beginning interval to the just previous interval is denoted and stored. For example, the number of AGC control cycles, #Cycles, from the beginning of the current 1 minute time interval to the previous AGC control cycle is recorded in step 308 .
  • a running 1 minute ACE average, ACE avg1 for the time period up to the current monitoring time interval may be calculated as follows:
  • ACE avg1 ( ⁇ ACE i /#Cycles)+ ACE t (16)
  • a first determination is made whether ⁇ F i is less than 0 and ACE avg1 is greater than ACE t . If true, no correction is needed 318 . Otherwise, a second determination 316 may be made whether ⁇ F i is greater than 0 and ACE avg1 is less than ACE t . If true, no correction is needed 318 . Otherwise, a CPS1 correction may be required 316 .
  • the correction amount may be calculated from the following equation:
  • This correction may be clamped to the system-allowed single cycle maximum correction in quantity without considering the sign.
  • the first term in the expression of Correction is simply an integral action which may be taken in negative feedback to reduce the integrated deviation of the instantaneous ACE from its 1-minute average ACE.
  • CPS1 and CPS2 require simultaneous compliance
  • the higher priority compliance standard shall prevail.
  • CPS2 control standard has higher priority than CPS1
  • CPS1 correction and CPS1 correction are in the same direction, the larger correction amount will be used for AGC control; if CPS1 correction and CPS2 correction are in opposite directions, only CPS2 correction will be used for AGC control, and CPS1 correction is ignored; if CPS1 correction is zero and CPS2 is non-zero, CPS2 correction will be used for AGC control; if CPS2 correction is zero and CPS1 is non-zero, CPS1 correction will be used for AGC control; if both CPS1 correction and CPS2 correction are zero's, no CPS correction will be included in AGC control.
  • FIG. 4 shows a block diagram of an example system 400 for controlling an electrical power network 420 that may include an electrical power distribution grid 419 and one or more generators 416 .
  • the monitoring and control system 400 as shown may include a database 406 , such as an AGC database, for storing electrical power network performance data and one or more processor(s) 404 coupled to the database 406 for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable.
  • the system 400 may also include a monitoring and control module 410 coupled to the processor 404 for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance.
  • the monitoring and control system 400 depicted in FIG. 4 may be used for NERC CPS1 Compliance wherein one or more processors 404 for the execution of monitoring and control software and operating system software.
  • Processor 404 may take any form known in the art, for example, an analog or digital microprocessor or computer, and it may be integrated into or combined with one or more processors used for other functions related to power flow monitoring of the network 420 .
  • the processor 404 , its operating system, and related applications (e.g. executable code) may be executed in a real-time or nearly real-time basis.
  • Memory 408 may include one or more ROMs, PROMs, EROMs, EPROMs, RAMs, SRAMS, DRAMs, FPM DRAMS, EDO DRAMs, SDRAMs, DDR SDRAM, RDRAM, MEMORY STICKS, FLASH MEMORY, VIRTUAL MEMORY and/or electronic circuitry cable of storing program instructions and/or configuration data.
  • Memory 408 may be connected to processor(s) 404 and to database 406 stored on storable medium such as a hard drive, CD or diskette or any other non-volatile means of storage.
  • Database 406 such as AGC database, may be connected to and accessible by the one or more processors 404 and stores monitoring and control data and applications related to the monitoring and controlling a power network. From external field data 412 and field device(s) 418 , such as a SCADA network, monitoring data is feed to a monitoring and control module 410 comprising a CPS Performance module 422 , a CPS1 Control Module 424 , and a Control Decision Module 422 .
  • a module is a computer program functioning as either stand-alone software or software that is part of another application dedicated to the performance of a particular function.
  • the processor(s) 404 forwards to CPS Performance Monitoring Module 422 , field data such as net interchange and actual frequency data necessary for the calculation of an instantaneous ACE value.
  • the calculated instantaneous ACE value and related field data are sent to the CPS1 Performance Control Module 424 wherein ACE target values, deviations from target values, summed deviations, the sum of monitoring intervals, 1 minute average ACE values and control threshold values are calculated and stored in memory 408 .
  • Field and calculated data are then sent to the Control Decision Module 422 , where a determination is made of the corrective action to be taken. If there is a need for corrective action, the Control Decision Module 422 generates a network control signal 426 for the Generation Allocation module 424 .
  • the Generation Allocation module 424 will determine or assign power network equipment or components necessary to take corrective action. If for example, additional power is necessary to maintain CPS1 compliance, processor(s) 404 sends a generation command via the network 414 to Generator 416 .
  • the exemplary methods described for controlling an operation of an electrical power network may be implemented using computer programming or engineering techniques including computer software, firmware, hardware or any combination or subset thereof.
  • Any such resulting program, having computer-readable code means may be embodied or provided within one or more computer-readable media, thereby making a computer program product, i.e., an article of manufacture, according to the invention.
  • the computer readable media may be, for instance, a fixed (hard) drive, diskette, optical disk, magnetic tape, semiconductor memory such as read-only memory (ROM), etc., or any transmitting/receiving medium such as the Internet or other communication network or link.
  • the article of manufacture containing the computer code may be made and/or used by executing the code directly from one medium, by copying the code from one medium to another medium, or by transmitting the code over a network.
  • the computer readable media may include computer-readable code for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable.
  • the computer readable media may also include computer-readable code for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance.
  • the computer readable media may be used for upgrading an existing AGC and/or CPS control system for an electrical power network.
  • An apparatus for making, using or selling the invention may be one or more processing systems including, but not limited to, a central processing unit (CPU), memory, storage devices, communication links and devices, servers, I/O devices, or any sub-components of one or more processing systems, including software, firmware, hardware or any combination or subset thereof, which embody the invention.
  • CPU central processing unit
  • memory storage devices
  • communication links and devices servers
  • I/O devices I/O devices

Abstract

A system (400) and method for controlling an operation of an electrical power network (420) is described. The method includes configuring an allowable performance of an electrical power network over a predetermined time period as a probability expression comprising a historical term and a future term having an electrical power network operating condition variable. The method also includes calculating a network performance target value (300) according to the probability expression by using a historical electrical power network operating condition value for the electrical power network operating condition variable. The method further includes using the performance target value for controlling the electrical power network effective to achieve the allowable performance. The system includes a database (406), a processor (404) coupled to the database, and a monitoring and control module (410) coupled to the processor.

Description

  • This application claims the benefit of U.S. Provisional Patent Application No. 60/779,845, filed Mar. 7, 2006, which is incorporated herein by reference.
  • FIELD OF THE INVENTION
  • The present invention relates to a method and system for controlling an operation of an electrical power network, and, in particular, to a method and system for monitoring a performance of the network, for calculating a network performance target value based on historical performance data, and for controlling the production of power in the network responsive to the target.
  • BACKGROUND OF THE INVENTION
  • Independent system operators (ISOs) of electrical power networks are required to monitor and operate within certain power generation performance standards. These performance standards determine the amount of imbalance that is permissible for reliability on power networks. Currently, ISOs operate by reacting to power trends as well as scheduled power interchange. Typically, operators provide regulatory agencies with schedule information detailing the quantity of energy and the time that energy will be produced. These schedules of energy vary over the course of a year, month, week, day, hour and other intervals of time such as seasons and special days such as holidays and weekends. Despite knowing that such energy requirements vary considerably at times, operators are often tasked with the burden of meeting demand for real-time and unanticipated shortage in energy. Meeting these unanticipated demands is often the cause of increased energy costs. Under certain circumstances, energy costs may decrease when an oversupply of energy exists in the marketplace. As readily apparent, there is a significant need for a method and system which allows for compliance with the control performance standards set by regulatory authorities such as NERC (North American Electric Reliability Council).
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention is explained in the following description in view of the drawings that show:
  • FIG. 1 illustrates a ten minute window of example ACE variances about a CPS1 control threshold;
  • FIG. 2 illustrates a ten minute window of example ACE variances about a CPS2 control threshold L10;
  • FIG. 3 shows a flow chart of an example method for controlling an electrical power network; and
  • FIG. 4 shows a block diagram of an example system for controlling electrical power network.
  • DETAILED DESCRIPTION OF THE INVENTION
  • System operators have found it a challenge to readily match changes in load requirements with power generation for their control areas. Nevertheless automatic generation control systems have attempted to control this mismatch between sources of power and uses of power, by balancing real-power and by stabilizing frequency. As a guide to power and load management, NERC has provided control performance standards aimed at minimizing any adverse effects on neighboring control areas. To be in compliance with these NERC requirements, a system operator must balance its generation and interchange schedules with its load.
  • As a measure of conformity to the control performance standards, a first compliance factor know as ACE (Area Control Error) is applied to the power network's operations. For purposes of illustration, the ACE equation is shown below in a slightly simplified form:

  • ACE i=(I A −I S)−10B(F A −F S)   (1)
  • where I refers to the algebraic sum of all power (MW) flows on tie-lines between a control area and its surrounding control areas, F is the interconnection frequency (Hz), A is actual, S is scheduled, and B is the control area's frequency bias (MW/0.1 Hz). Frequency bias is the amount of generation needed to respond to a 0.1 Hz change in interconnection frequency. It is normally set to the supply-plus-load response of a control area to a change in interconnection frequency. The first terms shows how well the control area performs in matching its schedules with other control areas. The second term is the individual control area's contribution to the interconnection to maintain frequency at its scheduled value. Accordingly, ACEi is the instantaneous difference between actual and scheduled interchange, taking into account the effects of frequency. It measures how well a control area manages its generation to match time-varying loads and scheduled interchange.
  • NERC has also defined several other minimum Control Performance Standards (CPS), namely CPS1, and CPS2. CPS1 is a yearly measure of one-minute averages and is shown below:
  • AVG 12 - month [ ( ACE i - 10 B i ) i Δ F i ] ɛ 1 2 or equivalently , ( 2 ) CPS 1 = ( 2 - AVG 12 - month [ ( ACE i - 10 B i ) i Δ F i ] / ɛ 1 2 ) × 100 % 100 % ( 3 )
  • where AVG12-month is the 12 month average, ACEi is the clock-minute average of ACE (tie-line bias ACE), Bi is the frequency bias of the control area, εi is the interconnections' targeted frequency bound; and ΔFi is the clock-minute average frequency error. In short, CPS1 measures the relationship between ACE and interconnection frequency on a 1-minute average basis. If the above equation is evaluated for the various instantaneous inputs into ACEi, the resultant should be greater than or equal to 100% or a compliance factor of 1. Throughout the year, system operators attempt to monitor and control power generation to meet the CPS1 objective.
  • An evaluation of the current 1-minute ACEi average is made, and then at each AGC cycle, an instantaneous NERC CPS1 percentage or compliance factor is calculated. Depending on the resultant values as well as other input data, regulating controls signals are generated. The calculated CPS1 compliance factor is compared to the CPS1 target value set by the system operator. Whenever, the CPS1 falls below 1, a correction signal is generated.
  • Although the CPS1 target value is normally set to 1 (100%), the system operator may set the CPS1 target value higher or lower depending on the operators prior 12 month performance. For example, as shown in FIG. 1, a control threshold is set for 100% and whenever, the instantaneously calculated CPS1 percentage falls below the 100% threshold, a correction signal is generated. Alternatively, a trend within that 10-minute window or any other period may be used as a basis for determining a control action that may be required.
  • As a secondary NERC requirement, CPS2 performance standard requires that the average ACE for each of the six ten-minute periods during an hour must be within specific limits referred to as L10. Under CPS2, the standard requires a 90% compliance of the 10 minute ACE averages over a month or on average, no more than 14.4 violations over a 24 hour period. Moreover, CPS2 compliance requires that the ACE ten minute average be less than or equal to the L10 average as shown below. NERC requires 90% compliance of 10-minute ACE averages over 1 month. The CPS2 standard can be defined as:

  • Avg10-minute [ACE i] ≦L 10   (4)
  • where ACEi is the clock-minute average of ACE (i.e., tie-line bias ACE) and L10 is defined as:

  • L 10 =L pr·ε10·√{square root over ((−10B i)(−10B s))}{square root over ((−10B i)(−10B s))}  (5)
  • where ε10 is a constant derived from the targeted frequency bound, Lpr is a constant equal to 1.65 used to convert the frequency target to 90% probability, Bi is the frequency bias of the control area, and Bs is the sum of frequency bias settings of the control areas in the respective interconnection.
  • CPS2 is a monthly standard that limits unscheduled power flow. It is also a numeric measure of ACE (in MW) over all 10 minute periods within a month. Under CPS2, ACE is limited to within a band bounded by L10 limits. For the most part, industry compliance of the CPS2 standard is accomplished through trend analysis or time weighted factors. Rising and waning 10 minute ACE averages are tracked and responded to by the noting the direction and slope of the collected 10 minute average data points. Action may be taken within a predefined threshold value reached prior to crossing the L10 limits or may be set to trigger upon a detected violation of the L10 thresholds. Although L10 establishes CPS2 performance limits, system operators may operate within a narrower standard of performance, namely, control threshold values, so as to avoid CPS2 violations rather than reacting to L10 violations. The control threshold values are set by system operators and determined by historical field data, power generation algorithms and variations of the L10 equation 5. (i.e. 90% of L10 boundaries)
  • For example, and as shown in FIG. 2, a snapshot of a 10 minute window reveals the occurrence of a CPS2 threshold violation (not an L10 violation) at the fifth minute of the 10 minute interval. Under these circumstances, a system operator may take corrective action to change the ACE value away from the threshold values and L10 limits. Whether performance is guided by L10 limits or threshold values, is a matter of choice. The present invention may be applied to any operating band as set for by the system operator.
  • Unlike the above trend based corrective actions, the present invention uses a real time control strategy that is based on the foundations of probability theory for providing predictive CPS1 and CPS2 control. In an example embodiment, a method includes calculating the CPS1 performance over moving 12-month time period and the CPS2 performance over the present month and then adjusting the control effort based on up-to-date CPS1/CPS2 performance numbers at a certain time, and how much time is remaining in the 12-month time period and the current month. It should be understood that although the following examples focus on CPS1 compliance, the present invention is also applicable to CPS2 or any other performance standard. In particular, the CPS2 methodology described in commonly assigned, pending U.S. patent application Ser. No. 11/157,056 may be used in conjunction with the present invention to manage power flow in a power network.
  • In an example embodiment of the present invention, a method for controlling an operation of an electrical power network may include configuring an allowable performance of an electrical power network over a predetermined time period as a probability expression comprising a historical term and a future term having an electrical power network operating condition variable. The method may then include calculating a network performance target value according to the probability expression by using a historical electrical power network operating condition value for the electrical power network operating condition variable. The method may further include using the performance target value for controlling the electrical power network effective to achieve the allowable performance.
  • A corrective action for satisfying the CPS1 requirement may be determined by comparing a calculated one minute ACE target value with a calculated running one minute average ACE. When an absolute value of the running one minute average ACE is less than the corresponding one minute ACE target, no corrective action is generally required. Conversely, when the absolute value of the running one minute average ACE is greater than the corresponding one minute ACE target, corrective action may be necessary.
  • In an aspect of the invention, the CPS1 term may be expressed as a probability corresponding to a number of past clock periods during a 12 month time period and a number of future clock periods in the 12 month time period. The term nT may be used to designate the number of total clock-minute time intervals within a time period T. A 12-month time period T has (nT=365 days/year×24 hours/day×60 1-minute intervals/hour) 525600 clock-minute time intervals. The term nt may be used to denote a number of clock-minute time intervals until a present time within a desired 12-month time period T, i.e. past clock periods. The term nT-t may be used to denote the number of remaining clock-minute time intervals until the end of period T, i.e., future clock periods. To simplify a derivation of a probability expression, term X may be used to represent:
  • X = [ ( ACE i - 10 B i ) i Δ F i ] ( 6 )
  • Accordingly, the CPS1 standard may be equivalently expressed in probabilistic terms as an expected value:

  • X=E{X}≦ε 1 2   (7)
  • with the assumption that the expected value of X (E{X}) equals its time average over a sufficiently long time period. Accordingly, the expected value, or average, of X during the nt clock-minute time period may be denoted by X 1, and the expected value, or average, of X during the remaining nT-t clock-minute time period may be denoted by X 2. Equation (7) then becomes:
  • X _ = n t n t + n T - t X _ 1 + n T - t n t + n T - t X _ 2 ɛ 1 2 ( 8 )
  • where nT=nt+nT-t, and nt, nT-t and nT are all known, and the average of X during the nt clock-minute time period X 1 may be computed with historical data using Equation (9):
  • X _ 1 = AVG n t Clock - MinuteTimeIntervals [ ( ACE i - 10 B i ) i Δ F i ] ( 9 )
  • Therefore, Equation (8) may be expressed in terms of the average of X during the remaining nT-t clock-minute time period, X 2 as:

  • X 2≦[(n t +n T-t1 2 −n t X 1 ]/n T-t   (10)
  • where X 2 represent a statistical target for
  • [ ( ACE i - 10 B i ) i Δ F i ]
  • for the remaining nT-t clock-minute time horizon. This statistical target can be lower or higher depending on the CPS1 performance up until a current point in time. Consequently, a prediction of a future target may be based on past CPS1 performance.
  • CPS1 performance requires that for every clock-minute:
  • [ ( ACE i - 10 B i ) i Δ F i ] [ ( n t + n T - t ) ɛ 1 2 - n t X _ 1 ] / n T - t . ( 11 )
  • If Equation (11) is satisfied for every clock-minute for the remaining nT-t clock-minute time horizon, then a desired performance of X 2≦[(n t+nT-t1 2−nt X 1]/nT-t may be achieved.
  • In an example embodiment of the invention, a just prior clock-minute average frequency error ΔFi can be used as a current clock-minute average frequency error to calculate a current clock-minute ACE target, which in turns allows determination of an eventual CPS1 based control amount. When ΔFi>0, equation (11) may be rearranged as:

  • ACE i≦{[(n t +n T-t1 2 −n n X 1 ]/n T-t}(−10B i)/ΔF i   (12)
  • Conversely, when ΔFi<0, then equation (11) may be rearranged as:

  • ACE i≧{[(n t +n T-t1 2 −n t X 1 ]/n T-t}(−10B i)/ΔF i   (13)
  • In another example embodiment, a largest clock-minute average frequency error ΔFi (in absolute value), denoted by (ΔFi)m=maxi({|ΔFi|})sign(ΔFi), among a past larger time period (for instance, the previous 30-minute time period) may be used.
  • The clock-minute ACE target ACEt may be calculated, for example, using a just prior clock-minute average frequency error or a largest clock-minute average frequency error, as:

  • ACE t={[(n t +n T-t1 2 −n t X 1 ]/n T-t}(−10B i)/(ΔF i)m   (14)
  • This clock-minute ACE target (ACEt) may be calculated on a minute-by-minute (minutely) basis. The CPS1 control scheme requires that CPS based AGC must take appropriate control actions such that the algebraic value of the current average 1-minute average ACE is below the calculated CPS1 1-minute average ACE target (ACEt), as shown in Equation (14).
  • Once the ACE target has been calculated, a system operator may correlate, through historical data or a performance algorithm, the amount of power correction necessary to achieve the desired ACE target. In an example embodiment of the invention, the amount of power produced as a corrective action to comply with the CPS1 standard is based on the calculated ACE target and a sum of the deviations between the calculated ACE target and the instantaneous ACE values from the beginning of a particular period, such as the 12 month monitoring period. As shown in the flow chart of FIG. 3, the amount of power to be generated to achieve CPS1 compliance requires the calculation of the ACE target (ACEt) as provided for in equation 14. It should be understood that these ACEt values may be calculated at any period of time or interval, but may typically be calculated at the end of each monitoring interval, although calculations may be done more often during each AGC monitoring cycle. The AGC monitoring cycle for a power network is the time during which performance is monitored and control signals are generated. In one embodiment of the present invention, the ACE target is calculated at an AGC monitoring cycle of 4 seconds, although 1 minute monitoring cycles, or any other interval may be used. Moreover, the ACE target values may be calculated for current, past or future (expected/predicted) time intervals and are used as reference points and performance guides.
  • To determine the type and extent of power network control necessary, and as shown in the flow chart of FIG. 3 step 300, the ACE target (ACEt) for the current 1 minute time interval is calculated, for example, according to equation (14). The instantaneous ACE value (ACEt) for the current monitoring time interval is then calculated in step 302. In step 304 a -difference or deviation from the corresponding ACE target (ACEt) is determined and may be stored in a memory of a monitoring and control system. The deviations from the ACE target values may be -algebraically calculated as:

  • ΔACE i =ACE i −ACE t   (15)
  • During each subsequent monitoring time interval, a corresponding deviation is calculated and summed with previous calculated deviations. The deviations may be summed from a first monitoring time interval to a just prior monitoring interval within a monitoring period or selected time interval of interest (although any combination or subset of the stored deviation values may be used). In an example embodiment, the deviations, ΔACEi, may be summed from a beginning of a current 1 minute interval to previous AGC control cycle 306. The resulting summed deviations may be denoted as ΣΔACEi. The total number of monitoring time intervals from the beginning interval to the just previous interval is denoted and stored. For example, the number of AGC control cycles, #Cycles, from the beginning of the current 1 minute time interval to the previous AGC control cycle is recorded in step 308.
  • In step 310, a running 1 minute ACE average, ACEavg1, for the time period up to the current monitoring time interval may be calculated as follows:

  • ACE avg1=(ΣΔACE i/#Cycles)+ACE t   (16)
  • To determine whether corrective action is necessary, and as shown in step 312, a first determination is made whether ΔFi is less than 0 and ACEavg1 is greater than ACEt. If true, no correction is needed 318. Otherwise, a second determination 316 may be made whether ΔFi is greater than 0 and ACEavg1 is less than ACEt. If true, no correction is needed 318. Otherwise, a CPS1 correction may be required 316. The correction amount may be calculated from the following equation:

  • Correctioni=−(ΔACE i-l +ACE t)   (17)
  • This correction may be clamped to the system-allowed single cycle maximum correction in quantity without considering the sign. The first term in the expression of Correction is simply an integral action which may be taken in negative feedback to reduce the integrated deviation of the instantaneous ACE from its 1-minute average ACE.
  • As previously described, there are several performance standards by which system operators must comply. However, it should be understood that when multiple compliance standards such as CPS1 and CPS2 require simultaneous compliance, the higher priority compliance standard shall prevail. For example, since CPS2 control standard has higher priority than CPS1, if CPS2 correction and CPS1 correction are in the same direction, the larger correction amount will be used for AGC control; if CPS1 correction and CPS2 correction are in opposite directions, only CPS2 correction will be used for AGC control, and CPS1 correction is ignored; if CPS1 correction is zero and CPS2 is non-zero, CPS2 correction will be used for AGC control; if CPS2 correction is zero and CPS1 is non-zero, CPS1 correction will be used for AGC control; if both CPS1 correction and CPS2 correction are zero's, no CPS correction will be included in AGC control.
  • FIG. 4 shows a block diagram of an example system 400 for controlling an electrical power network 420 that may include an electrical power distribution grid 419 and one or more generators 416. The monitoring and control system 400 as shown may include a database 406, such as an AGC database, for storing electrical power network performance data and one or more processor(s) 404 coupled to the database 406 for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable. The system 400 may also include a monitoring and control module 410 coupled to the processor 404 for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance.
  • The monitoring and control system 400 depicted in FIG. 4 may be used for NERC CPS1 Compliance wherein one or more processors 404 for the execution of monitoring and control software and operating system software. Processor 404 may take any form known in the art, for example, an analog or digital microprocessor or computer, and it may be integrated into or combined with one or more processors used for other functions related to power flow monitoring of the network 420. In an aspect of the invention, the processor 404, its operating system, and related applications (e.g. executable code) may be executed in a real-time or nearly real-time basis. Memory 408 may include one or more ROMs, PROMs, EROMs, EPROMs, RAMs, SRAMS, DRAMs, FPM DRAMS, EDO DRAMs, SDRAMs, DDR SDRAM, RDRAM, MEMORY STICKS, FLASH MEMORY, VIRTUAL MEMORY and/or electronic circuitry cable of storing program instructions and/or configuration data. Memory 408 may be connected to processor(s) 404 and to database 406 stored on storable medium such as a hard drive, CD or diskette or any other non-volatile means of storage.
  • Database 406, such as AGC database, may be connected to and accessible by the one or more processors 404 and stores monitoring and control data and applications related to the monitoring and controlling a power network. From external field data 412 and field device(s) 418, such as a SCADA network, monitoring data is feed to a monitoring and control module 410 comprising a CPS Performance module 422, a CPS1 Control Module 424, and a Control Decision Module 422. As used herein it should be understood that a module is a computer program functioning as either stand-alone software or software that is part of another application dedicated to the performance of a particular function.
  • The processor(s) 404 forwards to CPS Performance Monitoring Module 422, field data such as net interchange and actual frequency data necessary for the calculation of an instantaneous ACE value. The calculated instantaneous ACE value and related field data are sent to the CPS1 Performance Control Module 424 wherein ACE target values, deviations from target values, summed deviations, the sum of monitoring intervals, 1 minute average ACE values and control threshold values are calculated and stored in memory 408. Field and calculated data are then sent to the Control Decision Module 422, where a determination is made of the corrective action to be taken. If there is a need for corrective action, the Control Decision Module 422 generates a network control signal 426 for the Generation Allocation module 424. The Generation Allocation module 424 will determine or assign power network equipment or components necessary to take corrective action. If for example, additional power is necessary to maintain CPS1 compliance, processor(s) 404 sends a generation command via the network 414 to Generator 416.
  • Based on the foregoing specification, the exemplary methods described for controlling an operation of an electrical power network may be implemented using computer programming or engineering techniques including computer software, firmware, hardware or any combination or subset thereof. Any such resulting program, having computer-readable code means, may be embodied or provided within one or more computer-readable media, thereby making a computer program product, i.e., an article of manufacture, according to the invention. The computer readable media may be, for instance, a fixed (hard) drive, diskette, optical disk, magnetic tape, semiconductor memory such as read-only memory (ROM), etc., or any transmitting/receiving medium such as the Internet or other communication network or link. The article of manufacture containing the computer code may be made and/or used by executing the code directly from one medium, by copying the code from one medium to another medium, or by transmitting the code over a network.
  • In an example embodiment, the computer readable media may include computer-readable code for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable. The computer readable media may also include computer-readable code for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance. In an example application, the computer readable media may be used for upgrading an existing AGC and/or CPS control system for an electrical power network.
  • One skilled in the art of computer science will easily be able to combine the software created as described with appropriate general purpose or special purpose computer hardware, such as a microprocessor, to create a computer system or computer sub-system embodying the method of the invention. An apparatus for making, using or selling the invention may be one or more processing systems including, but not limited to, a central processing unit (CPU), memory, storage devices, communication links and devices, servers, I/O devices, or any sub-components of one or more processing systems, including software, firmware, hardware or any combination or subset thereof, which embody the invention.
  • While various embodiments of the present invention have been shown and described herein, it will be obvious that such embodiments are provided by way of example only. Numerous variations, changes and substitutions may be made without departing from the invention herein. Accordingly, it is intended that the invention be limited only by the spirit and scope of the appended claims.

Claims (22)

1. A method for controlling an operation of an electrical power network comprising:
configuring an allowable performance of an electrical power network over a predetermined time period as a probability expression comprising a historical term and a future term having an electrical power network operating condition variable;
calculating a network performance target value according to the probability expression by using a historical electrical power network operating condition value for the electrical power network operating condition variable; and
using the performance target value for controlling the electrical power network effective to achieve the allowable performance.
2. The method of claim 1, wherein the electrical power network operating condition variable comprises a system frequency error variable.
3. The method of claim 2, wherein the historical electrical power network operating condition value comprises a historical system frequency error value.
4. The method of claim 3, wherein the historical frequency deviation value is selected from a historical monitoring interval just prior to a current monitoring interval.
5. The method of claim 4, wherein the historical monitoring interval comprises a just prior clock minute interval.
6. The method of claim 3, wherein the historical frequency deviation value comprises a largest historical frequency deviation value selected from among a plurality of historical frequency deviation values corresponding to respective historical monitoring intervals.
7. The method of claim 1, further comprising determining an instantaneous performance value of the electrical power network.
8. The method of claim 1, further comprising calculating a deviation between the performance target value and the instantaneous performance value for a monitoring interval.
9. The method of claim 8, further comprising the calculating a sum of respective deviations for performance target values and instantaneous performance values for a plurality of monitoring intervals.
10. The method of claim 9, further comprising calculating a deviation ratio between the sum of respective deviations and a number of the plurality of monitoring intervals.
11. The method of claim 10, further comprising calculating an average performance target value responsive to a sum of the deviation ratio and the performance target value.
12. The method of claim 11, further comprising using the average performance target and a historical electrical power network operating condition value to determine a control action for managing the electrical power network.
13. The method of claim 12, wherein the historical electrical power network operating condition value comprises a historical system frequency error value.
14. The method of claim 13, further comprising calculating a power correction amount responsive to the deviations and the performance target value.
15. A system for managing an electrical power network comprising:
a database for storing electrical power network performance data; and
a processor coupled to the database for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable; and
a monitoring and control module coupled to the processor for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance.
16. The system of claim 15, further comprising a network reporting module in communication with the processor for reporting historical network performance data.
17. The system of claim 15, wherein the historical network performance data comprises a historical system frequency error value.
18. The system of claim 15, further comprising a generation allocation module in communication with the monitoring and control module for controlling a performance of the electrical power network responsive to the network control signal.
19. The system claim 15, wherein the monitoring and control module further comprises a control performance standard monitoring module for monitoring real time network performance data.
20. The system of claim 19, wherein the monitoring and control module further comprises a control performance standard one control module for determining a deviation of network real time network performance from the target value.
21. The system of claim 20, wherein the monitoring and control module further comprises a control decision module for determining when the deviation indicates that a control action is needed.
22. Computer readable media containing program instructions for controlling an electrical power network, the computer readable media comprising:
computer-readable code for calculating a performance target value according to a probability expression comprising a historical term and a future term having an electrical power network operating condition variable by using a historical electrical power network operating condition value extracted from the electrical power network performance data for the electrical power network operating condition variable; and
computer-readable code for using the performance target value to generate a network control signal for controlling the electrical power network effective to achieve the allowable performance.
US11/712,814 2006-03-07 2007-03-01 Method and system for controlling an operation of an electrical power network Active 2028-03-18 US7787995B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US11/712,814 US7787995B2 (en) 2006-03-07 2007-03-01 Method and system for controlling an operation of an electrical power network
PCT/US2007/005930 WO2007103500A2 (en) 2006-03-07 2007-03-07 Method and system for controlling an operation of an electrical power network

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US77984506P 2006-03-07 2006-03-07
US11/712,814 US7787995B2 (en) 2006-03-07 2007-03-01 Method and system for controlling an operation of an electrical power network

Publications (2)

Publication Number Publication Date
US20070211887A1 true US20070211887A1 (en) 2007-09-13
US7787995B2 US7787995B2 (en) 2010-08-31

Family

ID=38475564

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/712,814 Active 2028-03-18 US7787995B2 (en) 2006-03-07 2007-03-01 Method and system for controlling an operation of an electrical power network

Country Status (2)

Country Link
US (1) US7787995B2 (en)
WO (1) WO2007103500A2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110178643A1 (en) * 2008-09-29 2011-07-21 Malcolm Stuart Metcalfe System, method, and computer readable medium for regulating demand for electricity
JP2012143140A (en) * 2010-12-29 2012-07-26 General Electric Co <Ge> Methods and systems for controlling power conversion system
US20130321040A1 (en) * 2012-05-31 2013-12-05 General Electric Company Method and system for using demand response to provide frequency regulation
CN111339479A (en) * 2020-03-09 2020-06-26 西安热工研究院有限公司 Calculation method for standard-reaching emission real-time concentration limit value of pollutants of thermal power generating unit

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4136393A (en) * 1977-07-18 1979-01-23 Westinghouse Electric Corp. Method of power demand control with time dependent target
US4166975A (en) * 1976-09-17 1979-09-04 General Electric Company Multiple rate electrical energy metering system and method
US5487002A (en) * 1992-12-31 1996-01-23 Amerigon, Inc. Energy management system for vehicles having limited energy storage
US6681156B1 (en) * 2000-09-28 2004-01-20 Siemens Aktiengesellschaft System and method for planning energy supply and interface to an energy management system for use in planning energy supply
US20040249775A1 (en) * 2003-05-13 2004-12-09 Dingguo Chen Very short term load prediction in an energy management system
US20040260489A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Energy management system in a power and distribution system
US20040257858A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Dynamic economic dispatch for the management of a power distribution system
US20040257059A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Method of dynamic economic dispatch
US6865509B1 (en) * 2000-03-10 2005-03-08 Smiths Detection - Pasadena, Inc. System for providing control to an industrial process using one or more multidimensional variables
US20060041405A1 (en) * 2004-06-22 2006-02-23 Dingguo Chen System and method for controlling the performance of a power generating system
US7058522B2 (en) * 2003-05-13 2006-06-06 Siemens Power Transmission & Distribution, Inc. Very short term load prediction
US7092798B2 (en) * 2003-05-13 2006-08-15 Siemens Power Transmission & Distribution, Inc. System for control performance standards
US20060184472A1 (en) * 2005-02-03 2006-08-17 Dingguo Chen Identify data sources for neural network
US7233843B2 (en) * 2003-08-08 2007-06-19 Electric Power Group, Llc Real-time performance monitoring and management system

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4166975A (en) * 1976-09-17 1979-09-04 General Electric Company Multiple rate electrical energy metering system and method
US4136393A (en) * 1977-07-18 1979-01-23 Westinghouse Electric Corp. Method of power demand control with time dependent target
US5487002A (en) * 1992-12-31 1996-01-23 Amerigon, Inc. Energy management system for vehicles having limited energy storage
US6865509B1 (en) * 2000-03-10 2005-03-08 Smiths Detection - Pasadena, Inc. System for providing control to an industrial process using one or more multidimensional variables
US6681156B1 (en) * 2000-09-28 2004-01-20 Siemens Aktiengesellschaft System and method for planning energy supply and interface to an energy management system for use in planning energy supply
US20040249775A1 (en) * 2003-05-13 2004-12-09 Dingguo Chen Very short term load prediction in an energy management system
US20040257858A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Dynamic economic dispatch for the management of a power distribution system
US20040257059A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Method of dynamic economic dispatch
US20040260489A1 (en) * 2003-05-13 2004-12-23 Ashmin Mansingh Energy management system in a power and distribution system
US7058522B2 (en) * 2003-05-13 2006-06-06 Siemens Power Transmission & Distribution, Inc. Very short term load prediction
US7092798B2 (en) * 2003-05-13 2006-08-15 Siemens Power Transmission & Distribution, Inc. System for control performance standards
US7321810B2 (en) * 2003-05-13 2008-01-22 Siemens Power Transmission & Distribution, Inc. Method of dynamic economic dispatch
US7454270B2 (en) * 2003-05-13 2008-11-18 Siemens Power Transmission & Distribution, Inc. Dynamic economic dispatch for the management of a power distribution system
US7233843B2 (en) * 2003-08-08 2007-06-19 Electric Power Group, Llc Real-time performance monitoring and management system
US20060041405A1 (en) * 2004-06-22 2006-02-23 Dingguo Chen System and method for controlling the performance of a power generating system
US20060184472A1 (en) * 2005-02-03 2006-08-17 Dingguo Chen Identify data sources for neural network

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110178643A1 (en) * 2008-09-29 2011-07-21 Malcolm Stuart Metcalfe System, method, and computer readable medium for regulating demand for electricity
JP2012143140A (en) * 2010-12-29 2012-07-26 General Electric Co <Ge> Methods and systems for controlling power conversion system
US20130321040A1 (en) * 2012-05-31 2013-12-05 General Electric Company Method and system for using demand response to provide frequency regulation
CN111339479A (en) * 2020-03-09 2020-06-26 西安热工研究院有限公司 Calculation method for standard-reaching emission real-time concentration limit value of pollutants of thermal power generating unit

Also Published As

Publication number Publication date
WO2007103500A2 (en) 2007-09-13
WO2007103500A3 (en) 2008-01-03
US7787995B2 (en) 2010-08-31

Similar Documents

Publication Publication Date Title
US10855081B2 (en) Energy storage controller with battery life model
US7085660B2 (en) Energy management system in a power and distribution system
US10739742B2 (en) Building energy system with stochastic model predictive control
US10222427B2 (en) Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue
US8019485B2 (en) System and method for controlling the performance of a power generating system
US7689323B2 (en) Automatic generation control of a power distribution system
US7305282B2 (en) Very short term load prediction in an energy management system
US7454270B2 (en) Dynamic economic dispatch for the management of a power distribution system
US11258260B2 (en) Battery optimization control system with data fusion systems and methods
US9762087B2 (en) Ancillary services network apparatus
US10167850B2 (en) Systems, methods and apparatus for improved energy management systems with security constrained dynamic dispatch for wind power management
JP4527092B2 (en) System stabilization device
US10594153B2 (en) Frequency response optimization control system
EP1478074B1 (en) Dynamic economic dispatch
US20140347016A1 (en) Method for controlling an energy storage system
US9941699B2 (en) Systems, methods and apparatus for improved management and control of energy delivery systems
US20160187910A1 (en) Unit and Method for Energy Regulation of an Electrical Production and Consumption System
US10734812B2 (en) Renewable power system and sizing method for controllable plant associated with renewable power system
US20190245368A1 (en) Frequency response control system with clipping parameter determination
US7787995B2 (en) Method and system for controlling an operation of an electrical power network
US20220220938A1 (en) Method for controlling a renewable energy farm in compliance with obligations towards a power grid
CN115169816A (en) Energy management method and energy management system of wind and light storage station
Zhang New ancillary service market design to improve MW-frequency performance: reserve adequacy and resource flexibility
Papalexopoulos Mass market demand response management for the smart grid

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC., N

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CHEN, DINGGUO;REEL/FRAME:019038/0791

Effective date: 20070226

AS Assignment

Owner name: SIEMENS POWER GENERATION, INC., FLORIDA

Free format text: MERGER;ASSIGNOR:SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.;REEL/FRAME:023307/0594

Effective date: 20080930

Owner name: SIEMENS ENERGY, INC., FLORIDA

Free format text: CHANGE OF NAME;ASSIGNOR:SIEMENS POWER GENERATION, INC.;REEL/FRAME:023307/0743

Effective date: 20080930

Owner name: SIEMENS POWER GENERATION, INC.,FLORIDA

Free format text: MERGER;ASSIGNOR:SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.;REEL/FRAME:023307/0594

Effective date: 20080930

Owner name: SIEMENS ENERGY, INC.,FLORIDA

Free format text: CHANGE OF NAME;ASSIGNOR:SIEMENS POWER GENERATION, INC.;REEL/FRAME:023307/0743

Effective date: 20080930

STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS ENERGY, INC.;REEL/FRAME:027286/0887

Effective date: 20111128

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552)

Year of fee payment: 8

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12