US20090099801A9 - System and method for on-line monitoring and billing of power consumption - Google Patents

System and method for on-line monitoring and billing of power consumption Download PDF

Info

Publication number
US20090099801A9
US20090099801A9 US11/431,849 US43184906A US2009099801A9 US 20090099801 A9 US20090099801 A9 US 20090099801A9 US 43184906 A US43184906 A US 43184906A US 2009099801 A9 US2009099801 A9 US 2009099801A9
Authority
US
United States
Prior art keywords
meter
data
voltage
phase
transponder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US11/431,849
Other versions
US20060259254A1 (en
US7539581B2 (en
Inventor
Sayre Swarztrauber
Doron Shafrir
Stanley Lo
Michael Newsome
Eric Jacobson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quadlogic Controls Corp
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US11/431,849 priority Critical patent/US7539581B2/en
Priority to US11/600,234 priority patent/US7596459B2/en
Priority to ES06849894.8T priority patent/ES2554499T3/en
Priority to ARP060105013A priority patent/AR057593A1/en
Priority to PL06849894T priority patent/PL1960932T3/en
Priority to CN200680049289XA priority patent/CN101351803B/en
Priority to EP06849894.8A priority patent/EP1960932B1/en
Priority to PCT/US2006/044762 priority patent/WO2007094837A2/en
Publication of US20060259254A1 publication Critical patent/US20060259254A1/en
Priority to US12/338,878 priority patent/US20090132096A1/en
Publication of US20090099801A9 publication Critical patent/US20090099801A9/en
Application granted granted Critical
Publication of US7539581B2 publication Critical patent/US7539581B2/en
Priority to US12/541,852 priority patent/US8090549B2/en
Priority to US13/199,664 priority patent/US8452555B2/en
Assigned to QUADLOGIC CONTROLS CORPORATION reassignment QUADLOGIC CONTROLS CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JACOBSON, ERIC, LO, STANLEY C., NEWSOME, MICHAEL, SHAFRIR, DORON, SWARZTRAUBE, SAYRE A.
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/008Modifications to installed utility meters to enable remote reading
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • H02J13/00017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/30Arrangements in telecontrol or telemetry systems using a wired architecture
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/60Arrangements in telecontrol or telemetry systems for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Definitions

  • the present invention relates to metering of and billing for electric power consumption, and has particular application to solid state electricity meters and powerline communication with such meters.
  • Submetering is the resale of electricity or allocation of costs within a multi-tenant property.
  • Master metered apartments are units of a multi-tenant residential building without individual electric meters; the cost of electricity for each apartment is included in the rent for that apartment. Because tenants of such units typically consume up to 30% more electricity than tenants who pay a separate bill for energy consumed, there is a demand for submetering of such units.
  • CMOS ram backed up by battery to maintain an audit trail of key energy information either every day or every 15 minutes.
  • This type of memory storage can suffer data loss through power and battery failure, data corruption due to “fast transients”—a type of interference commonly found on power lines.
  • the Transmeter® systems manufactured and sold through 1999 collect and deliver information from Transmeters® located in multi-tenant properties.
  • the individual Transmeters® inject signals onto the power distribution lines (a technique known as power line communication, or “PLC”) in the multi-tenant property to a more centrally located device, the Transponder.
  • PLC power line communication
  • the Transponder is typically installed at the point of entry of electricity to that property. If the property has more than one electrical service, one Transponder is installed per service.
  • the Transponders are interconnected via an RS-485 network. One of the Transponders connects by modem to a dedicated standard telephone line.
  • the billing computer is configured to dial any property on command of the operator.
  • the data is processed by standard spreadsheet or database programs to generate bills in either paper or machine-readable format for use by the property management companies.
  • the submetering market has several requirements that often fail to be met by existing submetering systems. Such requirements include: (1) stringent metering standards found outside the United States such as those of Industry Canada and the International Electrotechnical Commission (a European standards organization with applicability to most of the world outside of North America). Not only must a submeter meet electrical standards, it must comply with strict mechanical standards as well.
  • the present invention comprises a system for monitoring energy usage on a power line.
  • this system comprises (a) an electronic microprocessor-controlled digital electricity metering device connected to the power line and comprising a non-volatile non-battery-powered data-storage device, wherein the metering device is capable of interval metering and of receiving a data request and transmitting data in response to the request over the power line; and (b) a data collector (preferably, a transponder) connected to the metering device via the power line.
  • the data collector is preferably capable of (i) receiving data from and transmitting data to the metering device over the power line, (ii) storing data received from the metering device over the power line, and (iii) receiving data from and transmitting data to a remotely located computer (preferably, a billing computer).
  • the present invention comprises a system for monitoring energy usage, comprising: (a) one or more power lines; and (b) an electronic microprocessor-controlled digital electricity metering device connected to the power lines and comprising at least one non-volatile non-battery-powered data-storage device.
  • the metering device is capable of interval metering and of metering multiple billing entities.
  • the present invention comprises a power line communication system for communication between a master device and a slave device, comprising: (a) a master device connected to a power line and capable of transmitting a request for data over the power line to a slave device and of receiving data transmitted by the slave device over the power line, wherein the master device is capable of transmitting a request for data over the power line to the slave device that is at a frequency low enough to ensure reliable reception by the slave device, and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within specific transmission parameters; and (b) a slave device connected to the power line and capable of transmitting data over the power line in response to a request for data received over the power line from a master device, wherein the slave device is capable of transmitting data over the power line within the specific transmission parameters.
  • the present invention comprises a method of monitoring energy usage, comprising the steps of: (a) measuring energy usage using a microprocessor-controlled digital electricity metering device; (b) storing data representing measured energy usage at regular intervals of time in a non-volatile, non-battery-operated data storage device; (c) receiving a request for the stored data over a power line from a remotely located computer (preferably, a billing computer); and (d) in response to that request, transmitting the stored data over the power line to the remotely located computer.
  • a remotely located computer preferably, a billing computer
  • the present invention comprises a method of power line communication between a master device and a slave device, comprising the steps of: (a) transmitting a request for data over a power line from a master device to a slave device, wherein the request is at a frequency low enough to ensure reliable reception by the slave device (preferably, a transponder hunts between two or more channels to avoid narrow band noise and transmits the request at a data rate (baud rate) low enough to ensure reliable reception by the slave device), and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within a first set of specific transmission parameters; and (b) transmitting responsive data over the power line from the slave device to the master device in response to the request for data received by the slave device over the power line from the master device, wherein the responsive data is transmitted over the power line within the first set of specific transmission parameters.
  • This method when the situation requires, further comprises the steps of: (c) after a pre-determined period of time during which the master device has not received responsive data of acceptable quality from the slave device transmitted within the first set of specific transmission parameters, transmitting a subsequent request for data over the power line from the master device to the slave device, wherein the request is at a frequency low enough to ensure reliable reception by the slave device (again, preferably a transponder hunts between two or more channels to avoid narrow band noise and transmits the request at a data rate (baud rate) low enough to ensure reliable reception by the slave device), and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within a second set of specific transmission parameters; and (d) transmitting responsive data over the power line from the slave device to the master device in response to the subsequent request for data received by the slave device over the power line from the master device, wherein the responsive data is transmitted over the power line within the second set of specific transmission parameters.
  • the present invention comprises an application specific integrated circuit (ASIC) for monitoring energy usage, comprising: (a) a meter component; (b) a digital control logic component; (c) a real-time clock component; and (d) a power line communication component.
  • ASIC application specific integrated circuit
  • the present invention comprises a device for monitoring energy usage, comprising: (a) an application specific integrated circuit (ASIC) chip connected to and capable of being controlled by a microprocessor; (b) a microprocessor connected to the ASIC chip and capable of controlling the operation of the ASIC chip; and (c) a flash memory device connected to the ASIC chip and to the microprocessor, wherein the flash memory device is capable of receiving energy usage data from the ASIC chip and capable of being controlled by the microprocessor.
  • ASIC application specific integrated circuit
  • FIG. 1 is an overall installation diagram for a preferred embodiment of the present invention.
  • FIG. 2 is an installation diagram for a slave transponder.
  • FIG. 3 is a substation installation diagram of a master transponder.
  • FIG. 4 is an aerial transformer and coupling diagram.
  • FIG. 5 is a phase-to-phase inductive pad mount coupler diagram.
  • FIG. 6 is a signal transformer assembly diagram.
  • FIG. 7 is a concentrator/signal unit diagram.
  • FIG. 8 is a master and slave transponder power adapter diagram.
  • FIGS. 9 A-B and 10 provide a Display Board schematic diagram.
  • FIG. 11A provides a 10 series preferred embodiment power board schematic diagram.
  • FIG. 11B provides a KYZ schematic diagram.
  • FIG. 11C is a 20 series preferred embodiment power board schematic diagram.
  • FIGS. 12 A-C, 13 , 14 , and 15 A provide a Transponder schematic diagram.
  • FIGS. 15 B-C provide a Mini Closet Interface schematic diagram.
  • FIG. 16 is an Optical Adaptor schematic diagram.
  • FIGS. 17 A-B is a Modem Board schematic diagram.
  • FIG. 17C shows a schematic of the pulse expansion circuit.
  • FIG. 18 depicts a configuration of a preferred submeter system.
  • FIG. 19 shows how electrical parameters are accumulated in preferred software.
  • FIG. 20 depicts overall meter hardware of a preferred embodiment.
  • FIG. 21 depicts preferred PLC receive circuitry for an ASIC.
  • FIG. 22 is a diagram of a preferred two-pole lowpass filter used in an ASIC.
  • FIG. 23 depicts a preferred embodiment of the present invention used to address electricity theft.
  • FIG. 24 depicts a system configuration for preferred embodiment of a virtual meter.
  • FIG. 25 depicts two preferred configurations for power interruption using GFI.
  • FIGS. 1-8 A full system drawing for a preferred embodiment of the present invention can be found in FIGS. 1-8 .
  • the system preferably reads meters using four communications media: low voltage (120 volt) power lines, medium voltage distribution lines (12,500 volt), a municipal fiber optic communications ring, and the Internet.
  • FIG. 1 is an overall installation diagram for a preferred embodiment of the present invention.
  • FIG. 2 is an installation diagram for a slave (low-level) transponder.
  • FIG. 3 is a substation installation diagram of a master (high-level) transponder.
  • FIG. 4 is an aerial transformer and coupling diagram.
  • FIG. 5 is a phase-to-phase inductive pad mount coupler diagram.
  • FIG. 6 is a signal transformer assembly diagram.
  • FIG. 7 is a concentrator/signal unit diagram.
  • FIG. 8 is a master and slave transponder power adapter diagram.
  • the system and method of a preferred embodiment of the present invention comprises the following components (see FIG. 1 ):
  • Transmeters 100 These are the meters which monitor electricity, gas and water at the customer site.
  • Low-level Transponders 110 Utility distribution systems have distribution transformers 115 to bring medium voltage distribution voltages (4 ⁇ V through 33 kv) down to the low voltages (120-600 volt) connected to the customers.
  • Low-level Transponders communicate with the Transmeters and with high-level Transponders 130 located at substations. Transponders of either type are referred to herein as “data collectors” or simply as “transponders.” The context of usage will convey to those skilled in the art whether the transponder being discussed is a high- or low-level transponder, and whether the distinction is relevant. Referring to the embodiment illustrated in FIG.
  • high-level Transponder 130 requests data from a low-level Transponder 110 , which then requests the same data from a Transmeter 100 connected to the same distribution transformer.
  • a low-level Transponder 110 preferably communicates on the medium distribution voltage using a coupler 120 , which can be either: (A) an inductive coupler: a device that replaces the cable feeding the distribution transformer with medium distribution voltage (the inductive coupler has two signal wires that connect to the low-level Transponder), or (B) a capacitive coupler: a circuit that includes a capacitor and a signal transformer. Two signal wires connect to the Transponder.
  • a low-level Transponder 110 may have an optional meter with 24 channels. These channels can be used to measure energy delivered on up to 24 phases of individual feeders leaving the distribution transformer. This data may be used to identify losses by comparing aggregate readings of all Transmeters 100 connected by phase and by feeder to the known reading at the low-level Transponder. These losses may be caused by theft of service. Identification of theft of service is a feature of a preferred embodiment of the present invention.
  • a high-level Transponder (“Transponder 5”) 130 communicates with Low-level Transponders 110 , requesting specified data from specified Transmeters. The data request is made first, and then high-level Transponder 130 polls the low-level Transponder at a later time to see whether the data is ready.
  • the high-level Transponder may request data from several low-level Transponders in sequence and poll them later. Because higher data rates are possible on the medium voltage than the low voltage, the system may thus obtain greater reading efficiency.
  • the Transponders connect to one of several network media to communicate with the billing computer: (A) fiber optic network; (B) hard wire RS-485 network; (C) TCP/IP LAN; or (D) telephone lines.
  • a Billing Computer 140 connects one or many communications networks to read data from many Transponders.
  • the Billing computer is programmed to respond to requests from the utility or requests made over the Internet, and to deliver the required information in a form that is portable to whatever billing software the utility uses, typically MV-90.
  • Billing Computers may be interconnected over the Internet to form a WAN.
  • the user accessing the site does not need to know which Billing Computer is requesting the information, nor the route to the high-level Transponder or low-level Transponder en route to the source of the information, the Transmeter.
  • an Internet interface at the Billing Center allows the utility or its customer to access an Oracle database.
  • Preferred embodiments of the submeter comprise a combination of a Display Board, a Power Board and a case to complete the product.
  • the Display Board is common to all embodiments.
  • the Display Board schematic diagram can be found in FIGS. 9 A-B and 10 .
  • the Display Board has an application-specific integrated circuit (“ASIC”) U 1 , a Motorola 68000 microprocessor U 2 , an LCD driver U 4 and display LCD 1 , a RAM memory (U 3 and U 6 ), flash memory U 5 and a voltage reference CR 1 .
  • ASIC application-specific integrated circuit
  • the Display Board is preferably fabricated on a 5′′ to 2′′ 10 layer board with special care paid to ground planes. This affords improved protection against “fast transients,” a type of interference found on power lines which often causes corruption of memory.
  • the Power Boards vary depending on the shape and connection requirements of the submeter.
  • the power boards preferably contain power supply components, a battery for the real time clock, current and voltage interfaces, as well as optical, RS-232/485, modem, gas and water meter and other interfaces.
  • Flash memory U 5 maintains an audit trail of all critical metering (electric, gas and water) and events (power outages, tamper attempts, etc.). This audit trail forms a second line of defense against “fast transient” induced memory loss.
  • the critical data is preferably stored at least every 15 minutes.
  • the flash memory is most useful for storing firmware or archiving data. It does not function like a RAM. Unlike RAM memories, it is not susceptible to corruption due to “fast transients.” With the preferred archiving method, maximum data loss can be controlled by selecting a frequent archiving period, minimizing the commercial importance of a memory loss.
  • the flash memory audit trail of energy usage has independent commercial value to ESCOs, generating companies, and electric utilities under derogation: energy can be sold at varying prices during the day, even on a 15 or 5 minute basis.
  • the electric meter monitors each phase of the incoming power: electricity measuring volts; amps; real, reactive, and apparent energy and power; power factor; total harmonic distortion; and frequency.
  • the submeter also counts contact closure transitions emitted from water and gas meters.
  • Preferred submeters have a liquid crystal display, an optical port, and an (optional) RS-232/485 port.
  • Preferred submeters feature a power-line modem to communicate over the low voltage (120 volt, 220 volt, 480 volt or 600 volt) lines to a Transponder or Low-level Transponder.
  • the system comprises a small apartment-style submeter that mounts next to a breaker panel within a wall and uses current transformers mounted on the apartment feeders to sense current.
  • the system comprises: (1) a plug-in replacement for socket-style round ANSI meters; (2) gas and water contact closure accumulators, which continue accumulating by battery even if the electric power is removed; and (3) full complex plane (amplitude and angle) calibration of internal 10, 100, or 200 amp current elements to achieve a high level of calibration.
  • CT 1 , CT 2 , and CT 3 are inputs from the current transformer. They connect to resistor networks that convert the current source into a voltage level that is compatible with the ASIC (described below).
  • PH-A, PH-B, and PH-C are measurement voltage levels that enter a different resistor network and divide the voltage to a level that is readable by the ASIC.
  • H 3 is a header connection to the display board.
  • H 8 is a header that connects high voltage phases.
  • PLCX 1 , PLCX 2 , and PLC 1 are control signals that perform power line communication (PLC).
  • U 2 (in the right-central part of the diagram—near H 7 ) is a microprocessor that is connected to a contact closure counting circuit. Contact closures are isolated by L 3 and OPT 1 through OPT 6 .
  • Q 4 and LED 1 are the optical receiver and transmitter, respectively.
  • the ferrite beads FB are intended to decouple high frequency noise.
  • SW 1 , SW 2 , and SW 3 are user access control switches.
  • T 1 is the transformer for the main power supply transformer for this unit. The input is 120/220 selectable by SW 4 . Power voltage is rectified and regulated.
  • T 2 provides an isolated power supply for an optional Modem Board attachment.
  • a third preferred embodiment (the “50 series”) comprises an IEC bottom connect meter in which 100 amps at 200 volts 50 Hz pass through the meter to the customer and full complex plane (amplitude and angle) calibration of internal 10, 100, or 200 amp current elements to achieve high levels of calibration.
  • a fourth preferred embodiment (the “MC series”) comprises a 24 channel meter that can be configured to 24 single phase loads, 12 apartment style loads, or 8 three phase commercial loads and provides economical per point cost.
  • the Transmeter MC series schematic diagram is of the PCB type TMX- 5 and can be found in FIGS. 12 A-C, 13 , 14 , and 15 A. Note that the Low-level Transponder and the Transponder 5 also have PCB type TMX- 5 . Component placement determines whether the board is an MC series, Low-level Transponder, or Transponder 5 .
  • the circuits in FIGS. 12 A-C, 13 , 14 , and 15 A are discussed below.
  • Low-level Transponder (1) receives instructions from Transponder to read a meter within its communication scope—typically one distribution transformer; and (2) can also be a meter to act as a check against loss due to theft.
  • the Low-level Transponder schematic diagram is of PCB type TMX- 5 and can be found in FIGS. 12 A-C, 13 , 14 , and 15 A.
  • Transponder (1) reads Transmeters directly or via Low-level Transponders; and (2) communicates with fiber, phone or TCP/IP LAN.
  • the Transponder schematic diagram is of PCB type TMX- 5 and can be found in FIGS. 12 A-C, 13 , 14 , and 15 A.
  • circuits in FIGS. 12 A-C, 13 , 14 , and 15 A are circuits in FIGS. 12 A-C, 13 , 14 , and 15 A.
  • H 8 (see FIG. 12A ) is a switch or adapter that selects between 120/220 VAC power supply voltage. Each phase is independently rectified and the rectified voltages are tied together. This requires only one of the power phases to be active for the system to receive power.
  • the transponder preferably has the ability to communicate on three power phases.
  • There are three sets of PLC transmit and receive circuits (see FIG. 12A ).
  • a slave microprocessor U 9 (see FIG. 15A , lower left) controls the transmit circuits by controlling the following: the PLC phase gating IC U 11 (see FIG. 12A ), level inverter IC U 13 (see FIG. 12A ), and analog inputs U 14 (see FIG. 12A ).
  • J 3 is the connector for serial communication to an external contact closure counter. Its power supply is current limited.
  • the algorithms contained in the slave microprocessor are described by the HEX formatted file, PLCGATE.HEX in the attached Appendix.
  • meter inputs I 0 /N 0 through I 23 /N 23 , shown in FIG. 13 ), each connecting to its own current-to-voltage resistor network.
  • Metering is gated three phases at a time by analog multiplexers U 2 -U 8 (see FIG. 13 ) into the ASIC by means of a slave microprocessor U 8 (see FIG. 15A ).
  • a slave microprocessor U 8 Its master, the 68000, communicates with the slave to synchronize phase and timing.
  • the algorithms contained in the slave microprocessor are described by the HEX formatted file, PHZGATE.HEX, in the attached Appendix.
  • SW 1 , SW 2 , and SW 3 (see FIG. 13 ) ate user access control switches.
  • H 2 and H 3 are headers that connect to the current transformers CT 1 -CT 24 (see FIG. 14 ) to current inputs.
  • MV- 1 , MV- 2 , and MV- 3 are measurement voltage levels that enter a different resistor network and divide the voltage to a level that is readable by the ASIC.
  • H 4 , J 1 , and J 2 are expansion headers that allow reading of more current channels.
  • H 5 (see FIG. 15A ) is a header connection to the display board.
  • J 3 (see FIG. 15A ) is a header that optionally connects with external pulse counters.
  • the circuit involving Q 8 provides a current-limited +5V supply.
  • Q 7 and LED 1 are an optical receiver and transmitter, respectively.
  • This software runs on the Billing Computer and preferably comprises the following functionality:
  • the gas and water meter interfaces continue to accumulate contact closures in the absence of electric power applied to the electricity meter. This is important for an electric company that wishes to sell meter reading services to water and gas utilities, yet guarantee data integrity even when electric power is out for an extended period of time.
  • a contact-closure counting microprocessor is powered by a diode OR of the +5V supply and on-board battery, enabling contact-closure counting in the absence of power.
  • the pulse microprocessor accumulates counts in its internal registers and sends the data to the main processor via serial transfer.
  • the microprocessor energizes the primary of a pulse transformer.
  • the contact closure points are in series with the secondary of the pulse transformer. If the contact is closed, the diode in an optical isolator is forward biased. This energizes its photo detector, which is a sample-and-hold capacitor.
  • the microprocessor reads the level on the capacitor as low. If the contact is not closed, the optical isolator is idle. The capacitor recharges and is read high.
  • the algorithms contained in the pulse microprocessor are described by the HEX formatted file, PULSE.HEX, in the attached Appendix.
  • the Opto Adaptor converts RS232 into an optical signal that can be read by each meter. This board enables any meter to communicate with any computer through its serial port.
  • An Opto Adaptor schematic diagram can be found in FIG. 16 .
  • U 1 converts RS232 to TTL levels.
  • Q 1 and Q 2 are gain transistors to drive the optical transmit LED 1 .
  • Q 5 is the optical receiver.
  • Q 3 provides gain and Q 4 inhibits the receiver.
  • the Modem Board is so named because its on-board modem permits remote dial-in communication to other devices through different communication schemes.
  • the Modem Board schematic diagram can be found in FIGS. 17 A-B.
  • Each Modem Board is attached to a Mother Board containing an ASIC.
  • Each Modem Board consists of a modem MD 1 , external RS232 (via H 4 ), external RS485 (via H 1 ), and an on-board microprocessor U 10 .
  • the modem, RS232, the Mother Board, microprocessor, and external RS485 all communicate across the R5485 bus by means of TTL/RS485 converters (U 1 -U 8 ).
  • U 11 converts incoming RS232 to TTL levels.
  • U 12 rectifies signal levels for RS485 converter controls.
  • the phone line is connected to RJ 11 . Power into the rectifier and regulator come from H 2 .
  • H 5 is the header that allows factory programming of U 10 .
  • the on-board microprocessor arbitrates Master control and Slave control over these devices.
  • the algorithms contained in the microprocessor are described by the HEX formatted file, MODEM.HEX, in the attached Appendix.
  • the modem board's Auto Hunt feature seeks and adjusts to one of three appropriate baud rates 9600, 19200, and 38400.
  • the meter is calibrated automatically by a fully automatic calibrator.
  • the calibrator (1) can calibrate the meter at 20 points for both amplitude and phase; (2) calibrates each phase of the meter independently; (3) stores calibration constants in the non-volatile flash memory of the Transmeter; and (4) archives calibration records to the manufacturing database.
  • the calibrator is described more fully below.
  • the ASIC The ASIC
  • the ASIC amplifiers sense the level of current and adjust to the level automatically in hardware.
  • the ASIC voltage amplifiers are controlled by the external microprocessor.
  • Late voltage sampling logic and line frequency meter Allows for generation of precise 90° phase shifted waveform for calculation of reactive power and energy.
  • Offset DAC allows for automatic firmware controlled amplifier offset correction.
  • a digital potentiometer with 64 tap points used to digitally calibrate the voltage reference to within 0.1% from an initial accuracy of 5%.
  • a bandpass delta-sigma modulator to convert the analog data to a digital stream.
  • a digitally implemented demodulator unit capable of adjusting gains and demodulating either fsk or bpsk data.
  • a digitally and software implemented data clock that uses the line frequency or a multiple thereof as a common synchronous data clock throughout the system network.
  • the ASIC of a preferred embodiment contains many circuits that control the external devices on the Display Board: (1) a Motorola 68000 bus generator; (2) memory control logic; (3) a real-time clock (RTC); (4) a watchdog timer; (5) 4 kBytes of CMOS battery backed RAM; (6) digital I/O (7) tamper switch detection that continues to operate on battery; and (8) a bootstrap ROM for loading a secondary bootstrap program to internal RAM.
  • Firmware controls many of the above-mentioned features of metering with advanced calibration algorithms, powerline communication protocols, liquid crystal displays, serial data interface. See 28130104.S in the attached Appendix.
  • the firmware provides an Advanced Data Integrity Method by providing a flash memory audit trail for added protection against data loss.
  • the firmware also provides a Data Log of Energy and Event Information, since the audit trail of energy information is commercially valuable under derogation to ESCOs, utilities and end-users.
  • the firmware works with the Calibrator and (optionally) a Toaster (a test apparatus) to calibrate:
  • the ADC Realize 12 bits from an 8 bit limited CMOS process.
  • the firmware also provides Temperature Compensation Methods, since it: (1) uses a temperature diode to calibrate the voltage reference and time clock over temperature; and (2) uses a resistor divider on the voltage reference to calibrate the ADC over temperature.
  • the firmware also provides Self Calibration Methods, since it: (1) calibrates the bandpass filters periodically, and (2) adjusts the offsets in the meter circuits continually.
  • the firmware provides Advanced Metering Parameters, since it:
  • the firmware can also automatically determine the proper range for: (1) Voltage; (2) Current; (3) Powerline signal; and (4) Demodulator parameters.
  • FIG. 18 Configuration of a preferred submeter system is depicted in FIG. 18 .
  • the following is a description of principal modules in the system.
  • a Power Supply 1801 supplies unregulated DC voltage +U for high power functions such as PLC.
  • a regulated +5 VDC feeds each of the ICs and many other circuit blocks.
  • a Battery 1802 provides power for power-out operation of several functions in the ASIC including the Internal RAM A 2 , RTC A 3 , and 32768 Hz crystal 1809 . It also powers the pulse reader when system power is unavailable.
  • Microprocessor U 2 performs all the intelligent computations from the raw meter data and the ASIC states.
  • the main program memory resides in the FLASH U 5 but also run out of RAM and ASIC ROM in some cases.
  • FLASH U 5 is nonvolatile memory, the site of primary memory storage and program memory.
  • RAM U 3 is an IC that is external to the ASIC for microprocessor temporary storage of information.
  • Display Driver U 4 sends the control signals to the LCD LCD 1 .
  • the ASIC U 1 contains the bulk of the control hardware in the submeter system. The control blocks within the ASIC are discussed below.
  • 20M Crystal 1810 is the system clock for both the ASIC and the microprocessor.
  • V REF CR 1 is a 2.5VDC reference voltage. This design utilizes an IC with an external voltage adjustment such as LM336-2.5.
  • the ASIC contains a 64 tap digital potentiometer that provides one of 64 voltage levels to the external control line.
  • the ASIC control of V REF CR 1 saves the cost of a moving part and provides digital code accuracy. Furthermore, because this code can be software-controlled, V REF can be calibrated meter by meter and can be calibrated to fit a parabolic profile with temperature. V REF is calibrated to 2.49V, the voltage point of greatest temperature stability.
  • PLC Hardware 1815 is the power circuitry for the PLC transmit and receive.
  • Peripheral Interface 1818 is the connection point to external devices such as Pulse Relay, Relay Control, Minicloset interface, and transponder phase control circuits.
  • Hardware Test Points 1820 supply the ASIC with information that enables reading of +U, temperature, and ADC calibration. Various test points in the ASIC can be output as well.
  • Optical Reader 1825 is the hardware that translates the serial communication into optical transmission.
  • Voltage Divide 1830 is a 1000:1 voltage divide circuit that prepares measurement voltage for ASIC input.
  • Current Shunt 1835 is a resistor network used to convert current to voltage for ASIC input.
  • a preferred ASIC system U 1 is depicted in FIG. 18 .
  • the following is an explanation of the different modules in the ASIC.
  • Meter A 1 reads the current and voltage channels from Voltage Divide 1830 and Current Shunt 1835 . Internal amplifiers and correction factors improve the accuracy of the meter reading.
  • RAM (Internal) A 2 is non-volatile RAM, backed up by the external battery 1802 . This is the storage site for temporary RAM accumulators and other critical RAM variables.
  • RTC Real Time Clock
  • PLC Control A 4 contains the control logic required to transmit and receive data that was sent through the PLC channels.
  • Digital Control Logic A 5 provides the interface bits that control the enable lines for each part, the address and data busses, system reset, and access to internal state registers.
  • WDT Watchdog Timer
  • Serial UART with FIFO A 7 functions much like the PC16550D from National Semiconductor.
  • Digital I/O A 8 is used for communicating to peripheral devices through the Peripheral Interface 1818 .
  • Analog I/O A 9 is used to gather system information from Hardware Test Points 1820 . This also outputs various analog points within the ASIC.
  • delay is used loosely here because the actual numerical delay can be a positive or negative number. In Table 1, the delay is 0.056°. This number is obtained through calibration.
  • V 1 V L1 V 2 V L1 For each measurement, four voltage samples (V 1 V L1 V 2 V L1 ) and one current sample (I) are taken.
  • V 1 /V L1 is used for phase-to-neutral reading and the V 2 /V L2 pair allows phase-to-phase reading. The difference between the two types will become more evident in the meter diagram discussion.
  • V 1 and V L1 comprise a voltage sample pair. The two samples are placed approximately 2° apart. V 1 is called the Voltage Sample and V L1 is called the Late Voltage Sample.
  • phase 1 is read, then phase 2 is read, then phase 3 is read, then phase 1 is read again. Eventually all the phases are read and the cycle repeats.
  • V 1 (1) and V L1 (3) are 90° apart and therefore complete a measurement pair.
  • V 1 (2)/V L1 (4), V 1 (3)/V L1 (5), and V 1 (4)/V L1 (6) make up future measurement pairs.
  • Table 1 shows the sequences of sampling degrees that would sweep the entire waveform: TABLE 2 V 1 (n) in degrees ⁇ 1 of a 3 ⁇ meter 0, 44, 88, 132, 176, 220, 264, 308, 352, 36, 80, 124, 168, 212, 256, 300, 344, 28, 72, 116, 160, 204, 248, 292, 336, 20, 64, 108, 152, 196, 240, 284, 328, 12, 56, 100, 144, 188, 232, 276, 320, 4, 48, 92, 136, 180, 224, 268, 312, 356, 40, 84, 128, 172, 216, 260, 304, 348, 32, 76, 120, 164, 208, 252, 296, 340, 24, 68, 112, 156, 200, 244, 288,
  • Mini-closets are sampled so that all 24 phases are sampled in about 630 degrees or seven quarter cycles of the oine as shown below in Table 5, Sample Pair Degrees of a Mini-Closet. This implies that each phase sweeps the entire sine wave in 67 line cycles.
  • the meters When the meters are produced, they are capable of measuring voltage, current, KWH, and other parameters. These measurements can have an error of up to plus or minus 15 percent, due to manufacturing tolerances in the electronic components. While the value of this error is not predictable, the error will be extremely stable for a given meter. In other words, a meter which has just been built will not be particularly accurate, but the error will be very repeatable.
  • the calibrator used in a preferred embodiment measures the inherent error of the meter, then instructs the meter's onboard processor to correct the measured error.
  • the meter stores these correction factors in its non-volatile memory, resulting in readings that are both accurate and stable.
  • the calibrator comprises a computer and auxiliary equipment.
  • the calibrator is preferably capable of supplying AC voltages between 0 and 600 volts, and AC currents between 0 and 210 amps.
  • the phase angle theta ( ⁇ ) between the voltage and the current is adjustable from ⁇ 90 to +90 degrees.
  • the frequency of the AC power can be either 50 or 60 hertz.
  • the calibrator communicates with the meter using the meter's built-in optical communications port, and uses standard measurement devices to measure the actual correct value of the parameters being adjusted. For voltages, the calibrator uses a digital voltmeter (DVM) to obtain the actual values. For KWH, the calibrator uses a Radian KWH standard to measure the KWH to 0.05 percent accuracy.
  • DVM digital voltmeter
  • Voltage reference calibration The output voltage of the voltage reference is adjusted by the calibrator to an initial value chosen to provide the most stable output voltage. This is accomplished by reading the actual value of the voltage reference using a DVM. The meter is then instructed to set the value of a digitally-controlled potentiometer (within the ASIC in the preferred embodiment) that adjusts the output voltage of the voltage reference. The calibrator then repeats this process until the voltage reference is set to the correct nominal output voltage (in a preferred embodiment, this is 2.490 Volts).
  • ADC linearity calibration the meter uses an ADC inside the ASIC to read the voltage, current, and other analog values needed by the measurement algorithm of the meter.
  • this ADC may be non-monotonic at high-order bit transitions.
  • the ASIC provides for individual adjustment of the weight of the 5 high-order bits in the ADC, allowing calibration to guaranteed monotonicity.
  • the calibrator uses a DVM to measure values just above and below these bit transitions, and adjusts the weight of each bit in order to get a monotonic response. These adjustments are performed by the meter's firmware, which writes correction values into registers in the ASIC. When the proper correction values have been found, the calibrator instructs the meter to store these values permanently in the non-volatile memory.
  • V REF and ADC temperature drift calibration the voltage reference and the ADC are both affected by temperature changes experienced by the ASIC. This results in an error which varies with temperature.
  • the calibrator measures the performance of the voltage reference and the ADC at 3 different temperatures (room temperature, 5° C., and 85° C.). The effect of temperature is then communicated to the meter's firmware. In operation, the meter reads its ambient temperature, then uses the temperature calibration information to correct for the effects of temperature on the ADC and voltage reference.
  • Voltage calibration the meter must measure AC RMS voltage. The accuracy of the measurement is affected by the factors listed above (in “sources of error”).
  • the meter has 4 different measurement ranges for voltage. In the present meter, these ranges are: (1) Range 3—0 to 75 volts; (2) Range 2—75 to 150 volts; (3) Range 1—150 to 300 volts and (4) Range 0—300 to 600 volts.
  • the different ranges use different internal configurations of the ASIC, resulting in different gains in the signal presented to the ADC. Each of these gain settings may have a different error.
  • the calibrator supplies the meter with an AC voltage which is appropriate for that range.
  • the calibrator then reads the voltage applied to the meter using a DVM, and also reads the voltage as measured by the meter. The difference in these readings is analyzed, and a correction factor is calculated and sent to the meter. For each range, this process is repeated until the meter and the DVM measurements agree.
  • the value of the correction factor (the Voltage Calibration Constant) is then permanently stored in the non-volatile memory of the meter.
  • KWH calibration the meter must measure energy in KWH. In order to do this accurately, the external quantities of voltage and current must be accurately measured so that KWH can be calculated. The KWH measurement depends on the value of the voltage and the current, and the timing relationship between the voltage and the current.
  • the equation for KWH is Volts*Amps*Cos(Theta)*Hours, where Theta is the phase angle between the voltage and the current. The meter performs this measurement by sampling the voltage and the current simultaneously, then processing these instantaneous values.
  • the meter has 20 ranges for current, from range 23 at 0.5 amps to range 4 at 100 amps. For each range, the internal configuration of the ASIC amplifiers is different, and the CT introduces current-dependent errors in both amplitude and delay. Therefore, the calibrator repeats the KWH calibration for each range.
  • Amplitude compensation any error in the actual value measured for voltage and current is compensated for by using an “Amplitude” (A) calibration constant. This constant is a factor by which the readings are multiplied, to make the measured value correct.
  • Delay compensation the time relationship between the voltage and the current signals may be incorrect due to amplifier characteristics in the ASIC, or due to the characteristics of the current transformers (CTs).
  • CTs current transformers
  • the CTs introduce a current-dependent phase shift which becomes greater and greater at low currents. This results in the current signal not being properly synchronized with the voltage signal. This error results in errors in the KWH measurement due to the change in theta caused by this time shift.
  • KWH calibration algorithm for each of the 20 current ranges, the calibrator sets up a specified voltage and current. This voltage and current are supplied to the meter being calibrated, and also to a KWH standard (Radian RM-10, ⁇ 0.05%).
  • the calibrator cannot directly measure the quantities that it needs to communicate to the meter (amplitude and delay error). Instead, the calibrator measures the actual error in KWH registration. This error is caused by the combination of the amplitude error and the delay error.
  • the calibrator does this measurement by supplying the specified current and voltage to the meter and to the standard, then measuring the accumulated KWH for a specified time interval. The difference between the standard and the meter measurements is the KWH error.
  • the calibrator performs the KWH test twice.
  • theta is set to 60 degrees, and the KWH error is measured and saved. Then, the test is repeated at 0 degrees.
  • the calibrator can solve for the 2 independent error sources (amplitude and delay).
  • the calibrator After the calibrator does these measurements and makes these calculations, the calibrator instructs the meter to compensate for these errors.
  • Interval metering stores independent records of metering data for future recall. Electrical parameters are continuously accumulated into battery-backed RAM and then periodically stored to non-volatile FLASH memory. For example, if the metering interval were set to 30 minutes, there would be 48 records of data in the day. Table 6 below, illustrating interval storage, is an example of data storage using Interval Metering. Interval Metering can be particularly useful in calculating billing demand.
  • Interval Metering offers more frequent data records, which is useful in demand billing calculations and Theft Detection. But more important, Interval Metering in conjunction with FLASH memory provides protection from data corruption. In the past, switching a very high-current inductive load created an enormous transient on the line, destroying the RAM data. In other cases, RAM has also been found to corrupt in the presence of EMI sources such as toy transmitters.
  • FLASH is a far more reliable memory because, it requires a sequence of commands for any data modification and does not require a power source for data retention.
  • FIG. 19 shows how electrical parameters are accumulated in preferred software.
  • the first register iAcc[0] becomes active. After a short period of time, this register is available to be dumped into RAM register curph. While waiting for this transfer, iAcc[0] ceases to accumulate and iAcc[1] is cleared and begins active accumulation. When iAcc[1] is ready for transfer, iAcc[1] becomes inactive and iAcc[0] is cleared and begins to accumulate. This enables seamless accumulation and periodic dumping to curph in RAM.
  • the electrical parameters are then stored to FLASH. After successful storage to FLASH, the RAM register is cleared and begins to accumulate for the next interval.
  • the overall Meter Hardware is depicted in FIG. 20 .
  • the upper portion shows the voltage channel and the lower portion the current channel. Both voltage and current are fed through their own gain stages and are selected through MUX M 6 for the ADC.
  • Voltage channel—MUX M 1 and MUX M 2 independently select between V1, V2, V3, and N.
  • the signal through the amplifier A 1 is phase-to-neutral.
  • the signal through the amplifier A 2 is a differential (or delta) voltage between the two signals that were selected from MUX M 1 and MUX M 2 , the delta voltage V 2 .
  • Each of these voltages pass through two sample and hold circuits, creating the late voltage V L . From the four sample and holds emerge: V 1 , V L1 , V 2 , V L2 .
  • Amplifiers A 1 and A 2 have adjustable gains. Because A 2 is intended for higher delta voltage, its gains are half of A 1 .
  • the gain setting corresponds to a particular range of voltage amplitudes that will obtain optimal readable scale after amplification. There are four voltage ranges, 0 through 3.
  • MUX M 3 selects between 4 signal pairs: I 1 /N 1 , I 2 /N 2 , I 3 /N 3 , and V REF /V REF .
  • the signal passes through amplifier A 3 , is selected by MUX M 4 and passes through a series of amplifiers A 4 -A 8 .
  • Offset control Small offset voltage in amplifier A 3 could saturate the current channel at higher ranges, making current unreadable. To null any offset, the output offset is dynamically monitored and adjusted in amplifier A 4 .
  • ADC Temperature Calibration Because there is temperature variation with the ADC, the ADC is calibrated with temperature against the temperature sensing diode. The result is a best fit curve that can be applied to the final data in software.
  • PLC Power Line Communication
  • Frequency Shift Keying (FSK) and Phase Shift Keying (PSK).
  • PSK Phase Shift Keying
  • the Baud Clock is synchronized to the line phase by means of a Phase-locked Loop (PLL).
  • PLL Phase-locked Loop
  • the PLL is jointly implemented in software and hardware. By knowing the zero phase crossings from the PLL, the actual data rate can be synchronized to fractions or multiples of the line frequency.
  • PLC Receiver The PLC receive circuitry as found in the ASIC is shown in FIG. 21 .
  • M 2 channels the PLC input into the filter.
  • the filter rejects out-of-band noise and couples the signal into the demodulator.
  • the PLC filter is designed as a continuous time domain filter. Its advantage over switched capacitor filters is to achieve higher Q and lower internal noise level in the operating frequency band.
  • the high Q is essential because a bandpass effect is created from a lowpass, high Q design with attenuation.
  • the attenuation compensates for high gain at the peak frequency of the LPF.
  • the attenuation provides the low frequency rejection.
  • a true bandpass filter can also be used as well.
  • the filter is tunable to frequencies from 20-90 kHz. The filter also compensates for variation due to components and temperature variation.
  • the overall filter is frequency-tuned with the Coarse Adjustment Register.
  • the proper setting places the filter in the vicinity of the desired value.
  • the entire filter is comprised of four filter stages, with the attenuation control spread over the four stages. These four stages need to be aligned to the desired frequency.
  • Fine Adjust registers F 1 -F 4 enable frequency tuning of each stage while Attenuation registers A 1 -A 4 enable amplitude tuning or each stage. Together, these adjustments calibrate out any discrepancies between stages.
  • Each filter stage is preferably implemented as a two-pole lowpass filter with two external capacitors.
  • a preferred filter is shown in FIG. 22 .
  • Filter alignment is the process of tuning the corner frequencies of each of the four filter stages to the desired frequency by means of phase shift detection.
  • the alignment process injects a test signal with a Square Wave Generator U 2 .
  • U 2 also outputs the phase of the square wave to be latched in by a Phase Shift Detector U 1 .
  • the microprocessor selects the desired frequency for U 2 and routes the square wave through M 2 to the input to filter. This square wave signal passes into all four stages of the filter.
  • the microprocessor selects the filter stage output to pass through M 1 .
  • the signal undergoes phase shift in the filter stages and its rising edge becomes the latch clock for U 1 , latching across the phase difference between the filtered signal and the test signal.
  • the phase at the corner frequency is 90°.
  • the ADC monitors the signal strength of the PLC signal to adjust attenuators A 1 -A 4 for adequate clocking of the phase capture latch.
  • the following is the filter alignment process:
  • Tune Stage 1 (A) start with Fine Adjust 1 at the midpoint; (B) modify Attenuator 1 for valid signal strength; (C) check filter phase; (D) change Fine Adjust in the direction that leads the filter phase to 90° (a binary search algorithm is suggested); and (E) repeat (B) to (D) until filter phase is 90°.
  • Stage 2 seeks a 180° difference
  • Stage 3 seeks a 270° difference
  • Stage 4 seeks a 0° difference.
  • the filtered signal enters the demodulator circuit.
  • the digital demodulator uses a digital phase lock loop to identify the binary data stream.
  • a preferred embodiment uses ASIC control circuitry to control the PLC transmitter. There are two outputs that can be driven in parallel or opposite, depending on whether the design is for a bridge circuit or for a single-ended circuit.
  • a preferred transmitter circuit is found in the 10 series schematic drawing in FIG. 11A . Because the switching time differs between off and on, there is some overlapping period of time when both Q 2 and Q 3 are both active. This overlap short-circuits the power supply through Q 2 and Q 3 for a brief moment creating transition heat.
  • the hardware can be designed so that neither Q 2 nor Q 3 will be active at the same time. This is illustrated in Table 7, which lists a Transistor Switching Sequence.
  • the interval when both Q 2 and Q 3 are off is called Dead Space.
  • Dead Space is some benefits: (1) transition heat of the Q 2 and Q 3 is reduced or eliminated; and (2) output transmitter wave shape becomes more sinusoidal, and therefore reduces harmonic injection to the line. The dead zone makes the transition step more gradual at the edges.
  • Dead Space can be implemented in ASIC hardware or in discrete circuitry.
  • the ASIC can use a binary counter and specify certain count states as “off” states.
  • Discrete circuitry can be designed so that the base drive has a delayed turn on but synchronized turn-off.
  • the overall design of the transmitter circuit is to drive a toroid coil using a transistor bridge circuit using transistors Q 2 , Q 3 , Q 4 , and Q 5 .
  • the control signals are PLCX 1 and PLCX 2 .
  • Capacitor C 9 provides AC coupling between the transistor base and the control signal.
  • the AC coupling also reduces transition heat. In the absence of Dead Space hardware, the AC coupling reduces transition heat by forcing a faster switch off time for Q 2 and Q 3 .
  • PLCX 1 transitions from high to low, the opposite side of C 9 transitions below ground. This negative voltage is impressed upon the base of Q 2 through D 28 . Charge is pulled out of the base of Q 2 making the switch off far more rapid.
  • C 4 , C 5 , C 6 , and L 3 also act as an LC filter.
  • a larger capacitance and smaller inductance is used.
  • smaller capacitance and larger inductance is used.
  • another capacitor can be placed at the CV/CN inputs. This offers yet another pole of filtering, if desired.
  • This part can be mounted on the PCB or placed in the wiring harness.
  • the Pulse Circuit controls external relays and counts contact closures. External relay control gives the utilities access to external events such as turning off power to the house or controlling other appliances. Contact closure reading enables other metering quantities such as gas and water to be monitored.
  • the Pulse Circuit monitors these quantities in the absence of electric service. Normally, all services (such as gas, water and electricity) are active. Because of a battery-backed supply, gas and water are still accurately monitored in the absence of electric service. The circuit is shown in the central portion of FIG. 11A .
  • the contact points are isolated from the main circuit through optical isolators and a pulse transformer.
  • a remote microprocessor U 4 polls the contact closures through a pulse transformer. Any contacts that are closed will activate the corresponding optical isolator (OPT 3 -OPT 6 ) and shorts out the capacitors (C 11 -C 14 ).
  • the microprocessor reads the voltage on these capacitors to know which contacts were closed.
  • the pulse circuit is normally powered by +5VDC (through D 5 ). But when +5VDC is not available, the battery supply (through D 8 ) becomes the power supply of the pulse circuit. Because the minimum required voltage of the microprocessor is very close to the system battery voltage, care is preferably taken to maximize supply voltage.
  • a schottky diode (D 8 ) is used to minimize drop.
  • a separate power feed (D 6 and D 7 ) is used to power the pulse charger, whose voltage is held by C 19 . This capacitor is charged through a current limiting resistor R 52 to minimize voltage dips due to battery resistance.
  • C 19 dumps charge into the pulse transformer, thereby providing the interrogating voltage.
  • the Pulse Circuit also outputs relay control through OPTA and OPTB.
  • An optical triac, optical dry contact output, or +5VDC output are optional output controllers.
  • the microprocessor performs serial communication with the ASIC by means of the lines PO 2 , PO 1 , and PI 1 .
  • the main processor therefore has access to each of the accumulator registers and has control of the output relay channels.
  • FIG. 17C shows a schematic of a preferred pulse expansion circuit.
  • the input circuits are duplicated three times on the board for expanded metering capability.
  • diodes D 17 , D 19 , and D 21 serve to uniquely identify position. This allows all 12 inputs to be unique.
  • four pulse boards can be serially chained to create 48 independent inputs. To distinguish the four boards, jumpers are placed in H 2 , H 3 , H 4 , and H 5 for the processor to identify.
  • the KYZ circuit provides an equivalent dry contact closure that can handle 120VAC at the input. To prevent any momentary short circuits across the terminals Y and Z, circuitry enforces a dead period between transitions.
  • FIG. 11B provides a KYZ schematic diagram.
  • the metering quantity is output through the LED signal and buffered through U 2 C.
  • This waveform passes through an RC filter which slopes the edges of the square signal.
  • This signal passes to comparators U 2 A and U 2 B. Only when the signal has traveled above 4.5V will U 2 B trigger causing Y to contact K. Only when the signal has traveled below 0.5V will U 2 A trigger causing Z to contact K. In the 0.5V to 4.5V zone, no contact is made, thereby enforcing the dead period and preventing momentary short circuits.
  • the Minicloset(MC) monitors a mass number of electrical metering points, saving cost and space. The price per metering point is much cheaper. Also in high-rise installations, often entire rooms are required in order to hold all the electrical meters. Because of the compact design of the MC, only a small closet is required for all the metering points. This frees up for building management extra rooms that would have otherwise been allocated for meter mounting.
  • the 5A minicloset (MC) preferably monitors 24 metering points from one device. With internal 5A to 0.1A current transformers, the MC receives current as high as 5A. The MC also utilizes Internal Metering and stores its data in FLASH memory.
  • the schematic diagram of the minicloset interface (MCI) board is shown in FIGS. 15B and 15C .
  • the main processor communicates to a remote microprocessor U 1 and specifies which current channels to read.
  • U 1 controls the analog multiplexer (U 2 -U 7 ) and gates in the desired CT outputs to the current sensing circuit.
  • the MC can also monitor higher current levels if external CTs are used to step down the current.
  • a Scan Transponder (ST) is used to communicate to each of the meters in a PLC system to collect data.
  • the Transponder Power Board Circuit can be found in FIG. 11A .
  • the transponder consists of four PLC communication channels: three channels to communicate along the three phases of the distribution transformer and a fourth phase to communicate along a medium tension line.
  • the main processor communicates to the remote processor U 1 through PO 1 , PO 2 , and PI 1 to control the gating of the transmitters and the receivers.
  • the Scan Transponder collects data from the meters by sequentially polling each meter on a scheduled basis and copying the data to its memory.
  • the ST can be optionally equipped with a large memory display board.
  • the transponder can monitor electricity as well (i.e., function as an end user meter).
  • the transponder has the ability to store additional data with an optional larger FLASH memory display board.
  • the transponder can also periodically dump data to an even larger memory source such as a personal computer by means of a modem or a serial connection.
  • the ST requires that the serial numbers of each meter be cross referenced in its memory. This enables the ST to identify any meter in its cross reference table that is non-communicating.
  • the ST also seeks optimal transfer by searching all phase, speed, and modulation combinations.
  • FIG. 16 An Optical Reader circuit is shown in FIG. 16 .
  • This circuit is designed for a battery source.
  • the design uses a two stage constant current source to provide increased communication rate with transistor circuitry (Q 1 and Q 2 ).
  • a theft detection embodiment of the present invention is based on the hypothesis that theft is not evenly spread among end users. Instead, there are probably some customers who steal 50% of their energy, some who steal 100%, and many who do not steal at all.
  • Each distribution transformer in a power distribution network can easily supply energy to hundreds of customers.
  • Theft detection meters are preferably placed at strategic points to narrow the theft detection zone in the following ways: (1) based on the population of end users—to pinpoint known customers who are stealing; and (2) geographical area—to narrow the search area for illegal tapping.
  • a non-paying customer with average usage represents only a 0.3% variation in the total energy. Narrowing the theft detection zone increases the detection sensitivity. If 20 equal zones are monitored, the 0.3% variation suddenly registers as a 6% variation in one theft detection zone.
  • the distribution transformer in FIG. 23 has twelve monitoring points coming from the four feeders and each of the three phases.
  • the meters M 1 -M 4 that monitor these points and are called Feeder Meters. By metering these 12 points, the theft detection zone reduces to 1/12 of the original metering points.
  • Node Meters M 5 , M 6 , M 7 , and M 8 further section the North branch into more detection zones. If all four feeders were sectioned into just three zones, there would be 36 different detection regions, sectioning 300 customers into 8 or 9 customer portions. For example, theft is determined in Zone 1 if energy theft is detected in M 1 but not M 5 and M 6 .
  • a three phase (3 ⁇ ) customer is treated as a customer with three 1 ⁇ services. This isolates the energy measurement cleanly between the phases. But for the sake of accurate demand billing, 3 ⁇ customers must be 3 ⁇ metered. If separate phases achieved equal peak demand but in non-coincident demand intervals, the customer who was billed as three 1 ⁇ could be overcharged for demand.
  • a preferred 3 ⁇ meter is capable of being read either as three 1 ⁇ meters or one 3 ⁇ meter, thereby satisfying both conditions.
  • a minicloset can be considered as twenty-four 1 ⁇ meters and a 2 ⁇ meter can be considered as two 1 ⁇ as well. This enables the Theft Detection system to work with customers of 1 ⁇ , 2 ⁇ , and 3 ⁇ meters and of 24 ⁇ Mini-closets, including any combination of such customers.
  • a transponder T located at the distribution transformer, gathers meter data from all Feeder Meters P F , Node Meters P N , and the End User Meters.
  • This system accomplishes the following: (1) isolation of theft location to a very small circuit branch; and (2) isolation of theft instance in time.
  • Isolation of theft location comprises the following steps:
  • Isolation of theft instance in time Using interval metering, theft detection can be applied to each metering interval to isolate the theft instance. The precision of time identification is determined by the metering interval.
  • Theft network mapping theft detection requires a network map of all meters interconnections. However since an accurate electrical routing diagram from the distribution transformer is not always available, there is need for a mapping scheme.
  • a Theft Detection Mapping System of a preferred embodiment performs the following tasks: (1) stores data identifying all Feeder, Node, and End User Meters; (2) associates End User Meters to Node branch and Feeder Meters; and (3) identifies the phase arrangement of multi-phase meters. For example, in a three-phase meter, phase 1 of the distribution transformer output might not be connected to phase 1 of the meter. This too needs to be recorded in the network map.
  • the network mapping system does not have to be included in the permanent installation. After mapping is done, the transponder remembers the position of all of the meters, and the mapping system can be recycled to map other distribution transformers.
  • a personal computer (PC 1 ) is preferably the master controller of the mapping process. Inductive couplers are place on feeder wires and node wires to identify return PLC signal strength. The outputs of these inductors are multiplexed (under control of PC 1 ) through a sharp bandpass filter and into a DVM (such as HP34401A). PC 1 reads the signal level from the DVM through the IEEE bus.
  • PC 1 instructs the transponder to gather the serial numbers of all meters that exist on the network.
  • the transponder sequentially requests an echo from the active meters on all three phases.
  • a meter receives the request from the transponder, it sends back its serial number to the transponder.
  • End user meter (phase) mapping 1 ⁇ meter—The phase that the transponder reads with the greatest signal strength is metering phase of this meter. Alternatively, the phase can be determined in another way. The bit rate must be set equal to the line frequency. Because of phase lock, the bit transitions occur at the zero crossings of the line voltage. If the return signal from the meter has zero-crossings with the transponder metering phases, then the meter is said to be on transponder phase A (T ⁇ A). If there is a +120° shift, it is said to be on transponder phase B (T ⁇ B). And the remaining phase is transponder phase C (T ⁇ C).
  • 3 ⁇ meter Because Phase 1 of the meter might not be connected to Phase 1 of its Node Meter, mapping is required to identify phase arrangement.
  • the transponder sends out a PLC signal with the bit rate equaling the line frequency. But this time it is the 3 ⁇ meter that compares the PLC bit-transitions to the zero crossings of each of their metering phases. From these comparisons, the meter determines which metering phases are connected to T ⁇ A, T ⁇ B, and T ⁇ C.
  • the Node Meter repeats the process to identify the phase mapping relationship. These relationships are transmitted back to the transponder to correlate the phases of the Node meters with its 3 ⁇ meter.
  • Feeder mapping PC 1 communicates to the transponder through its optical port to instruct a meter to send a 30-second message.
  • the computer PC 1 polls each of the couplers for signal strength. The coupler with the strongest signal indicates feeder position.
  • Node mapping Starting at the farthest node meters, couplers are placed at these meters and checked for signal strength returning from the meter. If a signal is not present, couplers are moved down one node at a time and are again tested for return signal strength. The process repeats until all nodes are mapped.
  • mapping the locations of meters is used to locate line breakages.
  • This embodiment comprises a method of determining the location of a break in a powerline electricity distribution network that has microprocessor-controlled end user electricity meters operative to communicate with a remotely located computer. The method comprises the steps of: (1) mapping the location of each end user meter; (2) periodically receiving data from each end user meter in response to a query to that meter; (3) when a plurality of meters in the same branch of the network fail to report during a given period, querying meters in neighboring branches to pinpoint the location of a break.
  • Such queries used in conjunction with the network map, will locate the break (at least to the resolution provided by the locations of the query-able meters) in a few seconds, thus reducing the time typically required to find a break by having line repair personnel visually inspect the lines until the break is spotted.
  • a personal computer is connected to a Scan Transponder and issues commands to the ST to continuously sequentially poll each meter for an echo.
  • the ST correlates the serial numbers of these meters on an electrical distribution map (obtained by the Theft Detection mapping scheme, for example). If the non-communicating meters lie on the same distribution path, the PC hypothesizes that there is power line breakage at the point on the map where the meters fail to communicate.
  • a single meter can monitor consumption from two or more sources—for example, a utility and a local generator—and store the data into separate corresponding sets of data registers.
  • a logical control signal line from the ATS is connected to the meter.
  • the meter stores metering data into a first set of data registers.
  • the control line from the ATS triggers the meter to store metering data into a second set of data registers.
  • Credit and Prepay meters of a preferred embodiment address the problems with present credit and prepay systems. No operator is needed to enter the house since all transactions are performed by PLC. Fraud-prone swipe cards are not needed since a remote utility operator handles the energy purchase and deposits the amount to the meter by PLC.
  • Prepay Meters In a prepay embodiment of a preferred system, energy is purchased by an end user customer from a system operator (typically, a utility operator) in advance. The operator deposits the purchased energy to the customer's meter by PLC. When the customer has reached his prepaid limit, the meter cuts power to the household.
  • the LCD display preferably alternates (i.e., displays each for a pre-defined period, then displays another) between the following displays, for example: (1) “Deposit $50 01/23/01”; (2) “Remaining $23.45” (present amount remaining); and (3) “Estimated Cutoff 11:43 02/28/01” (based on present consumption).
  • an operator also, when desired, remotely programs meters to cut off power when certain parameters are met or exceeded. For example, a customer with inferior credit may have his power temporarily discontinued when he uses 10 amps, when he uses 5 amps, or when his allotted consumption level is exceeded.
  • remotely programs meters to cut off power when certain parameters are met or exceeded. For example, a customer with inferior credit may have his power temporarily discontinued when he uses 10 amps, when he uses 5 amps, or when his allotted consumption level is exceeded.
  • submeters are equipped with printers.
  • the utility still polls the meters for data through PLC and therefore has control over billing information.
  • the utility calculates the bill and data is downloaded to the meter for local printing. Since the local printer is under utility control, the utility can initiate the printing of other messages through PLC as well. Such other messages may include billing receipts, rate changes, and usage profiles.
  • This embodiment allows a utility to inexpensively disconnect a customer by taking advantage of an existing Ground Fault Interrupt (GFI) capable of interrupting power to the customer.
  • GFI Ground Fault Interrupt
  • the GFI is a protective circuit that shuts down power during anomalous current flow.
  • the utility wants to remove service to a customer, the utility sends a PLC signal to the meter. The meter then activates the GFI with onboard circuitry.
  • the utility may want to deactivate customers for demand-side management applications or when customers fail to pay their bills.
  • the meter preferably trips the GFI (see FIG. 25 ) either by (1) initiating a small leakage to earth ground, or (2) coupling a small amount of current into the GFI toroid.

Abstract

The present invention comprises systems and methods related to monitoring of energy usage on a power line. In a preferred embodiment, this system comprises (a) an electronic microprocessor-controlled digital electricity metering device coupled to the power line and comprising a non-volatile non-battery-powered data-storage device, wherein the metering device is capable of interval metering and of receiving a data request and transmitting data in response to the request over the power line; and (b) a data collector (preferably, a transponder) coupled to the metering device via the power line. The data collector is preferably capable of (i) receiving data from and transmitting data to the metering device over the power line, (ii) storing data received from the metering device over the power line, and (iii) receiving data from and transmitting data to a remotely located computer (preferably, a billing computer).

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a divisional application of U.S. patent application Ser. No. 09/795,838, filed Feb. 28, 2001, which claims the benefit of U.S. Provisional Application No. 60/185,832, filed Feb. 29, 2000. The entire contents of each of the above-referenced applications are incorporated herein by reference.
  • FIELD OF THE INVENTION
  • The present invention relates to metering of and billing for electric power consumption, and has particular application to solid state electricity meters and powerline communication with such meters.
  • BACKGROUND
  • Submetering is the resale of electricity or allocation of costs within a multi-tenant property. Master metered apartments are units of a multi-tenant residential building without individual electric meters; the cost of electricity for each apartment is included in the rent for that apartment. Because tenants of such units typically consume up to 30% more electricity than tenants who pay a separate bill for energy consumed, there is a demand for submetering of such units.
  • Systems and methods for submetering are known. One such system is disclosed in U.S. Pat. No. 4,783,748, issued Nov. 8, 1988, to Swarztrauber et al. In that system, as disclosed in the patent and as developed through 1999, the submeter (known as a Transmeter®) measures electricity by connecting to the power wires to measure voltage and through current transformers to measure current. The initial Transmeters®, manufactured from 1982 through 1991, processed the voltage and current in digital form to derive the real energy. In a development effort that spanned the period from 1988 through 1992, additional parameters were added. The Transmeters manufactured from 1992 through 1999 calculate from the measured voltage and current additional parameters such as reactive and apparent energy, power factor, total harmonic distortion, peak demand, time-of-use, voltage and current. They also stored the information CMOS ram backed up by battery to maintain an audit trail of key energy information either every day or every 15 minutes. This type of memory storage can suffer data loss through power and battery failure, data corruption due to “fast transients”—a type of interference commonly found on power lines.
  • The Transmeter® systems manufactured and sold through 1999 collect and deliver information from Transmeters® located in multi-tenant properties. The individual Transmeters® inject signals onto the power distribution lines (a technique known as power line communication, or “PLC”) in the multi-tenant property to a more centrally located device, the Transponder. The Transponder is typically installed at the point of entry of electricity to that property. If the property has more than one electrical service, one Transponder is installed per service. The Transponders are interconnected via an RS-485 network. One of the Transponders connects by modem to a dedicated standard telephone line.
  • The billing computer is configured to dial any property on command of the operator. The data is processed by standard spreadsheet or database programs to generate bills in either paper or machine-readable format for use by the property management companies.
  • However, such systems have a number of deficiencies. One deficiency is cost: units that are too costly will not be utilized in areas where the profit margins are too small or there is a relatively high probability of theft. Another deficiency shared by many systems is that the meters communicate with a central billing office via telephone lines, thus requiring additional installation of wires in the building, or at least requiring that telephone lines be located near the power lines.
  • The submetering market has several requirements that often fail to be met by existing submetering systems. Such requirements include: (1) stringent metering standards found outside the United States such as those of Industry Canada and the International Electrotechnical Commission (a European standards organization with applicability to most of the world outside of North America). Not only must a submeter meet electrical standards, it must comply with strict mechanical standards as well.
  • (2) Communication with the submeter is required outside of densely populated urban areas, where electrical distribution transformers are not necessarily located near phone lines.
  • (3) There is an emerging need of electric utilities to provide on-line metering databases over the Internet. This need also includes providing this information to generation companies or Energy Service Companies (ESCOs) often located very distant from the customer. Such entities require delivery of information not available with standard electro-mechanical meters.
  • (4) Low-cost, high-volume manufacture.
  • SUMMARY
  • In one aspect, the present invention comprises a system for monitoring energy usage on a power line. Preferably, this system comprises (a) an electronic microprocessor-controlled digital electricity metering device connected to the power line and comprising a non-volatile non-battery-powered data-storage device, wherein the metering device is capable of interval metering and of receiving a data request and transmitting data in response to the request over the power line; and (b) a data collector (preferably, a transponder) connected to the metering device via the power line. The data collector is preferably capable of (i) receiving data from and transmitting data to the metering device over the power line, (ii) storing data received from the metering device over the power line, and (iii) receiving data from and transmitting data to a remotely located computer (preferably, a billing computer).
  • In another aspect, the present invention comprises a system for monitoring energy usage, comprising: (a) one or more power lines; and (b) an electronic microprocessor-controlled digital electricity metering device connected to the power lines and comprising at least one non-volatile non-battery-powered data-storage device. Preferably, the metering device is capable of interval metering and of metering multiple billing entities.
  • In another aspect, the present invention comprises a power line communication system for communication between a master device and a slave device, comprising: (a) a master device connected to a power line and capable of transmitting a request for data over the power line to a slave device and of receiving data transmitted by the slave device over the power line, wherein the master device is capable of transmitting a request for data over the power line to the slave device that is at a frequency low enough to ensure reliable reception by the slave device, and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within specific transmission parameters; and (b) a slave device connected to the power line and capable of transmitting data over the power line in response to a request for data received over the power line from a master device, wherein the slave device is capable of transmitting data over the power line within the specific transmission parameters.
  • In a further aspect, the present invention comprises a method of monitoring energy usage, comprising the steps of: (a) measuring energy usage using a microprocessor-controlled digital electricity metering device; (b) storing data representing measured energy usage at regular intervals of time in a non-volatile, non-battery-operated data storage device; (c) receiving a request for the stored data over a power line from a remotely located computer (preferably, a billing computer); and (d) in response to that request, transmitting the stored data over the power line to the remotely located computer.
  • In another aspect, the present invention comprises a method of power line communication between a master device and a slave device, comprising the steps of: (a) transmitting a request for data over a power line from a master device to a slave device, wherein the request is at a frequency low enough to ensure reliable reception by the slave device (preferably, a transponder hunts between two or more channels to avoid narrow band noise and transmits the request at a data rate (baud rate) low enough to ensure reliable reception by the slave device), and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within a first set of specific transmission parameters; and (b) transmitting responsive data over the power line from the slave device to the master device in response to the request for data received by the slave device over the power line from the master device, wherein the responsive data is transmitted over the power line within the first set of specific transmission parameters. This method, when the situation requires, further comprises the steps of: (c) after a pre-determined period of time during which the master device has not received responsive data of acceptable quality from the slave device transmitted within the first set of specific transmission parameters, transmitting a subsequent request for data over the power line from the master device to the slave device, wherein the request is at a frequency low enough to ensure reliable reception by the slave device (again, preferably a transponder hunts between two or more channels to avoid narrow band noise and transmits the request at a data rate (baud rate) low enough to ensure reliable reception by the slave device), and wherein the request for data comprises instructions to the slave device to transmit responsive data over the power line within a second set of specific transmission parameters; and (d) transmitting responsive data over the power line from the slave device to the master device in response to the subsequent request for data received by the slave device over the power line from the master device, wherein the responsive data is transmitted over the power line within the second set of specific transmission parameters.
  • In still another aspect, the present invention comprises an application specific integrated circuit (ASIC) for monitoring energy usage, comprising: (a) a meter component; (b) a digital control logic component; (c) a real-time clock component; and (d) a power line communication component.
  • In a further aspect, the present invention comprises a device for monitoring energy usage, comprising: (a) an application specific integrated circuit (ASIC) chip connected to and capable of being controlled by a microprocessor; (b) a microprocessor connected to the ASIC chip and capable of controlling the operation of the ASIC chip; and (c) a flash memory device connected to the ASIC chip and to the microprocessor, wherein the flash memory device is capable of receiving energy usage data from the ASIC chip and capable of being controlled by the microprocessor.
  • Other aspects of the present invention will be apparent to those skilled in the art upon reviewing the following detailed description, attached drawings, and appended claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an overall installation diagram for a preferred embodiment of the present invention.
  • FIG. 2 is an installation diagram for a slave transponder.
  • FIG. 3 is a substation installation diagram of a master transponder.
  • FIG. 4 is an aerial transformer and coupling diagram.
  • FIG. 5 is a phase-to-phase inductive pad mount coupler diagram.
  • FIG. 6 is a signal transformer assembly diagram.
  • FIG. 7 is a concentrator/signal unit diagram.
  • FIG. 8 is a master and slave transponder power adapter diagram.
  • FIGS. 9A-B and 10 provide a Display Board schematic diagram.
  • FIG. 11A provides a 10 series preferred embodiment power board schematic diagram.
  • FIG. 11B provides a KYZ schematic diagram.
  • FIG. 11C is a 20 series preferred embodiment power board schematic diagram.
  • FIGS. 12A-C, 13, 14, and 15A provide a Transponder schematic diagram.
  • FIGS. 15B-C provide a Mini Closet Interface schematic diagram.
  • FIG. 16 is an Optical Adaptor schematic diagram.
  • FIGS. 17A-B is a Modem Board schematic diagram.
  • FIG. 17C shows a schematic of the pulse expansion circuit.
  • FIG. 18 depicts a configuration of a preferred submeter system.
  • FIG. 19 shows how electrical parameters are accumulated in preferred software.
  • FIG. 20 depicts overall meter hardware of a preferred embodiment.
  • FIG. 21 depicts preferred PLC receive circuitry for an ASIC.
  • FIG. 22 is a diagram of a preferred two-pole lowpass filter used in an ASIC.
  • FIG. 23 depicts a preferred embodiment of the present invention used to address electricity theft.
  • FIG. 24 depicts a system configuration for preferred embodiment of a virtual meter.
  • FIG. 25 depicts two preferred configurations for power interruption using GFI.
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
  • A full system drawing for a preferred embodiment of the present invention can be found in FIGS. 1-8. The system preferably reads meters using four communications media: low voltage (120 volt) power lines, medium voltage distribution lines (12,500 volt), a municipal fiber optic communications ring, and the Internet. FIG. 1 is an overall installation diagram for a preferred embodiment of the present invention. FIG. 2 is an installation diagram for a slave (low-level) transponder. FIG. 3 is a substation installation diagram of a master (high-level) transponder. FIG. 4 is an aerial transformer and coupling diagram. FIG. 5 is a phase-to-phase inductive pad mount coupler diagram. FIG. 6 is a signal transformer assembly diagram. FIG. 7 is a concentrator/signal unit diagram. FIG. 8 is a master and slave transponder power adapter diagram.
  • The system and method of a preferred embodiment of the present invention comprises the following components (see FIG. 1):
  • (1) Transmeters 100. These are the meters which monitor electricity, gas and water at the customer site.
  • (2) Low-level Transponders 110. Utility distribution systems have distribution transformers 115 to bring medium voltage distribution voltages (4×V through 33 kv) down to the low voltages (120-600 volt) connected to the customers. Low-level Transponders communicate with the Transmeters and with high-level Transponders 130 located at substations. Transponders of either type are referred to herein as “data collectors” or simply as “transponders.” The context of usage will convey to those skilled in the art whether the transponder being discussed is a high- or low-level transponder, and whether the distinction is relevant. Referring to the embodiment illustrated in FIG. 1, high-level Transponder 130 requests data from a low-level Transponder 110, which then requests the same data from a Transmeter 100 connected to the same distribution transformer. A low-level Transponder 110 preferably communicates on the medium distribution voltage using a coupler 120, which can be either: (A) an inductive coupler: a device that replaces the cable feeding the distribution transformer with medium distribution voltage (the inductive coupler has two signal wires that connect to the low-level Transponder), or (B) a capacitive coupler: a circuit that includes a capacitor and a signal transformer. Two signal wires connect to the Transponder.
  • A low-level Transponder 110 may have an optional meter with 24 channels. These channels can be used to measure energy delivered on up to 24 phases of individual feeders leaving the distribution transformer. This data may be used to identify losses by comparing aggregate readings of all Transmeters 100 connected by phase and by feeder to the known reading at the low-level Transponder. These losses may be caused by theft of service. Identification of theft of service is a feature of a preferred embodiment of the present invention.
  • High-Level Transponders
  • A high-level Transponder (“Transponder 5”) 130 communicates with Low-level Transponders 110, requesting specified data from specified Transmeters. The data request is made first, and then high-level Transponder 130 polls the low-level Transponder at a later time to see whether the data is ready. The high-level Transponder may request data from several low-level Transponders in sequence and poll them later. Because higher data rates are possible on the medium voltage than the low voltage, the system may thus obtain greater reading efficiency. The Transponders connect to one of several network media to communicate with the billing computer: (A) fiber optic network; (B) hard wire RS-485 network; (C) TCP/IP LAN; or (D) telephone lines.
  • Billing Computer
  • A Billing Computer 140 connects one or many communications networks to read data from many Transponders. The Billing computer is programmed to respond to requests from the utility or requests made over the Internet, and to deliver the required information in a form that is portable to whatever billing software the utility uses, typically MV-90.
  • Billing Computers may be interconnected over the Internet to form a WAN. The user accessing the site does not need to know which Billing Computer is requesting the information, nor the route to the high-level Transponder or low-level Transponder en route to the source of the information, the Transmeter.
  • Internet Interface
  • In a preferred embodiment, an Internet interface at the Billing Center allows the utility or its customer to access an Oracle database.
  • Preferred Embodiments—Common Features
  • Preferred embodiments of the submeter comprise a combination of a Display Board, a Power Board and a case to complete the product.
  • The Display Board is common to all embodiments. The Display Board schematic diagram can be found in FIGS. 9A-B and 10. The Display Board has an application-specific integrated circuit (“ASIC”) U1, a Motorola 68000 microprocessor U2, an LCD driver U4 and display LCD1, a RAM memory (U3 and U6), flash memory U5 and a voltage reference CR1. The Display Board is preferably fabricated on a 5″ to 2″ 10 layer board with special care paid to ground planes. This affords improved protection against “fast transients,” a type of interference found on power lines which often causes corruption of memory.
  • The Power Boards vary depending on the shape and connection requirements of the submeter. The power boards preferably contain power supply components, a battery for the real time clock, current and voltage interfaces, as well as optical, RS-232/485, modem, gas and water meter and other interfaces.
  • Flash memory U5 maintains an audit trail of all critical metering (electric, gas and water) and events (power outages, tamper attempts, etc.). This audit trail forms a second line of defense against “fast transient” induced memory loss. The critical data is preferably stored at least every 15 minutes. The flash memory is most useful for storing firmware or archiving data. It does not function like a RAM. Unlike RAM memories, it is not susceptible to corruption due to “fast transients.” With the preferred archiving method, maximum data loss can be controlled by selecting a frequent archiving period, minimizing the commercial importance of a memory loss. The flash memory audit trail of energy usage has independent commercial value to ESCOs, generating companies, and electric utilities under derogation: energy can be sold at varying prices during the day, even on a 15 or 5 minute basis. The electric meter monitors each phase of the incoming power: electricity measuring volts; amps; real, reactive, and apparent energy and power; power factor; total harmonic distortion; and frequency.
  • The algorithms in the 68000 microprocessor control the ASIC (described in detail below) and are disclosed by the S-record file 28130104.S and improved version 38230102.S in the attached Appendix.
  • The submeter also counts contact closure transitions emitted from water and gas meters. Preferred submeters have a liquid crystal display, an optical port, and an (optional) RS-232/485 port.
  • Preferred submeters feature a power-line modem to communicate over the low voltage (120 volt, 220 volt, 480 volt or 600 volt) lines to a Transponder or Low-level Transponder.
  • In a first preferred embodiment (the “10 series”), the system comprises a small apartment-style submeter that mounts next to a breaker panel within a wall and uses current transformers mounted on the apartment feeders to sense current.
  • In a second preferred embodiment (the “20 series”), the system comprises: (1) a plug-in replacement for socket-style round ANSI meters; (2) gas and water contact closure accumulators, which continue accumulating by battery even if the electric power is removed; and (3) full complex plane (amplitude and angle) calibration of internal 10, 100, or 200 amp current elements to achieve a high level of calibration.
  • A 20 series schematic diagram can be found in FIG. 11C: CT1, CT2, and CT3 (in the upper right corner of the diagram) are inputs from the current transformer. They connect to resistor networks that convert the current source into a voltage level that is compatible with the ASIC (described below). PH-A, PH-B, and PH-C (in the bottom-central part of the diagram) are measurement voltage levels that enter a different resistor network and divide the voltage to a level that is readable by the ASIC. H3 (at the upper-central part of the diagram) is a header connection to the display board. H8 (near PH-A) is a header that connects high voltage phases. PLCX1, PLCX2, and PLC1 (near H3) are control signals that perform power line communication (PLC). U2 (in the right-central part of the diagram—near H7) is a microprocessor that is connected to a contact closure counting circuit. Contact closures are isolated by L3 and OPT1 through OPT6. Q4 and LED1 are the optical receiver and transmitter, respectively. The ferrite beads FB are intended to decouple high frequency noise. SW1, SW2, and SW3 are user access control switches. T1 is the transformer for the main power supply transformer for this unit. The input is 120/220 selectable by SW4. Power voltage is rectified and regulated. T2 provides an isolated power supply for an optional Modem Board attachment.
  • A third preferred embodiment (the “50 series”) comprises an IEC bottom connect meter in which 100 amps at 200 volts 50 Hz pass through the meter to the customer and full complex plane (amplitude and angle) calibration of internal 10, 100, or 200 amp current elements to achieve high levels of calibration.
  • A fourth preferred embodiment (the “MC series”) comprises a 24 channel meter that can be configured to 24 single phase loads, 12 apartment style loads, or 8 three phase commercial loads and provides economical per point cost.
  • The Transmeter MC series schematic diagram is of the PCB type TMX-5 and can be found in FIGS. 12A-C, 13, 14, and 15A. Note that the Low-level Transponder and the Transponder 5 also have PCB type TMX-5. Component placement determines whether the board is an MC series, Low-level Transponder, or Transponder 5. The circuits in FIGS. 12A-C, 13, 14, and 15A are discussed below.
  • Low-level Transponder: (1) receives instructions from Transponder to read a meter within its communication scope—typically one distribution transformer; and (2) can also be a meter to act as a check against loss due to theft. The Low-level Transponder schematic diagram is of PCB type TMX-5 and can be found in FIGS. 12A-C, 13, 14, and 15A.
  • Transponder: (1) reads Transmeters directly or via Low-level Transponders; and (2) communicates with fiber, phone or TCP/IP LAN. The Transponder schematic diagram is of PCB type TMX-5 and can be found in FIGS. 12A-C, 13, 14, and 15A.
  • TMX-5
  • The following are circuits in FIGS. 12A-C, 13,14, and 15A.
  • H8 (see FIG. 12A) is a switch or adapter that selects between 120/220 VAC power supply voltage. Each phase is independently rectified and the rectified voltages are tied together. This requires only one of the power phases to be active for the system to receive power.
  • The transponder preferably has the ability to communicate on three power phases. There are three sets of PLC transmit and receive circuits (see FIG. 12A). A slave microprocessor U9 (see FIG. 15A, lower left) controls the transmit circuits by controlling the following: the PLC phase gating IC U11 (see FIG. 12A), level inverter IC U13 (see FIG. 12A), and analog inputs U14 (see FIG. 12A). J3 is the connector for serial communication to an external contact closure counter. Its power supply is current limited. The algorithms contained in the slave microprocessor are described by the HEX formatted file, PLCGATE.HEX in the attached Appendix.
  • There are 24 meter inputs (I0/N0 through I23/N23, shown in FIG. 13), each connecting to its own current-to-voltage resistor network. Metering is gated three phases at a time by analog multiplexers U2-U8 (see FIG. 13) into the ASIC by means of a slave microprocessor U8 (see FIG. 15A). Its master, the 68000, communicates with the slave to synchronize phase and timing. The algorithms contained in the slave microprocessor are described by the HEX formatted file, PHZGATE.HEX, in the attached Appendix.
  • SW1, SW2, and SW3 (see FIG. 13) ate user access control switches.
  • H2 and H3 (see FIG. 14) are headers that connect to the current transformers CT1-CT24 (see FIG. 14) to current inputs.
  • MV-1, MV-2, and MV-3 (see FIG. 15A) are measurement voltage levels that enter a different resistor network and divide the voltage to a level that is readable by the ASIC.
  • H4, J1, and J2 (see FIG. 15A) are expansion headers that allow reading of more current channels.
  • H5 (see FIG. 15A) is a header connection to the display board.
  • J3 (see FIG. 15A) is a header that optionally connects with external pulse counters. The circuit involving Q8 provides a current-limited +5V supply.
  • Q7 and LED1 (see FIG. 15A) are an optical receiver and transmitter, respectively.
  • “Big Helper” Automated Reading and Billing Software
  • This software runs on the Billing Computer and preferably comprises the following functionality:
  • (1) Read all Transponders to obtain required metering data from all Transmeters.
  • (2) Compare metering data with specified limits or historical data to identify suspicious readings or equipment failures at the earliest possible time.
  • (3) Compare Low-level Transponder energy readings with those of the corresponding Transmeters® to identify theft.
  • (4) Automatically select the best route to each Transponder, whether it be fiber, telephone, RS-485 or via the Internet to a satellite billing center running the Big Helper Software. This allows one billing center to use the Internet to connect to other centers in distant places without the use of long distance telephone service.
  • (5) Store data to an MV-90, Oracle® (or other equivalent) database for generation of bills.
  • (6) Seamlessly interconnect over the Internet to form a WAN of billing computers, each associated with a different set of Transponders.
  • Alternate Embodiments
  • Gas and Water Meter Interfaces
  • In the 20 series embodiment (see FIG. 11C), the gas and water meter interfaces continue to accumulate contact closures in the absence of electric power applied to the electricity meter. This is important for an electric company that wishes to sell meter reading services to water and gas utilities, yet guarantee data integrity even when electric power is out for an extended period of time.
  • A contact-closure counting microprocessor is powered by a diode OR of the +5V supply and on-board battery, enabling contact-closure counting in the absence of power. The pulse microprocessor accumulates counts in its internal registers and sends the data to the main processor via serial transfer. To sense the state of the contact closure, the microprocessor energizes the primary of a pulse transformer. The contact closure points are in series with the secondary of the pulse transformer. If the contact is closed, the diode in an optical isolator is forward biased. This energizes its photo detector, which is a sample-and-hold capacitor. The microprocessor reads the level on the capacitor as low. If the contact is not closed, the optical isolator is idle. The capacitor recharges and is read high. The algorithms contained in the pulse microprocessor are described by the HEX formatted file, PULSE.HEX, in the attached Appendix.
  • Opto Adaptor
  • The Opto Adaptor (Optical Adaptor) converts RS232 into an optical signal that can be read by each meter. This board enables any meter to communicate with any computer through its serial port. An Opto Adaptor schematic diagram can be found in FIG. 16. U1 converts RS232 to TTL levels. Q1 and Q2 are gain transistors to drive the optical transmit LED1. Q5 is the optical receiver. Q3 provides gain and Q4 inhibits the receiver.
  • Modem Board
  • The Modem Board is so named because its on-board modem permits remote dial-in communication to other devices through different communication schemes. The Modem Board schematic diagram can be found in FIGS. 17A-B. Each Modem Board is attached to a Mother Board containing an ASIC. Each Modem Board consists of a modem MD1, external RS232 (via H4), external RS485 (via H1), and an on-board microprocessor U10. The modem, RS232, the Mother Board, microprocessor, and external RS485 all communicate across the R5485 bus by means of TTL/RS485 converters (U1-U8). U11 converts incoming RS232 to TTL levels. U12 rectifies signal levels for RS485 converter controls. The phone line is connected to RJ11. Power into the rectifier and regulator come from H2. H5 is the header that allows factory programming of U10.
  • To avoid bus conflicts, the on-board microprocessor arbitrates Master control and Slave control over these devices. The algorithms contained in the microprocessor are described by the HEX formatted file, MODEM.HEX, in the attached Appendix. The modem board's Auto Hunt feature seeks and adjusts to one of three appropriate baud rates 9600, 19200, and 38400.
  • Calibrator
  • The meter is calibrated automatically by a fully automatic calibrator. The calibrator: (1) can calibrate the meter at 20 points for both amplitude and phase; (2) calibrates each phase of the meter independently; (3) stores calibration constants in the non-volatile flash memory of the Transmeter; and (4) archives calibration records to the manufacturing database. The calibrator is described more fully below.
  • The ASIC
  • Meter Component
  • The ASIC of a preferred embodiment has an advanced electric meter with the following features:
  • (1) Automatic Autoranging Current and Voltage Amplifiers. The ASIC amplifiers sense the level of current and adjust to the level automatically in hardware. The ASIC voltage amplifiers are controlled by the external microprocessor.
  • (2) Automatic sample and hold timing logic. Allows for calibration of angle errors.
  • (3) Late voltage sampling logic and line frequency meter. Allows for generation of precise 90° phase shifted waveform for calculation of reactive power and energy.
  • (4) Offset DAC—allows for automatic firmware controlled amplifier offset correction.
  • (5) 12 BIT DAC with calibration points. A 12 BIT DAC with only 8 bits of accuracy is calibrated with digitally selected current sources to achieve 12-bit resolution and monotonicity.
  • (6) Auxiliary inputs to read battery voltage, power supply voltage, signal voltage from powerline modem and external analog quantities.
  • (7) Use of one of the analog inputs to compensate the temperature curve of the ADC to achieve better accuracy. Reads a fraction of the reference voltage generated with a voltage divider to maintain a constant scale factor over temperature.
  • (8) A digital potentiometer with 64 tap points used to digitally calibrate the voltage reference to within 0.1% from an initial accuracy of 5%.
  • (9) Read the voltage on a common silicon diode to obtain an analog of temperature. Storing N pairs of calibration position from (8) above and temperature diode voltages can fit a curve of degree N-1 to the temperature variation, precisely controlling the temperature variation of the reference voltage. The diode is also used to correct the temperature variation of the real time clock crystal.
  • Powerline Modem Component
  • The ASIC of a preferred embodiment has a powerline modem with the following features:
  • (1) An adjustable gain, adjustable frequency analog bandpass filter with minimal external components.
  • (2) A circuit to allow continuous calibration of the gain and center frequency of the bandpass filter under microprocessor control.
  • (3) A bandpass delta-sigma modulator to convert the analog data to a digital stream.
  • (4) A digitally implemented demodulator unit capable of adjusting gains and demodulating either fsk or bpsk data.
  • (5) A digitally implemented fsk and psk modulator.
  • (6) A digitally and software implemented data clock that uses the line frequency or a multiple thereof as a common synchronous data clock throughout the system network.
  • Digital Control and Memory
  • The ASIC of a preferred embodiment contains many circuits that control the external devices on the Display Board: (1) a Motorola 68000 bus generator; (2) memory control logic; (3) a real-time clock (RTC); (4) a watchdog timer; (5) 4 kBytes of CMOS battery backed RAM; (6) digital I/O (7) tamper switch detection that continues to operate on battery; and (8) a bootstrap ROM for loading a secondary bootstrap program to internal RAM.
  • Firmware
  • Firmware controls many of the above-mentioned features of metering with advanced calibration algorithms, powerline communication protocols, liquid crystal displays, serial data interface. See 28130104.S in the attached Appendix.
  • The firmware provides an Advanced Data Integrity Method by providing a flash memory audit trail for added protection against data loss.
  • The firmware also provides a Data Log of Energy and Event Information, since the audit trail of energy information is commercially valuable under derogation to ESCOs, utilities and end-users.
  • The firmware works with the Calibrator and (optionally) a Toaster (a test apparatus) to calibrate:
  • (1) The ADC. Realize 12 bits from an 8 bit limited CMOS process.
  • (2) The voltage reference. Obtain 0.1% accuracy from a 5% device.
  • (3) The internal current transformers (both amplitude and phase—a complex plane calibration), at 20 separate logarithmically-spaced points throughout the load curve.
  • (5) All components in the metering circuit,
  • (6) The time clock's 32768 Hz crystal.
  • The firmware also provides Temperature Compensation Methods, since it: (1) uses a temperature diode to calibrate the voltage reference and time clock over temperature; and (2) uses a resistor divider on the voltage reference to calibrate the ADC over temperature.
  • The firmware also provides Self Calibration Methods, since it: (1) calibrates the bandpass filters periodically, and (2) adjusts the offsets in the meter circuits continually.
  • Also, the firmware provides Advanced Metering Parameters, since it:
  • (1) Uses a unique sample and control algorithm to provide all metering quantities. This method is fully determined by the program in the 68000, which controls the ASIC.
  • (2) Measures line frequency and create virtual 90 degree shifted voltage waveform for reactive power.
  • (3) Uses real, reactive and apparent power to calculate power factor, total harmonic distortion and phase angle.
  • The firmware can also automatically determine the proper range for: (1) Voltage; (2) Current; (3) Powerline signal; and (4) Demodulator parameters.
  • A more detailed description of the ASIC, its components, and its functionality are provided below.
  • Configuration of a preferred submeter system is depicted in FIG. 18. The following is a description of principal modules in the system.
  • A Power Supply 1801 supplies unregulated DC voltage +U for high power functions such as PLC. A regulated +5 VDC feeds each of the ICs and many other circuit blocks.
  • A Battery 1802 provides power for power-out operation of several functions in the ASIC including the Internal RAM A2, RTC A3, and 32768 Hz crystal 1809. It also powers the pulse reader when system power is unavailable.
  • Microprocessor U2 performs all the intelligent computations from the raw meter data and the ASIC states. The main program memory resides in the FLASH U5 but also run out of RAM and ASIC ROM in some cases.
  • FLASH U5 is nonvolatile memory, the site of primary memory storage and program memory.
  • RAM U3 is an IC that is external to the ASIC for microprocessor temporary storage of information.
  • Display Driver U4 sends the control signals to the LCD LCD1.
  • The ASIC U1 contains the bulk of the control hardware in the submeter system. The control blocks within the ASIC are discussed below.
  • 32768 Crystal 1809 is used for time keeping.
  • 20M Crystal 1810 is the system clock for both the ASIC and the microprocessor.
  • VREF CR1 is a 2.5VDC reference voltage. This design utilizes an IC with an external voltage adjustment such as LM336-2.5. The ASIC contains a 64 tap digital potentiometer that provides one of 64 voltage levels to the external control line. The ASIC control of VREF CR1 saves the cost of a moving part and provides digital code accuracy. Furthermore, because this code can be software-controlled, VREF can be calibrated meter by meter and can be calibrated to fit a parabolic profile with temperature. VREF is calibrated to 2.49V, the voltage point of greatest temperature stability.
  • PLC Hardware 1815 is the power circuitry for the PLC transmit and receive.
  • Peripheral Interface 1818 is the connection point to external devices such as Pulse Relay, Relay Control, Minicloset interface, and transponder phase control circuits.
  • Hardware Test Points 1820 supply the ASIC with information that enables reading of +U, temperature, and ADC calibration. Various test points in the ASIC can be output as well.
  • Optical Reader 1825 is the hardware that translates the serial communication into optical transmission.
  • Voltage Divide 1830 is a 1000:1 voltage divide circuit that prepares measurement voltage for ASIC input.
  • Current Shunt 1835 is a resistor network used to convert current to voltage for ASIC input.
  • Detailed ASIC Description
  • A preferred ASIC system U1 is depicted in FIG. 18. The following is an explanation of the different modules in the ASIC.
  • The Meter
  • Meter A1 reads the current and voltage channels from Voltage Divide 1830 and Current Shunt 1835. Internal amplifiers and correction factors improve the accuracy of the meter reading.
  • RAM (Internal) A2 is non-volatile RAM, backed up by the external battery 1802. This is the storage site for temporary RAM accumulators and other critical RAM variables.
  • Real Time Clock (RTC) A3 is the continuous time keeper for the system. The RTC is clocked by an accurate 32768 Hz crystal 1809 and is the standard for time clocking. Battery power from battery 1802 keeps the RTC operational even when system power is removed.
  • PLC Control A4 contains the control logic required to transmit and receive data that was sent through the PLC channels.
  • Digital Control Logic A5 provides the interface bits that control the enable lines for each part, the address and data busses, system reset, and access to internal state registers.
  • Unless Watchdog Timer (“WDT”) A6 is refreshed, it will trigger a system reset.
  • Serial UART with FIFO A7 functions much like the PC16550D from National Semiconductor.
  • Digital I/O A 8 is used for communicating to peripheral devices through the Peripheral Interface 1818.
  • Analog I/O A 9 is used to gather system information from Hardware Test Points 1820. This also outputs various analog points within the ASIC.
  • Sampling
  • The following is an example of the sampling times of voltage and current.
  • Ideally the voltage and the current samples are performed exactly at the same time. However there are timing issues in the current and the voltage measurement hardware. Because time discrepancies are usually not equal, a constant timing adjustment, which we shall call “delay,” is applied to the current sampling channel. The term “delay” is used loosely here because the actual numerical delay can be a positive or negative number. In Table 1, the delay is 0.056°. This number is obtained through calibration.
  • For each measurement, four voltage samples (V1 VL1 V2 VL1) and one current sample (I) are taken. V1/VL1 is used for phase-to-neutral reading and the V2/VL2 pair allows phase-to-phase reading. The difference between the two types will become more evident in the meter diagram discussion.
  • V1 and VL1 comprise a voltage sample pair. The two samples are placed approximately 2° apart. V1 is called the Voltage Sample and VL1 is called the Late Voltage Sample.
  • Each measurement phase takes turns utilizing the metering channel to read their sample pairs. For example, in a three-phase meter, phase 1 is read, then phase 2 is read, then phase 3 is read, then phase 1 is read again. Eventually all the phases are read and the cycle repeats.
  • The process requires two voltage samples to be 90° apart. The strategy is to set the cycle period so that V1 from one sample pair and VL1 from another sample pair will be exactly 90° apart. Table 1 lists example sampling degrees for a three-phase (3Φ) meter. Only phase 1 is shown.
    TABLE 1
    Sample n V1(n) VL1(n) I(n)
    1 0.056°
    2 44 46 44.056
    3 88 90 88.056
    4 132 134 132.056
    5 176 178 176.056
    6 220 222 220.056
    7 264 266 264.056
    8 308 310 308.056
    9 352 354 352.056
    10 36 38 36.056
  • Note the following:
  • (1) V1(1) and VL1(3) are 90° apart and therefore complete a measurement pair. V1(2)/VL1(4), V1(3)/VL1(5), and V1(4)/VL1(6) make up future measurement pairs.
  • (2) Note that the current is offset from the voltage by 0.056 degrees. This is the delay required to synchronize the reading of the two channels.
  • If Table 1 were extended, the sampling would sweep out the entire voltage waveform over a period of time. In a 3Φ meter every 4° would be sampled over 11 cycles. Table 2 shows the sequences of sampling degrees that would sweep the entire waveform:
    TABLE 2
    V1(n) in degrees
    Φ1 of a 3Φ meter
    0, 44, 88, 132, 176, 220, 264, 308, 352, 36, 80, 124, 168, 212,
    256, 300, 344, 28, 72, 116, 160, 204, 248, 292, 336, 20, 64, 108,
    152, 196, 240, 284, 328, 12, 56, 100, 144, 188, 232, 276, 320, 4,
    48, 92, 136, 180, 224, 268, 312, 356, 40, 84, 128, 172, 216, 260,
    304, 348, 32, 76, 120, 164, 208, 252, 296, 340, 24, 68, 112, 156,
    200, 244, 288, 332, 16, 60, 104, 148, 192, 236, 280, 324, 8, 52,
    96, 140, 184, 228, 272, 316, 0

    Even better, since the 2° separation between V1 and VL1 is not exact, all of the degrees between will eventually be swept out over a longer period of time.
  • The other two phases in a three-phase meter fall evenly between the gaps of the sample pairs, as shown below in Table 3, V1 degrees of a 3Φ Meter:
    TABLE 3
    Phase 1 Phase 2 Phase 3
    0.00° 14.67° 29.33°
    44.00 58.67 73.33
    88.00 102.67 117.33
    132.00 146.67 161.33
    176.00 190.67 205.33
    220.00 234.67 249.33
    264.00 278.67 293.33
    308.00 322.67 337.33
    352.00 6.67 21.33
  • Two-phase (2Φ) meters are sampled analogously to a 3Φ meter except the third phase samples are discarded. Table 4, V1 degrees of a 2Φ Meter, shows the sampling of a Two-Phase Meter:
    TABLE 4
    Phase 1 Phase 2
    0.00° 14.67°
    44.00 58.67
    88.00 102.67
    132.00 146.67
    176.00 190.67
    220.00 234.67
    264.00 278.67
    308.00 322.67
    352.00 6.67
  • Mini-closets are sampled so that all 24 phases are sampled in about 630 degrees or seven quarter cycles of the oine as shown below in Table 5, Sample Pair Degrees of a Mini-Closet. This implies that each phase sweeps the entire sine wave in 67 line cycles.
    TABLE 5
    Phase V V L
    1 0.00° 2.00°
    2 26.17 28.17
    3 52.33 54.33
    4 78.50 80.50
    5 104.67 106.67
    6 130.83 132.83
    7 157.00 159.00
    8 183.17 185.17
    9 209.33 211.33
    10 235.50 237.50
    11 261.67 263.67
    12 287.83 289.83
    13 314.00 316.00
    14 340.17 342.17
    15 6.33 8.33
    16 32.50 34.50
    17 58.67 60.67
    18 84.83 86.83
    19 111.00 113.00
    20 137.17 139.17
    21 163.33 165.33
    22 189.50 191.50
    23 215.67 217.67
    24 241.83 243.83
    1 268.00 270.00
  • Electrical quantities are computed from sampled voltage and current. The following are the mathematical formulas used:
  • Quantities calculated every sample:
    Sample index: n=n+1
    Real Energy: WHr n =K U V 1(n)I(n)T S +WHr n-1
    Reactive Energy: VARH n =K U V L1(n+m)I(n)T S +VARH n-1
    Apparent Energy: U n =√{square root over (WHrn 2+VARHn 2)}
    Volts-square hour: V 2 H=K V 2 V 1(n)2 T S +V 2 H n-1
    Current-square hour: I 2 H n=(K U /K V)2 I 1(n)2 T S +I 2 H n-1
    Quantities calculated every frame of N samples:
    Frame Index: f=f+1
    RMS voltage: VRMS f=√{square root over ((V 2 H n)/T N)}
    RMS current: IRMS f=√{square root over ((I 2 H)/T N)}
    Volt-Amp hour: VAH f =VRMS f IRMS f T N +VAH f-1
    Where:
    • KU=KWH calibration constant for a particular range and metering phase.
    • KV=Voltage calibration constant.
    • V1(n)=Voltage sample point “n”.
    • VL1(n+m)=Late voltage sample that is 90° displaced on the waveform from V1(n).
    • I(n)=Current sample point.
    • N=Total number of samples taken in a frame.
    • TS=Sample period.
    • TN=Frame period.
      Notes:
    • 1. VRMS and IRMS are non-accumulation quantities but require a frame of samples for calculation. A frame size is approximately 1 second's worth of samples. The VRMS calculation uses V2H that has accumulated between samples 0 and N. Similarly, the IRMS calculation uses I2H that has accumulated between samples 0 and N. Therefore VAH is only updated once per frame.
    • 2. VAH contains power of harmonic content, whereas WHr, U, and VARH, do not.
      Calibration
  • When the meters are produced, they are capable of measuring voltage, current, KWH, and other parameters. These measurements can have an error of up to plus or minus 15 percent, due to manufacturing tolerances in the electronic components. While the value of this error is not predictable, the error will be extremely stable for a given meter. In other words, a meter which has just been built will not be particularly accurate, but the error will be very repeatable.
  • The calibrator used in a preferred embodiment measures the inherent error of the meter, then instructs the meter's onboard processor to correct the measured error. The meter stores these correction factors in its non-volatile memory, resulting in readings that are both accurate and stable.
  • The calibrator comprises a computer and auxiliary equipment. The calibrator is preferably capable of supplying AC voltages between 0 and 600 volts, and AC currents between 0 and 210 amps. The phase angle theta (Θ) between the voltage and the current is adjustable from −90 to +90 degrees. The frequency of the AC power can be either 50 or 60 hertz.
  • The calibrator communicates with the meter using the meter's built-in optical communications port, and uses standard measurement devices to measure the actual correct value of the parameters being adjusted. For voltages, the calibrator uses a digital voltmeter (DVM) to obtain the actual values. For KWH, the calibrator uses a Radian KWH standard to measure the KWH to 0.05 percent accuracy.
  • There are several possible sources of errors in the meter's measurements: (1) voltage reference value and stability; (2) ADC linearity; (3) amplifier gain and delay; (4) sample rate; (5) system clock frequency; and (6) component tolerances for resistors and capacitors in measurement circuitry.
  • Calibration Algorithm
  • Voltage reference calibration: The output voltage of the voltage reference is adjusted by the calibrator to an initial value chosen to provide the most stable output voltage. This is accomplished by reading the actual value of the voltage reference using a DVM. The meter is then instructed to set the value of a digitally-controlled potentiometer (within the ASIC in the preferred embodiment) that adjusts the output voltage of the voltage reference. The calibrator then repeats this process until the voltage reference is set to the correct nominal output voltage (in a preferred embodiment, this is 2.490 Volts).
  • ADC linearity calibration: the meter uses an ADC inside the ASIC to read the voltage, current, and other analog values needed by the measurement algorithm of the meter. When the ASIC is manufactured, this ADC may be non-monotonic at high-order bit transitions. The ASIC provides for individual adjustment of the weight of the 5 high-order bits in the ADC, allowing calibration to guaranteed monotonicity. The calibrator uses a DVM to measure values just above and below these bit transitions, and adjusts the weight of each bit in order to get a monotonic response. These adjustments are performed by the meter's firmware, which writes correction values into registers in the ASIC. When the proper correction values have been found, the calibrator instructs the meter to store these values permanently in the non-volatile memory.
  • VREF and ADC temperature drift calibration: the voltage reference and the ADC are both affected by temperature changes experienced by the ASIC. This results in an error which varies with temperature. The calibrator measures the performance of the voltage reference and the ADC at 3 different temperatures (room temperature, 5° C., and 85° C.). The effect of temperature is then communicated to the meter's firmware. In operation, the meter reads its ambient temperature, then uses the temperature calibration information to correct for the effects of temperature on the ADC and voltage reference.
  • Voltage calibration: the meter must measure AC RMS voltage. The accuracy of the measurement is affected by the factors listed above (in “sources of error”). The meter has 4 different measurement ranges for voltage. In the present meter, these ranges are: (1) Range 3—0 to 75 volts; (2) Range 2—75 to 150 volts; (3) Range 1—150 to 300 volts and (4) Range 0—300 to 600 volts.
  • The different ranges use different internal configurations of the ASIC, resulting in different gains in the signal presented to the ADC. Each of these gain settings may have a different error. For each voltage range, the calibrator supplies the meter with an AC voltage which is appropriate for that range. The calibrator then reads the voltage applied to the meter using a DVM, and also reads the voltage as measured by the meter. The difference in these readings is analyzed, and a correction factor is calculated and sent to the meter. For each range, this process is repeated until the meter and the DVM measurements agree. The value of the correction factor (the Voltage Calibration Constant) is then permanently stored in the non-volatile memory of the meter.
  • KWH calibration: the meter must measure energy in KWH. In order to do this accurately, the external quantities of voltage and current must be accurately measured so that KWH can be calculated. The KWH measurement depends on the value of the voltage and the current, and the timing relationship between the voltage and the current. The equation for KWH is Volts*Amps*Cos(Theta)*Hours, where Theta is the phase angle between the voltage and the current. The meter performs this measurement by sampling the voltage and the current simultaneously, then processing these instantaneous values.
  • Various errors can occur due to the reasons listed above. For this measurement, it is not only necessary to correct any errors in the values of the measured voltage and current, it is also necessary to correct for any error in the time relationship of these measurements. The meter has 20 ranges for current, from range 23 at 0.5 amps to range 4 at 100 amps. For each range, the internal configuration of the ASIC amplifiers is different, and the CT introduces current-dependent errors in both amplitude and delay. Therefore, the calibrator repeats the KWH calibration for each range.
  • Amplitude compensation: any error in the actual value measured for voltage and current is compensated for by using an “Amplitude” (A) calibration constant. This constant is a factor by which the readings are multiplied, to make the measured value correct.
  • Delay compensation: the time relationship between the voltage and the current signals may be incorrect due to amplifier characteristics in the ASIC, or due to the characteristics of the current transformers (CTs). In particular the CTs introduce a current-dependent phase shift which becomes greater and greater at low currents. This results in the current signal not being properly synchronized with the voltage signal. This error results in errors in the KWH measurement due to the change in theta caused by this time shift.
  • Any error in the time relationship between the voltage and the current measurement is compensated for by instructing the ASIC to sample the current either before or after the ASIC samples the voltage. This time-delay between the samples is adjusted to exactly cancel the time-delay caused by the measurement circuitry. This is referred to as the “Delay” (D) calibration constant.
  • KWH calibration algorithm: for each of the 20 current ranges, the calibrator sets up a specified voltage and current. This voltage and current are supplied to the meter being calibrated, and also to a KWH standard (Radian RM-10, ±0.05%). The calibrator cannot directly measure the quantities that it needs to communicate to the meter (amplitude and delay error). Instead, the calibrator measures the actual error in KWH registration. This error is caused by the combination of the amplitude error and the delay error. The calibrator does this measurement by supplying the specified current and voltage to the meter and to the standard, then measuring the accumulated KWH for a specified time interval. The difference between the standard and the meter measurements is the KWH error.
  • In order to separate the contributions of the amplitude error and the delay error to the total error, the calibrator performs the KWH test twice. In the first test, theta is set to 60 degrees, and the KWH error is measured and saved. Then, the test is repeated at 0 degrees.
  • Because the slope of the cosine is nearly flat around 0 degrees and quite steep at 60 degrees, the contribution of the delay (timing) error is very small at 0 degrees, and much larger at 60 degrees. The contribution of the amplitude (value) error is the same at either 0 or 60 degrees. Therefore, with these 2 measurements, the calibrator can solve for the 2 independent error sources (amplitude and delay).
  • After the calibrator does these measurements and makes these calculations, the calibrator instructs the meter to compensate for these errors.
  • This entire process is then repeated, until the measurements at both 0 and 60 degrees are within specification. The calibration constants are then stored in the meter's non-volatile memory.
  • Interval Metering
  • Interval metering stores independent records of metering data for future recall. Electrical parameters are continuously accumulated into battery-backed RAM and then periodically stored to non-volatile FLASH memory. For example, if the metering interval were set to 30 minutes, there would be 48 records of data in the day. Table 6 below, illustrating interval storage, is an example of data storage using Interval Metering. Interval Metering can be particularly useful in calculating billing demand.
    TABLE 6
    Time at start of Interval Consumption
    02/03/2001 05:00 am 0.122 kwh
    02/03/2001 05:30 am 0.128 kwh
    02/03/2001 06:00 am 0.115 kwh
    02/03/2001 06:30 am 0.858 kwh
    02/03/2001 07:00 am 0.778 kwh
    02/03/2001 07:30 am 0.353 kwh
    02/03/2001 08:00 am 0.247 kwh
    02/03/2001 08:30 am 0.137 kwh
  • Interval Metering offers more frequent data records, which is useful in demand billing calculations and Theft Detection. But more important, Interval Metering in conjunction with FLASH memory provides protection from data corruption. In the past, switching a very high-current inductive load created an enormous transient on the line, destroying the RAM data. In other cases, RAM has also been found to corrupt in the presence of EMI sources such as toy transmitters.
  • Because RAM data is frequently dumped to FLASH memory, only a minimal amount of data in RAM is ever exposed to corruption. Reducing the storage intervals further increases data protection. FLASH is a far more reliable memory because, it requires a sequence of commands for any data modification and does not require a power source for data retention.
  • FIG. 19 shows how electrical parameters are accumulated in preferred software. There are two data accumulation registers per parameter and phase. The first register iAcc[0] becomes active. After a short period of time, this register is available to be dumped into RAM register curph. While waiting for this transfer, iAcc[0] ceases to accumulate and iAcc[1] is cleared and begins active accumulation. When iAcc[1] is ready for transfer, iAcc[1] becomes inactive and iAcc[0] is cleared and begins to accumulate. This enables seamless accumulation and periodic dumping to curph in RAM.
  • At the end of a metering interval, the electrical parameters are then stored to FLASH. After successful storage to FLASH, the RAM register is cleared and begins to accumulate for the next interval.
  • Meter Hardware
  • The overall Meter Hardware is depicted in FIG. 20. The upper portion shows the voltage channel and the lower portion the current channel. Both voltage and current are fed through their own gain stages and are selected through MUX M6 for the ADC.
  • Voltage channel—MUX M1 and MUX M2 independently select between V1, V2, V3, and N. The signal through the amplifier A1 is phase-to-neutral. The signal through the amplifier A2 is a differential (or delta) voltage between the two signals that were selected from MUX M1 and MUX M2, the delta voltage V2. Each of these voltages pass through two sample and hold circuits, creating the late voltage VL. From the four sample and holds emerge: V1, VL1, V2, VL2.
  • Amplifiers A1 and A2 have adjustable gains. Because A2 is intended for higher delta voltage, its gains are half of A1. The gain setting corresponds to a particular range of voltage amplitudes that will obtain optimal readable scale after amplification. There are four voltage ranges, 0 through 3.
  • V1: Gain=2R
  • V2: Gain=2R-1
  • Current channel—MUX M3 selects between 4 signal pairs: I1/N1, I2/N2, I3/N3, and VREF/VREF. The signal passes through amplifier A3, is selected by MUX M4 and passes through a series of amplifiers A4-A8. There are 23 current range settings selectable through MUX M5 and amplifier A4.
  • I: Gain=1.00 0£R£3
      • 3.33(R-4)/23 4£R£23:
  • Offset control—Small offset voltage in amplifier A3 could saturate the current channel at higher ranges, making current unreadable. To null any offset, the output offset is dynamically monitored and adjusted in amplifier A4.
  • ADC Temperature Calibration—Because there is temperature variation with the ADC, the ADC is calibrated with temperature against the temperature sensing diode. The result is a best fit curve that can be applied to the final data in software.
  • Power Line Communication
  • A preferred implementation of Power Line Communication (PLC) is flexible enough to allow for faster data rates and successful data recovery.
  • Modulation schemes—Two modulation techniques are available: Frequency Shift Keying (FSK) and Phase Shift Keying (PSK).
  • Data Rates—The Baud Clock is synchronized to the line phase by means of a Phase-locked Loop (PLL). The PLL is jointly implemented in software and hardware. By knowing the zero phase crossings from the PLL, the actual data rate can be synchronized to fractions or multiples of the line frequency.
  • PLC Receiver—The PLC receive circuitry as found in the ASIC is shown in FIG. 21. In the normal mode, M2 channels the PLC input into the filter. The filter rejects out-of-band noise and couples the signal into the demodulator.
  • The PLC filter is designed as a continuous time domain filter. Its advantage over switched capacitor filters is to achieve higher Q and lower internal noise level in the operating frequency band. The high Q is essential because a bandpass effect is created from a lowpass, high Q design with attenuation. The attenuation compensates for high gain at the peak frequency of the LPF. The attenuation provides the low frequency rejection. A true bandpass filter can also be used as well. The filter is tunable to frequencies from 20-90 kHz. The filter also compensates for variation due to components and temperature variation.
  • The overall filter is frequency-tuned with the Coarse Adjustment Register. The proper setting places the filter in the vicinity of the desired value. The entire filter is comprised of four filter stages, with the attenuation control spread over the four stages. These four stages need to be aligned to the desired frequency. Fine Adjust registers F1-F4 enable frequency tuning of each stage while Attenuation registers A1-A4 enable amplitude tuning or each stage. Together, these adjustments calibrate out any discrepancies between stages.
  • Each filter stage is preferably implemented as a two-pole lowpass filter with two external capacitors. A preferred filter is shown in FIG. 22.
  • Filter Alignment: Filter alignment is the process of tuning the corner frequencies of each of the four filter stages to the desired frequency by means of phase shift detection. The alignment process injects a test signal with a Square Wave Generator U2. U2 also outputs the phase of the square wave to be latched in by a Phase Shift Detector U1.
  • The microprocessor selects the desired frequency for U2 and routes the square wave through M2 to the input to filter. This square wave signal passes into all four stages of the filter. The microprocessor selects the filter stage output to pass through M1. The signal undergoes phase shift in the filter stages and its rising edge becomes the latch clock for U1, latching across the phase difference between the filtered signal and the test signal. For the two-pole lowpass stage, the phase at the corner frequency is 90°.
  • The ADC monitors the signal strength of the PLC signal to adjust attenuators A1-A4 for adequate clocking of the phase capture latch. The following is the filter alignment process:
  • (1) Place Fine Adjust of Stage 1 at the midpoint value.
  • (2) Set the Coarse Adjust Register to the highest frequency setting and lowest attenuation. Observe signal strength with the ADC. Decrease Coarse Adjust until there is valid signal strength. Adjust attenuators so that filter input does not saturate. Check phase difference. Continue adjusting Coarse Adjust and Attenuator 1 until there is a 90° difference.
  • (3) Tune Stage 1: (A) start with Fine Adjust 1 at the midpoint; (B) modify Attenuator 1 for valid signal strength; (C) check filter phase; (D) change Fine Adjust in the direction that leads the filter phase to 90° (a binary search algorithm is suggested); and (E) repeat (B) to (D) until filter phase is 90°.
  • (4) Tune Stages 2 thru 4. Note that the Phase Capture value is the phase difference between the square wave input and the output of the filter stage. Therefore Stage 2 seeks a 180° difference, Stage 3 seeks a 270° difference, and Stage 4 seeks a 0° difference.
  • Similarly, if the filters were designed with true bandpass filters with the same roll-off, the phase difference across stages would be 180 degrees.
  • Digital Demodulator: The filtered signal enters the demodulator circuit. The digital demodulator uses a digital phase lock loop to identify the binary data stream.
  • PLC Transmitter
  • A preferred embodiment uses ASIC control circuitry to control the PLC transmitter. There are two outputs that can be driven in parallel or opposite, depending on whether the design is for a bridge circuit or for a single-ended circuit.
  • A preferred transmitter circuit is found in the 10 series schematic drawing in FIG. 11A. Because the switching time differs between off and on, there is some overlapping period of time when both Q2 and Q3 are both active. This overlap short-circuits the power supply through Q2 and Q3 for a brief moment creating transition heat. The hardware can be designed so that neither Q2 nor Q3 will be active at the same time. This is illustrated in Table 7, which lists a Transistor Switching Sequence. The interval when both Q2 and Q3 are off is called Dead Space. Here are some benefits: (1) transition heat of the Q2 and Q3 is reduced or eliminated; and (2) output transmitter wave shape becomes more sinusoidal, and therefore reduces harmonic injection to the line. The dead zone makes the transition step more gradual at the edges. And since the load is inductive, current continues to flow through the bridge through the bridge clamping diodes (D22, D23, D32, and D33) during the dead period, creating rounder edges and therefore more a sinusoid effect.
    TABLE 7
    Duration Q2 Q3
    12 us ON off
     3 us (dead space) off off
    12 us off ON
     3 us (dead space) off off
    12 us ON off
     3 us (dead space) off off
    12 us off ON
     3 us (dead space) off off
  • Dead Space can be implemented in ASIC hardware or in discrete circuitry. The ASIC can use a binary counter and specify certain count states as “off” states. Discrete circuitry can be designed so that the base drive has a delayed turn on but synchronized turn-off.
  • The overall design of the transmitter circuit is to drive a toroid coil using a transistor bridge circuit using transistors Q2, Q3, Q4, and Q5. The control signals are PLCX1 and PLCX2.
  • The base drive design for Q2 is explained below. Since the base drives of Q2, Q3, Q4, and Q5 are identical or complementary, it is sufficient to discuss only the base drive of Q2. Capacitor C9 provides AC coupling between the transistor base and the control signal.
  • This serves at least two functions:
  • (1) Transistor protection due to control signal failure. If PLCX1 was temporarily stuck in high impedance or at some intermediate voltage level (2.5V for example), Q2 and Q3 would turn on. This short-circuits the power supply through these devices and quickly damages these devices. The AC coupling deactivates the circuit under any situation where PLCX1 or PLCX2 gets locked into any static state.
  • (2) The AC coupling also reduces transition heat. In the absence of Dead Space hardware, the AC coupling reduces transition heat by forcing a faster switch off time for Q2 and Q3. When PLCX1 transitions from high to low, the opposite side of C9 transitions below ground. This negative voltage is impressed upon the base of Q2 through D28. Charge is pulled out of the base of Q2 making the switch off far more rapid.
  • PLC Line Injection
  • PLC is injected into the line through series capacitors C4, C5, and C6 (see FIG. 11A). These capacitors block the generated PLC signal from high voltage. But unless C4/C5/C6 is very large, the impedance of the series capacitance weakens the signal substantially. Unfortunately, capacitors of large values, high AC voltage blocking, and board mount size are rare and expensive. Therefore, an inductor L3 is placed in series with the capacitor to cancel some of its impedance. For lower voltage applications (e.g., 120V), only one capacitor is required for line blockage allowing for a smaller inductance to be used. For medium level voltages (e.g., 220V, 347V), C4 and C5 must be used. For the highest level of voltages (e.g., 480V, 600V), all three capacitors must be used. Therefore, by building the PLC injection circuit to match the line voltage requirement, signal strength can be maximized while costs are minimized.
  • C4, C5, C6, and L3 also act as an LC filter. For narrow band applications, a larger capacitance and smaller inductance is used. For broader band, smaller capacitance and larger inductance is used. Furthermore, another capacitor (not shown) can be placed at the CV/CN inputs. This offers yet another pole of filtering, if desired. This part can be mounted on the PCB or placed in the wiring harness.
  • Pulse Circuit
  • The Pulse Circuit controls external relays and counts contact closures. External relay control gives the utilities access to external events such as turning off power to the house or controlling other appliances. Contact closure reading enables other metering quantities such as gas and water to be monitored. The Pulse Circuit monitors these quantities in the absence of electric service. Normally, all services (such as gas, water and electricity) are active. Because of a battery-backed supply, gas and water are still accurately monitored in the absence of electric service. The circuit is shown in the central portion of FIG. 11A.
  • Contact Closure Read: The contact points are isolated from the main circuit through optical isolators and a pulse transformer. A remote microprocessor U4 polls the contact closures through a pulse transformer. Any contacts that are closed will activate the corresponding optical isolator (OPT3-OPT6) and shorts out the capacitors (C11-C14). The microprocessor reads the voltage on these capacitors to know which contacts were closed.
  • The pulse circuit is normally powered by +5VDC (through D5). But when +5VDC is not available, the battery supply (through D8) becomes the power supply of the pulse circuit. Because the minimum required voltage of the microprocessor is very close to the system battery voltage, care is preferably taken to maximize supply voltage. A schottky diode (D8) is used to minimize drop. A separate power feed (D6 and D7) is used to power the pulse charger, whose voltage is held by C19. This capacitor is charged through a current limiting resistor R52 to minimize voltage dips due to battery resistance. When the microprocessor activates Q1, C19 dumps charge into the pulse transformer, thereby providing the interrogating voltage.
  • Relay Control Output: The Pulse Circuit also outputs relay control through OPTA and OPTB. An optical triac, optical dry contact output, or +5VDC output are optional output controllers.
  • Communication to Pulse Circuit: The microprocessor performs serial communication with the ASIC by means of the lines PO2, PO1, and PI1. The main processor therefore has access to each of the accumulator registers and has control of the output relay channels.
  • Expanded Pulse Readers: FIG. 17C shows a schematic of a preferred pulse expansion circuit. The input circuits are duplicated three times on the board for expanded metering capability. To distinguish one processor from the next, diodes D17, D19, and D21 serve to uniquely identify position. This allows all 12 inputs to be unique. In addition, four pulse boards can be serially chained to create 48 independent inputs. To distinguish the four boards, jumpers are placed in H2, H3, H4, and H5 for the processor to identify.
  • KYZ Circuit
  • The KYZ circuit provides an equivalent dry contact closure that can handle 120VAC at the input. To prevent any momentary short circuits across the terminals Y and Z, circuitry enforces a dead period between transitions. FIG. 11B provides a KYZ schematic diagram.
  • The metering quantity is output through the LED signal and buffered through U2C. This waveform passes through an RC filter which slopes the edges of the square signal. This signal passes to comparators U2A and U2B. Only when the signal has traveled above 4.5V will U2B trigger causing Y to contact K. Only when the signal has traveled below 0.5V will U2A trigger causing Z to contact K. In the 0.5V to 4.5V zone, no contact is made, thereby enforcing the dead period and preventing momentary short circuits.
  • Mini-Closet (5A)
  • The Minicloset(MC) monitors a mass number of electrical metering points, saving cost and space. The price per metering point is much cheaper. Also in high-rise installations, often entire rooms are required in order to hold all the electrical meters. Because of the compact design of the MC, only a small closet is required for all the metering points. This frees up for building management extra rooms that would have otherwise been allocated for meter mounting.
  • The 5A minicloset (MC) preferably monitors 24 metering points from one device. With internal 5A to 0.1A current transformers, the MC receives current as high as 5A. The MC also utilizes Internal Metering and stores its data in FLASH memory. The schematic diagram of the minicloset interface (MCI) board is shown in FIGS. 15B and 15C.
  • The main processor communicates to a remote microprocessor U1 and specifies which current channels to read. U1 controls the analog multiplexer (U2-U7) and gates in the desired CT outputs to the current sensing circuit.
  • The MC can also monitor higher current levels if external CTs are used to step down the current.
  • Scan Transponders
  • A Scan Transponder (ST) is used to communicate to each of the meters in a PLC system to collect data. The Transponder Power Board Circuit can be found in FIG. 11A. The transponder consists of four PLC communication channels: three channels to communicate along the three phases of the distribution transformer and a fourth phase to communicate along a medium tension line. The main processor communicates to the remote processor U1 through PO1, PO2, and PI1 to control the gating of the transmitters and the receivers.
  • The Scan Transponder collects data from the meters by sequentially polling each meter on a scheduled basis and copying the data to its memory. The ST can be optionally equipped with a large memory display board. The transponder can monitor electricity as well (i.e., function as an end user meter). The transponder has the ability to store additional data with an optional larger FLASH memory display board. The transponder can also periodically dump data to an even larger memory source such as a personal computer by means of a modem or a serial connection.
  • The ST requires that the serial numbers of each meter be cross referenced in its memory. This enables the ST to identify any meter in its cross reference table that is non-communicating. The ST also seeks optimal transfer by searching all phase, speed, and modulation combinations.
  • Optical Reader
  • An Optical Reader circuit is shown in FIG. 16. This circuit is designed for a battery source. The design uses a two stage constant current source to provide increased communication rate with transistor circuitry (Q1 and Q2).
  • Theft Detection
  • Reports indicate energy theft of 10% to 30% in some areas. A theft detection embodiment of the present invention is based on the hypothesis that theft is not evenly spread among end users. Instead, there are probably some customers who steal 50% of their energy, some who steal 100%, and many who do not steal at all. Each distribution transformer in a power distribution network can easily supply energy to hundreds of customers. Theft detection meters are preferably placed at strategic points to narrow the theft detection zone in the following ways: (1) based on the population of end users—to pinpoint known customers who are stealing; and (2) geographical area—to narrow the search area for illegal tapping.
  • Furthermore, in a 300 customer service area, a non-paying customer with average usage represents only a 0.3% variation in the total energy. Narrowing the theft detection zone increases the detection sensitivity. If 20 equal zones are monitored, the 0.3% variation suddenly registers as a 6% variation in one theft detection zone.
  • The distribution transformer in FIG. 23 has twelve monitoring points coming from the four feeders and each of the three phases. The meters M1-M4 that monitor these points and are called Feeder Meters. By metering these 12 points, the theft detection zone reduces to 1/12 of the original metering points. In addition, Node Meters M5, M6, M7, and M8 further section the North branch into more detection zones. If all four feeders were sectioned into just three zones, there would be 36 different detection regions, sectioning 300 customers into 8 or 9 customer portions. For example, theft is determined in Zone 1 if energy theft is detected in M1 but not M5 and M6.
  • For the purpose of theft detection, a three phase (3φ) customer is treated as a customer with three 1φ services. This isolates the energy measurement cleanly between the phases. But for the sake of accurate demand billing, 3φ customers must be 3φ metered. If separate phases achieved equal peak demand but in non-coincident demand intervals, the customer who was billed as three 1φ could be overcharged for demand. Thus, a preferred 3φ meter is capable of being read either as three 1φ meters or one 3φ meter, thereby satisfying both conditions. Likewise a minicloset can be considered as twenty-four 1φ meters and a 2φ meter can be considered as two 1φ as well. This enables the Theft Detection system to work with customers of 1φ, 2φ, and 3φ meters and of 24φ Mini-closets, including any combination of such customers.
  • A transponder T, located at the distribution transformer, gathers meter data from all Feeder Meters PF, Node Meters PN, and the End User Meters.
  • This system accomplishes the following: (1) isolation of theft location to a very small circuit branch; and (2) isolation of theft instance in time.
  • Isolation of theft location comprises the following steps:
  • (1) Check node meters that are furthest out, ones that have no other node meters in their branch. Here, M7, M8, and M5. A node meter consumption that registers higher than the sum of its end user meters indicates theft.
  • (2) Check node branches that are closer to the generator. Here, M6. Consumption in M6 that registers higher than the sum of M5, M6, and any end users in this zone indicates theft.
  • (3) Keep checking node branches down until node branches are the feeder wires themselves from the generator.
  • Isolation of theft instance in time: Using interval metering, theft detection can be applied to each metering interval to isolate the theft instance. The precision of time identification is determined by the metering interval.
  • Theft network mapping: theft detection requires a network map of all meters interconnections. However since an accurate electrical routing diagram from the distribution transformer is not always available, there is need for a mapping scheme. A Theft Detection Mapping System of a preferred embodiment performs the following tasks: (1) stores data identifying all Feeder, Node, and End User Meters; (2) associates End User Meters to Node branch and Feeder Meters; and (3) identifies the phase arrangement of multi-phase meters. For example, in a three-phase meter, phase 1 of the distribution transformer output might not be connected to phase 1 of the meter. This too needs to be recorded in the network map.
  • The network mapping system does not have to be included in the permanent installation. After mapping is done, the transponder remembers the position of all of the meters, and the mapping system can be recycled to map other distribution transformers. A personal computer (PC1) is preferably the master controller of the mapping process. Inductive couplers are place on feeder wires and node wires to identify return PLC signal strength. The outputs of these inductors are multiplexed (under control of PC1) through a sharp bandpass filter and into a DVM (such as HP34401A). PC1 reads the signal level from the DVM through the IEEE bus.
  • Meter identification: PC1 instructs the transponder to gather the serial numbers of all meters that exist on the network. The transponder sequentially requests an echo from the active meters on all three phases. When a meter receives the request from the transponder, it sends back its serial number to the transponder.
  • End user meter (phase) mapping: 1φ meter—The phase that the transponder reads with the greatest signal strength is metering phase of this meter. Alternatively, the phase can be determined in another way. The bit rate must be set equal to the line frequency. Because of phase lock, the bit transitions occur at the zero crossings of the line voltage. If the return signal from the meter has zero-crossings with the transponder metering phases, then the meter is said to be on transponder phase A (TφA). If there is a +120° shift, it is said to be on transponder phase B (TφB). And the remaining phase is transponder phase C (TφC).
  • 3φ meter—Because Phase 1 of the meter might not be connected to Phase 1 of its Node Meter, mapping is required to identify phase arrangement. Like the 1φ meter, the transponder sends out a PLC signal with the bit rate equaling the line frequency. But this time it is the 3φ meter that compares the PLC bit-transitions to the zero crossings of each of their metering phases. From these comparisons, the meter determines which metering phases are connected to TφA, TφB, and TφC. The Node Meter repeats the process to identify the phase mapping relationship. These relationships are transmitted back to the transponder to correlate the phases of the Node meters with its 3φ meter.
  • Feeder mapping: PC1 communicates to the transponder through its optical port to instruct a meter to send a 30-second message. The computer PC1 polls each of the couplers for signal strength. The coupler with the strongest signal indicates feeder position.
  • Node mapping: Starting at the farthest node meters, couplers are placed at these meters and checked for signal strength returning from the meter. If a signal is not present, couplers are moved down one node at a time and are again tested for return signal strength. The process repeats until all nodes are mapped.
  • In a further embodiment, mapping the locations of meters is used to locate line breakages. This embodiment comprises a method of determining the location of a break in a powerline electricity distribution network that has microprocessor-controlled end user electricity meters operative to communicate with a remotely located computer. The method comprises the steps of: (1) mapping the location of each end user meter; (2) periodically receiving data from each end user meter in response to a query to that meter; (3) when a plurality of meters in the same branch of the network fail to report during a given period, querying meters in neighboring branches to pinpoint the location of a break. Such queries, used in conjunction with the network map, will locate the break (at least to the resolution provided by the locations of the query-able meters) in a few seconds, thus reducing the time typically required to find a break by having line repair personnel visually inspect the lines until the break is spotted.
  • In a further embodiment, a personal computer (PC) is connected to a Scan Transponder and issues commands to the ST to continuously sequentially poll each meter for an echo. When multiple meters fail to echo, the ST correlates the serial numbers of these meters on an electrical distribution map (obtained by the Theft Detection mapping scheme, for example). If the non-communicating meters lie on the same distribution path, the PC hypothesizes that there is power line breakage at the point on the map where the meters fail to communicate.
  • Virtual Meter
  • In a preferred embodiment (an example using an Automatic Transfer Switch (ATS) is depicted in FIG. 24), a single meter can monitor consumption from two or more sources—for example, a utility and a local generator—and store the data into separate corresponding sets of data registers. In the example illustrated in FIG. 24, a logical control signal line from the ATS is connected to the meter. When power comes from the utility, the meter stores metering data into a first set of data registers. When utility power is interrupted and the ATS delivers power from the local generator, the control line from the ATS triggers the meter to store metering data into a second set of data registers. When utility service is restored, the ATS switches the power source back to the utility and releases the control line; metering data is once again stored in the first set of data registers. Those skilled in the art will recognize that this embodiment can be applied to more general situations wherein there are multiple power sources and the meter receives a signal indicating when to switch metering data storage to another set of data registers.
  • Credit and Prepay Meters
  • Credit and Prepay meters of a preferred embodiment address the problems with present credit and prepay systems. No operator is needed to enter the house since all transactions are performed by PLC. Fraud-prone swipe cards are not needed since a remote utility operator handles the energy purchase and deposits the amount to the meter by PLC.
  • Prepay Meters: In a prepay embodiment of a preferred system, energy is purchased by an end user customer from a system operator (typically, a utility operator) in advance. The operator deposits the purchased energy to the customer's meter by PLC. When the customer has reached his prepaid limit, the meter cuts power to the household. The LCD display preferably alternates (i.e., displays each for a pre-defined period, then displays another) between the following displays, for example: (1) “Deposit $50 01/23/01”; (2) “Remaining $23.45” (present amount remaining); and (3) “Estimated Cutoff 11:43 02/28/01” (based on present consumption).
  • Credit Meters: In a credit embodiment of a preferred system, energy is purchased on credit. When the customer fails to pay his bill, an operator can terminate power by instructing the meter through PLC. The LCD display alternates between displaying the following quantities, for example: (1) “Last Bill: $62.53 12/15/00”; (2) “Consumption: 45623.453 kWhr” (consumption on last bill); (3) “Projected Bill: $59.35 01/23/01” (1/23/01 is end of present billing cycle); and (4) “Cost per kWhr $0.15.”
  • In a preferred embodiment, an operator also, when desired, remotely programs meters to cut off power when certain parameters are met or exceeded. For example, a customer with inferior credit may have his power temporarily discontinued when he uses 10 amps, when he uses 5 amps, or when his allotted consumption level is exceeded. The hardware and methodology for such remote programming are disclosed above.
  • Printing Meter
  • In a further embodiment, submeters are equipped with printers. In this embodiment, the utility still polls the meters for data through PLC and therefore has control over billing information. The utility calculates the bill and data is downloaded to the meter for local printing. Since the local printer is under utility control, the utility can initiate the printing of other messages through PLC as well. Such other messages may include billing receipts, rate changes, and usage profiles.
  • This is a useful feature in situations where it is inconvenient for a meter reader to enter the house to read the meter (for example, in countries or cultures where a male meter reader is not permitted to read the meter if the husband is not at home), or where local mail service is not reliable for sending invoices.
  • Disabling Customers Using GFI
  • This embodiment allows a utility to inexpensively disconnect a customer by taking advantage of an existing Ground Fault Interrupt (GFI) capable of interrupting power to the customer. For example, in Europe most residential customers are equipped with a whole-home GFI. The GFI is a protective circuit that shuts down power during anomalous current flow. In a preferred embodiment, when the utility wants to remove service to a customer, the utility sends a PLC signal to the meter. The meter then activates the GFI with onboard circuitry. The utility may want to deactivate customers for demand-side management applications or when customers fail to pay their bills.
  • The meter preferably trips the GFI (see FIG. 25) either by (1) initiating a small leakage to earth ground, or (2) coupling a small amount of current into the GFI toroid.

Claims (6)

1-62. (canceled)
63. A method of remotely controlling electrical power service to an end user protected by a ground-fault interrupter (GFI), comprising the steps of:
(a) determining that said end user's electricity service must be discontinued; and
(b) sending a power line communication instruction to a microprocessor-controlled meter that meters said end user's electricity consumption, wherein said instruction directs said meter to activate said GFI.
64. A method as in claim 63, wherein said instruction further directs said meter to continue to activate said GFI until directed otherwise.
65. A method as in claim 63, wherein said meter is configured to activate said GFI by initiating a leakage to earth ground.
66. A method as in claim 63, wherein said GFI comprises a toroid and wherein said meter is configured to activate said GFI by coupling a small amount of current into said toroid.
67-68. (canceled)
US11/431,849 2000-02-29 2006-05-09 System and method for on-line monitoring and billing of power consumption Expired - Fee Related US7539581B2 (en)

Priority Applications (11)

Application Number Priority Date Filing Date Title
US11/431,849 US7539581B2 (en) 2000-02-29 2006-05-09 System and method for on-line monitoring and billing of power consumption
US11/600,234 US7596459B2 (en) 2001-02-28 2006-11-14 Apparatus and methods for multi-channel electric metering
PCT/US2006/044762 WO2007094837A2 (en) 2005-11-15 2006-11-15 Apparatus and methods for multi-channel metering
PL06849894T PL1960932T3 (en) 2005-11-15 2006-11-15 Apparatus and methods for multi-channel metering
CN200680049289XA CN101351803B (en) 2005-11-15 2006-11-15 Apparatus and methods for multi-channel metering
EP06849894.8A EP1960932B1 (en) 2005-11-15 2006-11-15 Apparatus and methods for multi-channel metering
ES06849894.8T ES2554499T3 (en) 2005-11-15 2006-11-15 Devices and procedures for multi-channel measurement
ARP060105013A AR057593A1 (en) 2005-11-15 2006-11-15 APPLIANCE AND METHODS FOR MEASURING MULTIPLE CHANNELS
US12/338,878 US20090132096A1 (en) 2000-02-29 2008-12-18 System and method for on-line monitoring and billing of power consumption
US12/541,852 US8090549B2 (en) 2001-02-28 2009-08-14 Apparatus and methods for multi-channel metering
US13/199,664 US8452555B2 (en) 2001-02-28 2011-09-06 Apparatus and methods for multi-channel metering

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US18583200P 2000-02-29 2000-02-29
US09/795,838 US6947854B2 (en) 2000-02-29 2001-02-28 System and method for on-line monitoring and billing of power consumption
US11/030,417 US7054770B2 (en) 2000-02-29 2005-01-06 System and method for on-line monitoring and billing of power consumption
US11/431,849 US7539581B2 (en) 2000-02-29 2006-05-09 System and method for on-line monitoring and billing of power consumption

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
US09/795,838 Division US6947854B2 (en) 2000-02-29 2001-02-28 System and method for on-line monitoring and billing of power consumption
US11/030,417 Division US7054770B2 (en) 2000-02-29 2005-01-06 System and method for on-line monitoring and billing of power consumption

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US11/600,234 Continuation-In-Part US7596459B2 (en) 2001-02-28 2006-11-14 Apparatus and methods for multi-channel electric metering
US12/338,878 Continuation US20090132096A1 (en) 2000-02-29 2008-12-18 System and method for on-line monitoring and billing of power consumption

Publications (3)

Publication Number Publication Date
US20060259254A1 US20060259254A1 (en) 2006-11-16
US20090099801A9 true US20090099801A9 (en) 2009-04-16
US7539581B2 US7539581B2 (en) 2009-05-26

Family

ID=27737026

Family Applications (4)

Application Number Title Priority Date Filing Date
US09/795,838 Expired - Lifetime US6947854B2 (en) 2000-02-29 2001-02-28 System and method for on-line monitoring and billing of power consumption
US11/030,417 Expired - Lifetime US7054770B2 (en) 2000-02-29 2005-01-06 System and method for on-line monitoring and billing of power consumption
US11/431,849 Expired - Fee Related US7539581B2 (en) 2000-02-29 2006-05-09 System and method for on-line monitoring and billing of power consumption
US12/338,878 Abandoned US20090132096A1 (en) 2000-02-29 2008-12-18 System and method for on-line monitoring and billing of power consumption

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US09/795,838 Expired - Lifetime US6947854B2 (en) 2000-02-29 2001-02-28 System and method for on-line monitoring and billing of power consumption
US11/030,417 Expired - Lifetime US7054770B2 (en) 2000-02-29 2005-01-06 System and method for on-line monitoring and billing of power consumption

Family Applications After (1)

Application Number Title Priority Date Filing Date
US12/338,878 Abandoned US20090132096A1 (en) 2000-02-29 2008-12-18 System and method for on-line monitoring and billing of power consumption

Country Status (1)

Country Link
US (4) US6947854B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090292402A1 (en) * 2008-04-14 2009-11-26 Cruickshank Iii Robert F Method & apparatus for orchestrating utility power supply & demand in real time using a continuous pricing signal sent via a network to home networks & smart appliances
US20110166839A1 (en) * 2011-02-10 2011-07-07 Christian Smith Method and system for the estimating the energy consumption of commercially available electrical devices
WO2016016827A3 (en) * 2014-07-30 2016-03-24 Universiti Brunei Darussalam Managing energy meter usage feedback
US20160172827A1 (en) * 2013-07-16 2016-06-16 Miguel BATISTA OLIVEIRA COSTA LEAL System for operating and monitoring power cables

Families Citing this family (188)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6947854B2 (en) * 2000-02-29 2005-09-20 Quadlogic Controls Corporation System and method for on-line monitoring and billing of power consumption
JP2002092098A (en) * 2000-09-20 2002-03-29 Hitachi Ltd Method for recovering energy saving facility cost and system for the same
US6847300B2 (en) * 2001-02-02 2005-01-25 Motorola, Inc. Electric power meter including a temperature sensor and controller
EP1371219A4 (en) * 2001-02-14 2006-06-21 Current Tech Llc Data communication over a power line
US7596459B2 (en) 2001-02-28 2009-09-29 Quadlogic Controls Corporation Apparatus and methods for multi-channel electric metering
US20020198629A1 (en) * 2001-04-27 2002-12-26 Enerwise Global Technologies, Inc. Computerized utility cost estimation method and system
US7385524B1 (en) 2001-09-21 2008-06-10 James Robert Orlosky Automated meter reading, billing and payment processing system
US7111179B1 (en) * 2001-10-11 2006-09-19 In-Hand Electronics, Inc. Method and apparatus for optimizing performance and battery life of electronic devices based on system and application parameters
JP4051534B2 (en) * 2002-01-29 2008-02-27 株式会社日立製作所 Substation system
US7436321B2 (en) * 2002-12-10 2008-10-14 Current Technologies, Llc Power line communication system with automated meter reading
US20040225626A1 (en) * 2003-05-07 2004-11-11 Brian Forrester Automated meter reading installation system and method
US20040243525A1 (en) * 2003-05-07 2004-12-02 Brian Forrester System and method for disconnecting utility services
US7742393B2 (en) * 2003-07-24 2010-06-22 Hunt Technologies, Inc. Locating endpoints in a power line communication system
US7236765B2 (en) 2003-07-24 2007-06-26 Hunt Technologies, Inc. Data communication over power lines
US7180412B2 (en) 2003-07-24 2007-02-20 Hunt Technologies, Inc. Power line communication system having time server
US7145438B2 (en) * 2003-07-24 2006-12-05 Hunt Technologies, Inc. Endpoint event processing system
US7034662B2 (en) * 2003-09-15 2006-04-25 Rockwell Automation Technologies, Inc. Multi-function integrated automation cable system and method
US8234876B2 (en) * 2003-10-15 2012-08-07 Ice Energy, Inc. Utility managed virtual power plant utilizing aggregated thermal energy storage
WO2005040992A2 (en) * 2003-10-24 2005-05-06 Square D Company Intelligent power management control system
NZ530254A (en) * 2003-12-16 2006-10-27 Pulse Utilities Ltd A power line communication system and an intelligent meter therefor
KR100561749B1 (en) * 2004-03-12 2006-04-04 주식회사 젤라인 A power line communication based service addition type meter gateway and a casing structure thereof, a power line communication system and a method using the same
AR047212A1 (en) * 2004-08-03 2006-01-11 Coesp Ltda Componentes Eletric METHOD FOR SECTIONING A HALF-POWERED ELECTRIC POWER DISTRIBUTION LINE WITH A SECTIONER THAT PRESENTS A PERTUBATION, HALF-POWERED ELECTRIC POWER DISTRIBUTION LINE SECTIONER FOR THE SAME AND ELECTRONIC CIRCUIT OF DETECTION OF A CURRENT FAILURE CURRENT
US7227451B2 (en) * 2004-08-04 2007-06-05 Quadlogic Controls Corporation Method and system for radio-frequency signal coupling to medium tension power lines with auto-tuning device
US20060082315A1 (en) * 2004-10-20 2006-04-20 Timothy Chan Method and system for attachment of light emmiting diodes to circuitry for use in lighting
US7252543B2 (en) * 2004-12-08 2007-08-07 General Electric Company Methods and systems for measuring system loads and sub-metering electric power distribution
US7351062B2 (en) * 2004-12-17 2008-04-01 Learning Resources, Inc. Educational devices, systems and methods using optical character recognition
US7276915B1 (en) * 2005-02-01 2007-10-02 Sprint Communications Company L.P. Electrical service monitoring system
US7856032B2 (en) * 2005-04-04 2010-12-21 Current Technologies, Llc Multi-function modem device
US7616896B2 (en) * 2005-09-07 2009-11-10 Probetec Wireless optical data probe
JP2007094644A (en) * 2005-09-28 2007-04-12 Toshiba Corp Activity prediction method and device
ES2293799B1 (en) * 2005-10-07 2008-11-01 Ziv Aplicaciones Y Tecnologia, S.A. PLUG SWITCH SYSTEM REGULATED BY THE COUNTER.
US7460931B2 (en) * 2005-10-07 2008-12-02 Jay Jacobson Method and system for improving the efficiency and reliability of a power grid
PL1960932T3 (en) * 2005-11-15 2016-03-31 Quadlogic Controls Corp Apparatus and methods for multi-channel metering
US20070194949A1 (en) * 2005-11-23 2007-08-23 Quadlogic Controls Corporation Systems and methods for electricity metering
FI122463B (en) * 2005-12-02 2012-01-31 Teknologian Tutkimuskeskus Vtt Method and apparatus for remote reading of an energy meter
US7769149B2 (en) * 2006-01-09 2010-08-03 Current Communications Services, Llc Automated utility data services system and method
US20080012724A1 (en) * 2006-01-30 2008-01-17 Corcoran Kevin F Power line communications module and method
US7366773B2 (en) * 2006-01-30 2008-04-29 Dgi Creations, Llc Alternative communications paths for data sent over power line carrier
CA2535848A1 (en) * 2006-02-10 2007-08-10 Roger Morrison Electrical profile monitoring system for detection of utilities theft
US8095475B2 (en) * 2006-03-23 2012-01-10 Exceleron Software, Inc. System and method for prepay account management system
CA2583057A1 (en) * 2006-03-31 2007-09-30 Itron, Inc. Integrated data collection, anomaly detection and investigation, such as integrated mobile utility meter reading, theft detection and investigation system
US8690117B2 (en) 2006-05-04 2014-04-08 Capstone Metering Llc Water meter
AU2007247918B2 (en) * 2006-05-04 2011-07-21 Capstone Mobile Technologies, Llc System and method for remotely monitoring and controlling a water meter
US20080091626A1 (en) * 2006-10-17 2008-04-17 Gary Kremen Systems, methods and financial instruments for renewable energy consumer premises equipment financing
US20080091580A1 (en) * 2006-10-17 2008-04-17 Gary Kremen Methods for cost reduction and underwriting considerations for financing renewable energy consumer premises equipment (CPE)
US7890436B2 (en) * 2006-10-17 2011-02-15 Clean Power Finance, Inc. Billing and payment methods and systems enabling consumer premises equipment
US20080091590A1 (en) * 2006-10-17 2008-04-17 Gary Kremen Methods, systems and financial instruments for financing renewable energy consumer premises equipment
US20080091589A1 (en) * 2006-10-17 2008-04-17 Gary Kremen Method for underwriting the financing of solar consumer premises equipment
US7795877B2 (en) * 2006-11-02 2010-09-14 Current Technologies, Llc Power line communication and power distribution parameter measurement system and method
US9031874B2 (en) * 2007-01-12 2015-05-12 Clean Power Finance, Inc. Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment
US7698219B2 (en) * 2007-01-12 2010-04-13 Clean Power Finance, Inc. Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment
US8064826B2 (en) * 2007-01-31 2011-11-22 Broadcom Corporation Intra-device RF bus and control thereof
US7333003B1 (en) 2007-04-24 2008-02-19 Telkonet, Inc. Power line coupler adapted for use with multiple electric power meters
CA2692864C (en) * 2007-07-13 2017-05-16 Kinects Solutions Inc. Transformer meter and system for using same
US20090024541A1 (en) * 2007-07-20 2009-01-22 Gary Kremen Power purchase methods, agreements and financial instruments for tax-advantaged financing residential renewable energy equipment
US8094034B2 (en) * 2007-09-18 2012-01-10 Georgia Tech Research Corporation Detecting actuation of electrical devices using electrical noise over a power line
US7622911B2 (en) * 2007-10-18 2009-11-24 Intellimeter Canada, Inc. Electrical power metering device and method of operation thereof
BRPI0705720A2 (en) * 2007-10-23 2009-06-23 Queiroz Silva Renato De (cat catch) - intelligent self-tracking differential system (processes, components and schematics) supervised by gps or reverse geocoding
US20090125351A1 (en) * 2007-11-08 2009-05-14 Davis Jr Robert G System and Method for Establishing Communications with an Electronic Meter
US8000913B2 (en) * 2008-01-21 2011-08-16 Current Communications Services, Llc System and method for providing power distribution system information
KR100960503B1 (en) * 2008-02-05 2010-06-01 엘에스산전 주식회사 Electronic smart meter enabling demand response and method for demand response
US8368351B2 (en) 2008-04-09 2013-02-05 Qualcomm Incorporated Transmission line directional awareness for a charging station
EP2281333A2 (en) 2008-04-09 2011-02-09 Intellon Corporation Transmission line directional awareness
US8239073B2 (en) * 2008-04-17 2012-08-07 Asoka Usa Corporation Systems and methods for controlling energy consumption
US20090299919A1 (en) * 2008-05-27 2009-12-03 Frutkin Christopher J Calculating utility consumption of at least one unit of a building
US8159210B2 (en) * 2008-07-11 2012-04-17 Kinects Solutions, Inc. System for automatically detecting power system configuration
US20100052874A1 (en) * 2008-09-01 2010-03-04 Hico Technology Co., Ltd. Open-loop monitoring system
US20100122945A1 (en) * 2008-11-17 2010-05-20 David Williamson Grey water conservation mechanism
MX2011005756A (en) * 2008-12-03 2011-09-06 Sensus Usa Inc System and method for determining a load ' s phase in a three-phase system.
US8143879B2 (en) * 2008-12-30 2012-03-27 General Electric Company Meter phase identification
WO2010105038A1 (en) 2009-03-11 2010-09-16 Trilliant Networks, Inc. Process, device and system for mapping transformers to meters and locating non-technical line losses
US20100262393A1 (en) * 2009-04-08 2010-10-14 Manu Sharma System and Method for Determining a Phase Conductor Supplying Power to a Device
US20100262395A1 (en) * 2009-04-08 2010-10-14 Manu Sharma System and Method for Determining a Phase Conductor Supplying Power to a Device
US8577510B2 (en) 2009-05-07 2013-11-05 Dominion Resources, Inc. Voltage conservation using advanced metering infrastructure and substation centralized voltage control
US8600556B2 (en) 2009-06-22 2013-12-03 Johnson Controls Technology Company Smart building manager
US8532839B2 (en) * 2009-06-22 2013-09-10 Johnson Controls Technology Company Systems and methods for statistical control and fault detection in a building management system
US11269303B2 (en) 2009-06-22 2022-03-08 Johnson Controls Technology Company Systems and methods for detecting changes in energy usage in a building
US9286582B2 (en) 2009-06-22 2016-03-15 Johnson Controls Technology Company Systems and methods for detecting changes in energy usage in a building
US9606520B2 (en) 2009-06-22 2017-03-28 Johnson Controls Technology Company Automated fault detection and diagnostics in a building management system
US9196009B2 (en) 2009-06-22 2015-11-24 Johnson Controls Technology Company Systems and methods for detecting changes in energy usage in a building
US8788097B2 (en) 2009-06-22 2014-07-22 Johnson Controls Technology Company Systems and methods for using rule-based fault detection in a building management system
US10739741B2 (en) 2009-06-22 2020-08-11 Johnson Controls Technology Company Systems and methods for detecting changes in energy usage in a building
US8532808B2 (en) * 2009-06-22 2013-09-10 Johnson Controls Technology Company Systems and methods for measuring and verifying energy savings in buildings
US8731724B2 (en) 2009-06-22 2014-05-20 Johnson Controls Technology Company Automated fault detection and diagnostics in a building management system
US9753455B2 (en) 2009-06-22 2017-09-05 Johnson Controls Technology Company Building management system with fault analysis
JP5278197B2 (en) * 2009-06-29 2013-09-04 ソニー株式会社 Non-contact communication device and non-contact communication method
US9766277B2 (en) 2009-09-25 2017-09-19 Belkin International, Inc. Self-calibrating contactless power consumption sensing
AU2010303421A1 (en) 2009-10-07 2012-05-10 Rain Bird Corporation Volumetric budget based irrigation control
US8243423B2 (en) * 2009-10-30 2012-08-14 Eaton Corporation Expandable meter center employing digital electronic meter assemblies
US20110101956A1 (en) * 2009-11-04 2011-05-05 David Wayne Thorn Electricity Usage Monitor System
US8626462B2 (en) * 2009-12-02 2014-01-07 General Electric Company Phase identification system and method
DE102011000593B4 (en) * 2010-02-11 2014-09-11 Delta Control Gesellschaft für Automation mbH Method and device for detecting electrical performance data
US8681015B1 (en) * 2010-06-25 2014-03-25 Tellabs Operations, Inc. Method and apparatus for collecting data from automatic meter reading for smart power grid
US8333316B2 (en) * 2010-06-30 2012-12-18 Google Inc. Recording the power distribution hierarchy in datacenters
US9291694B2 (en) 2010-07-02 2016-03-22 Belkin International, Inc. System and method for monitoring electrical power usage in an electrical power infrastructure of a building
US8972211B2 (en) 2010-07-02 2015-03-03 Belkin International, Inc. System for monitoring electrical power usage of a structure and method of same
EP2413105B1 (en) * 2010-07-29 2017-07-05 Power Monitors, Inc. Method and apparatus for a demand management monitoring system
US10060957B2 (en) 2010-07-29 2018-08-28 Power Monitors, Inc. Method and apparatus for a cloud-based power quality monitor
CA2804012A1 (en) * 2010-08-10 2012-02-16 Sensus Usa Inc. Electric utility meter comprising load identifying data processor
US9213050B2 (en) * 2010-08-30 2015-12-15 Sharp Laboratories Of America, Inc. Delayed meter reporting
US9258627B2 (en) * 2010-09-10 2016-02-09 Southern Company Services, Inc. Locating utility metering devices
US9030334B2 (en) * 2010-09-10 2015-05-12 Southern Company Services, Inc. Locating utility metering devices
CN102402496B (en) * 2010-09-17 2015-07-01 光宝电子(广州)有限公司 Communication circuit and adapter with same
EP2439496A1 (en) * 2010-10-06 2012-04-11 Alcatel Lucent Detection of loss in electrical distribution networks
GB201018456D0 (en) * 2010-11-01 2010-12-15 Northern Design Electronics Ltd Improvments in metering
CN102486330B (en) * 2010-12-03 2014-07-23 湖南大学 Intelligent air-conditioner adjusting device based on active security response of user
US20120166233A1 (en) * 2010-12-22 2012-06-28 Alcatel-Lucent Usa Inc. Method And Apparatus For Enhancing Consumer Awareness Of Utility Consumption And Cost Data
BRPI1005073A2 (en) * 2010-12-29 2013-04-16 Light Servicos De Eletricidade Sociedade Anonima electric power meter binding device and remote consumption display
US20120176119A1 (en) * 2011-01-06 2012-07-12 General Electric Company Phase line identification system and method
JP6124410B2 (en) 2011-03-18 2017-05-10 ソネター, インク.Soneter, Inc. Fluid flow measuring method and apparatus
US8587290B2 (en) 2011-03-29 2013-11-19 General Electric Company Method, system and device of phase identification using a smart meter
WO2012142682A1 (en) * 2011-04-18 2012-10-26 "Add - Bulgaria" Ood System for remote reading, data processing, and management of the consumption of electric energy
US8619846B2 (en) * 2011-04-21 2013-12-31 Landis+Gyr Amplitude control in a variable load environment
RU2468407C1 (en) * 2011-06-17 2012-11-27 Общество с ограниченной ответственностью "Лаборатория интеллектуальных сетей и систем" (ООО "ЛИСИС") Automated system of monitoring, protection and control of equipment of electrical substation
WO2012176283A1 (en) * 2011-06-21 2012-12-27 株式会社ワコール Garment having cup part
US8682604B2 (en) 2011-08-03 2014-03-25 General Electric Company Method and system of phase identification
RU2474833C1 (en) * 2011-09-05 2013-02-10 Олег Фёдорович Меньших Device to inspect sensitivity of three-phase digital devices of power metering
RU2474834C1 (en) * 2011-09-09 2013-02-10 Олег Фёдорович Меньших Circuit to control sensitivity of three-phase electronic devices for power metering
BRPI1105842B1 (en) 2011-11-03 2016-04-26 Inácio Loiola Pereira Campos secondary distribution network control, measurement and monitoring system and process with detection of fraud and theft of electricity
EP2597426B1 (en) * 2011-11-25 2013-10-23 ubitricity Gesellschaft für verteilte Energiesysteme mbH Counting and measuring point system for measuring and counting electrical energy/electricity and method
US9418045B2 (en) 2011-12-12 2016-08-16 Mbh Consulting Ltd. Systems, apparatus and methods for quantifying and identifying diversion of electrical energy
US9941740B2 (en) 2011-12-12 2018-04-10 Mbh Consulting Ltd. Systems, apparatus and methods for quantifying and identifying diversion of electrical energy
EP2608357B1 (en) * 2011-12-19 2014-07-23 Vetco Gray Controls Limited Protecting against transients in a communication system
GB201200331D0 (en) * 2012-01-09 2012-02-22 Dialight Europ Ltd Improvements in switching contactors (II)
US9081043B2 (en) 2012-02-10 2015-07-14 Sharp Laboratories Of America, Inc. System and method for calculating power using contactless voltage waveform shape sensor
US9407326B2 (en) 2012-02-16 2016-08-02 Enphase Energy, Inc. Method and apparatus for three-phase power line communications
US9030302B2 (en) 2012-02-16 2015-05-12 Enphase Energy, Inc. Method and apparatus for three-phase power line communications
US9390388B2 (en) 2012-05-31 2016-07-12 Johnson Controls Technology Company Systems and methods for measuring and verifying energy usage in a building
WO2014001995A2 (en) * 2012-06-28 2014-01-03 Contour Technology (Pty) Ltd. Automated transaction system
US10095659B2 (en) 2012-08-03 2018-10-09 Fluke Corporation Handheld devices, systems, and methods for measuring parameters
JP6089359B2 (en) * 2012-09-28 2017-03-08 パナソニックIpマネジメント株式会社 COMMUNICATION SYSTEM, COMMUNICATION DEVICE, RELAY DEVICE, AND PROGRAM
MX2012013688A (en) * 2012-11-14 2014-05-21 Inst De Investigaciones Electricas System and method for measuring electrical energy with functions of pre-pay and data collection by means of an optical device.
US9747786B2 (en) * 2012-12-17 2017-08-29 Itron, Inc. Virtual cluster meter (VCM)
US9082291B2 (en) 2012-12-17 2015-07-14 Itron, Inc. Virtual metering with partitioned metrology
US10354520B2 (en) * 2012-12-17 2019-07-16 Itron, Inc. Power line communication over disconnected service lines
US9677907B2 (en) 2013-03-14 2017-06-13 Itron Inc Intelligent receptacle
US9553453B2 (en) 2013-03-15 2017-01-24 Dominion Resources, Inc. Management of energy demand and energy efficiency savings from voltage optimization on electric power systems using AMI-based data analysis
JP6449232B2 (en) * 2013-03-15 2019-01-09 フルークコーポレイションFluke Corporation Automatic recording and graphing of measurement data
US9678520B2 (en) 2013-03-15 2017-06-13 Dominion Resources, Inc. Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis
US9847639B2 (en) 2013-03-15 2017-12-19 Dominion Energy, Inc. Electric power system control with measurement of energy demand and energy efficiency
US9582020B2 (en) 2013-03-15 2017-02-28 Dominion Resources, Inc. Maximizing of energy delivery system compatibility with voltage optimization using AMI-based data control and analysis
US9563218B2 (en) 2013-03-15 2017-02-07 Dominion Resources, Inc. Electric power system control with measurement of energy demand and energy efficiency using t-distributions
US20150142197A1 (en) * 2013-11-19 2015-05-21 Intelligent Power & Energy Research Corporation (Iperc) Automated identification of components connected in a power grid
US9766270B2 (en) 2013-12-30 2017-09-19 Fluke Corporation Wireless test measurement
US10831251B1 (en) * 2014-03-11 2020-11-10 Amazon Technologies, Inc. Augmented power monitoring switching assembly
US9799083B2 (en) * 2014-10-28 2017-10-24 Oracle International Corporation Correlating consumption and voltage data to identify line loss in an electric grid
US9778639B2 (en) 2014-12-22 2017-10-03 Johnson Controls Technology Company Systems and methods for adaptively updating equipment models
US10474223B2 (en) * 2014-12-31 2019-11-12 Echelon Corporation Systems, methods, and apparatuses for powerline communication
US10495672B2 (en) 2015-04-03 2019-12-03 Aclara Technologies Llc Framework for fault detection and localization in power distribution networks
US9709604B2 (en) 2015-05-03 2017-07-18 Itron, Inc. Detection of electrical theft from a transformer secondary
US10338017B2 (en) 2015-05-04 2019-07-02 Itron, Inc. Electric grid high impedance condition detection
US9397457B1 (en) * 2015-05-22 2016-07-19 Schneider Electric USA, Inc. O-shaped busway meter pack section
US11172273B2 (en) 2015-08-10 2021-11-09 Delta Energy & Communications, Inc. Transformer monitor, communications and data collection device
US10055869B2 (en) 2015-08-11 2018-08-21 Delta Energy & Communications, Inc. Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components
US10732656B2 (en) 2015-08-24 2020-08-04 Dominion Energy, Inc. Systems and methods for stabilizer control
WO2017041093A1 (en) 2015-09-03 2017-03-09 Delta Energy & Communications, Inc. System and method for determination and remediation of energy diversion in a smart grid network
MX2018004053A (en) 2015-10-02 2018-12-17 Delta Energy & Communications Inc Supplemental and alternative digital data delivery and receipt mesh network realized through the placement of enhanced transformer mounted monitoring devices.
WO2017070646A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Data transfer facilitation across a distributed mesh network using light and optical based technology
US9961572B2 (en) 2015-10-22 2018-05-01 Delta Energy & Communications, Inc. Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle (UAV) technology
EP3163255A1 (en) 2015-11-02 2017-05-03 EDP Comercial - Comercializacao de Energia, S.A. Electricity meter reading equipment
EP3176594A3 (en) * 2015-11-10 2017-08-16 Kamstrup A/S Electricity meter with an improved measurement circuit
FR3045250B1 (en) * 2015-12-11 2017-12-29 Delta Dore METHOD AND DEVICE FOR ADAPTING TO DIFFERENT COMMUNICATION MODES USED BY INTELLIGENT ELECTRIC COUNTERS.
CN106921157B (en) * 2015-12-28 2020-08-04 国网智能电网研究院 Alternating-current side single-phase earth fault control method of flexible ring network controller
US10791020B2 (en) 2016-02-24 2020-09-29 Delta Energy & Communications, Inc. Distributed 802.11S mesh network using transformer module hardware for the capture and transmission of data
US10871242B2 (en) 2016-06-23 2020-12-22 Rain Bird Corporation Solenoid and method of manufacture
BR112018004682B1 (en) * 2016-07-07 2022-04-05 Luiz Paulo Saletti DIGITAL ELECTRONIC METER FOR ELECTRICAL QUANTITIES WITH SIX OR MORE MEASURING ELEMENTS
US10401402B2 (en) 2016-07-26 2019-09-03 Aclara Technologies Llc Synchronized phasor measurement in power distribution networks
US10652633B2 (en) 2016-08-15 2020-05-12 Delta Energy & Communications, Inc. Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms
US10330704B2 (en) * 2016-08-25 2019-06-25 Karl E. Hase System of electrical fixtures with integral current monitoring, telemetry, remote control, safety and sensory features
CN106443173B (en) * 2016-10-20 2023-09-01 云南电网有限责任公司电力科学研究院 Micro-grid online monitoring device and electric quantity metering method thereof
US10980120B2 (en) 2017-06-15 2021-04-13 Rain Bird Corporation Compact printed circuit board
US10489019B2 (en) 2017-06-16 2019-11-26 Florida Power & Light Company Identifying and presenting related electrical power distribution system events
US10852341B2 (en) 2017-06-16 2020-12-01 Florida Power & Light Company Composite fault mapping
US10837995B2 (en) 2017-06-16 2020-11-17 Florida Power & Light Company Composite fault mapping
US10514399B1 (en) 2017-08-08 2019-12-24 II Donald P. Orofino Measurement of alternating electric current via electromagnetic dynamic sensor measurements
US11394238B2 (en) * 2017-09-01 2022-07-19 Mitsubishi Electric Corporation System control device and method of system control
ES2705086A1 (en) * 2017-09-20 2019-03-21 Univ Madrid Carlos Iii Procedure to estimate energy losses due to fraud in a low voltage power network (Machine-translation by Google Translate, not legally binding)
US11503782B2 (en) 2018-04-11 2022-11-22 Rain Bird Corporation Smart drip irrigation emitter
US10787079B2 (en) * 2018-09-27 2020-09-29 Ford Global Technologies, Llc Vehicle ground path impedance difference detection
US10666279B1 (en) * 2019-02-27 2020-05-26 Texas Instruments Incorporated Power supply telemetry self-calibration
US11169187B2 (en) * 2019-06-28 2021-11-09 King Fahd University Of Petroleum And Minerals Zig zag based load flow method and system for extended radial distribution systems
CN111092413B (en) * 2019-11-28 2022-06-17 国电南瑞科技股份有限公司 Relay protection method and device for rapidly removing fault of empty charge in dead zone of transformer
US11137421B1 (en) * 2020-04-10 2021-10-05 Schneider Electric USA, Inc. Non-contact voltage sensing system
US11721465B2 (en) 2020-04-24 2023-08-08 Rain Bird Corporation Solenoid apparatus and methods of assembly
US11693036B2 (en) 2020-11-17 2023-07-04 Honeywell International Inc. Interval data for a utility meter during a power outage without a battery
CN112684232B (en) * 2021-02-01 2022-03-25 宁夏隆基宁光仪表股份有限公司 Intelligent ammeter capable of preventing electricity theft
CN113762332B (en) * 2021-07-19 2024-03-19 深圳供电局有限公司 Method, apparatus, computer device and storage medium for detecting fraudulent use of electricity
US11899516B1 (en) 2023-07-13 2024-02-13 T-Mobile Usa, Inc. Creation of a digital twin for auto-discovery of hierarchy in power monitoring

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4218655A (en) * 1974-07-17 1980-08-19 New England Power Service Company Method and apparatus for transmitting intelligence over a carrier wave
US4347575A (en) * 1979-07-02 1982-08-31 Sangamo Weston, Inc. System for controlling power distribution to customer loads
US4668934A (en) * 1984-10-22 1987-05-26 Westinghouse Electric Corp. Receiver apparatus for three-phase power line carrier communications
US4700188A (en) * 1985-01-29 1987-10-13 Micronic Interface Technologies Electric power measurement system and hall effect based electric power meter for use therein
US5237511A (en) * 1990-10-29 1993-08-17 Westronic, Inc. Distribution automation smart remote terminal unit
US5572396A (en) * 1995-04-21 1996-11-05 Ekstrom Industries, Inc. Electric service safety disconnect apparatus with overvoltage and overcurrent protection
US5576700A (en) * 1992-08-26 1996-11-19 Scientific-Atlanta Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load
US5729145A (en) * 1992-07-30 1998-03-17 Siemens Energy & Automation, Inc. Method and apparatus for detecting arcing in AC power systems by monitoring high frequency noise
US6064192A (en) * 1998-04-08 2000-05-16 Ohio Semitronics Revenue meter with integral current transformer
US6104586A (en) * 1997-11-20 2000-08-15 Ekstrom Industries, Inc. Circuit breaker switch apparatus
US20030001754A1 (en) * 1990-02-15 2003-01-02 Itron, Inc. Wide area communications network for remote data generating stations
US6665620B1 (en) * 1998-08-26 2003-12-16 Siemens Transmission & Distribution, Llc Utility meter having primary and secondary communication circuits
US20040257005A1 (en) * 2002-07-31 2004-12-23 Tom Poehlman Transient detection of end of lamp life condition apparatus and method
US20050137813A1 (en) * 2000-02-29 2005-06-23 Swarztrauber Sayre A. System and method for on-line monitoring and billing of power consumption

Family Cites Families (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2118655A (en) * 1931-01-17 1938-05-24 American Sales Book Co Inc Manifolding assembly
CA957091A (en) * 1971-12-16 1974-10-29 Itt Canada Transponder for telemetering system
US3922492A (en) 1974-03-18 1975-11-25 James Ray Lumsden Remote meter reading transponder
US3973240A (en) 1974-12-05 1976-08-03 General Electric Company Power line access data system
US4004097A (en) 1975-01-03 1977-01-18 Badger Meter, Inc. Automatic meter reading device
US4240030A (en) 1978-12-14 1980-12-16 Bateman Jess R Intelligent electric utility meter
US4783748A (en) * 1983-12-09 1988-11-08 Quadlogic Controls Corporation Method and apparatus for remote measurement
GB8412277D0 (en) 1984-05-14 1984-06-20 Gen Electric Co Plc Electricity metering equipment
US4652855A (en) * 1984-12-05 1987-03-24 Westinghouse Electric Corp. Portable remote meter reading apparatus
GB8614620D0 (en) 1986-06-16 1986-07-23 Schlumberger Electronics Uk Commodity metering systems
US4847782A (en) * 1986-09-23 1989-07-11 Associated Data Consultants, Inc. Energy management system with responder unit having an override
ZA916610B (en) 1990-08-21 1992-06-24 Ash Brothers Measurement And C Prepaid metering device
JPH04160838A (en) 1990-10-24 1992-06-04 Mitsubishi Electric Corp Gateway processor and its control method
US5182744A (en) 1991-01-03 1993-01-26 At&T Bell Laboratories Telecommunications network restoration architecture
US5451938A (en) * 1993-10-22 1995-09-19 Schlumberger Industries, Inc. RF meter reading system
JP2867860B2 (en) 1993-12-16 1999-03-10 日本電気株式会社 Cross connect device
US5559870A (en) 1995-06-30 1996-09-24 Scientific-Atlanta, Inc. Method and apparatus for providing information to a subscriber over an electronic network
GB9521313D0 (en) 1995-10-18 1995-12-20 Linburg Ltd Communication system and apparatus for remote reading of utility meters and power demand management of power systems
US5699276A (en) * 1995-12-15 1997-12-16 Roos; Charles E. Utility meter providing an interface between a digital network and home electronics
GB9604092D0 (en) 1996-02-27 1996-05-01 Linburg Ltd Data carrying network
US6115676A (en) 1996-04-09 2000-09-05 General Electric Company Methods and apparatus for performing load profile and load control
US5838660A (en) 1996-11-14 1998-11-17 Mci Communications Corporation Dynamic restoration process
US6049791A (en) 1997-01-16 2000-04-11 Lerner; Sam Utility meter and display system
US5897607A (en) 1997-02-28 1999-04-27 Jenney Systems Associates, Ltd. Automatic meter reading system
US5940009A (en) * 1997-09-08 1999-08-17 Abb Power T&D Company Inc. Apparatus and method to detect tampering with an electronic utility meter
US5986574A (en) 1997-10-16 1999-11-16 Peco Energy Company System and method for communication between remote locations
AU1935699A (en) * 1997-12-24 1999-07-19 Abb Power T & D Company Inc. Method and apparatus for detecting and reporting a power outage
AU752417B2 (en) 1998-03-09 2002-09-19 Abb Inc. Remote access to electronic meters using a TCP/IP protocol suite
WO1999057697A1 (en) 1998-05-01 1999-11-11 Abb Power T & D Company Inc. Wireless area network communications module for utility meters
US6232886B1 (en) * 1998-12-23 2001-05-15 Schlumberger Resource Management Services, Inc. Method and apparatus for indicating meter tampering
US6675071B1 (en) * 1999-01-08 2004-01-06 Siemens Transmission & Distribution. Llc Power quality utility metering system having waveform capture
US6529883B1 (en) * 1999-08-20 2003-03-04 Motorola, Inc. Prepayment energy metering system with two-way smart card communications

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4218655A (en) * 1974-07-17 1980-08-19 New England Power Service Company Method and apparatus for transmitting intelligence over a carrier wave
US4347575A (en) * 1979-07-02 1982-08-31 Sangamo Weston, Inc. System for controlling power distribution to customer loads
US4668934A (en) * 1984-10-22 1987-05-26 Westinghouse Electric Corp. Receiver apparatus for three-phase power line carrier communications
US4700188A (en) * 1985-01-29 1987-10-13 Micronic Interface Technologies Electric power measurement system and hall effect based electric power meter for use therein
US20030001754A1 (en) * 1990-02-15 2003-01-02 Itron, Inc. Wide area communications network for remote data generating stations
US5237511A (en) * 1990-10-29 1993-08-17 Westronic, Inc. Distribution automation smart remote terminal unit
US5729145A (en) * 1992-07-30 1998-03-17 Siemens Energy & Automation, Inc. Method and apparatus for detecting arcing in AC power systems by monitoring high frequency noise
US5576700A (en) * 1992-08-26 1996-11-19 Scientific-Atlanta Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load
US5572396A (en) * 1995-04-21 1996-11-05 Ekstrom Industries, Inc. Electric service safety disconnect apparatus with overvoltage and overcurrent protection
US6104586A (en) * 1997-11-20 2000-08-15 Ekstrom Industries, Inc. Circuit breaker switch apparatus
US6064192A (en) * 1998-04-08 2000-05-16 Ohio Semitronics Revenue meter with integral current transformer
US6665620B1 (en) * 1998-08-26 2003-12-16 Siemens Transmission & Distribution, Llc Utility meter having primary and secondary communication circuits
US20050137813A1 (en) * 2000-02-29 2005-06-23 Swarztrauber Sayre A. System and method for on-line monitoring and billing of power consumption
US20040257005A1 (en) * 2002-07-31 2004-12-23 Tom Poehlman Transient detection of end of lamp life condition apparatus and method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090292402A1 (en) * 2008-04-14 2009-11-26 Cruickshank Iii Robert F Method & apparatus for orchestrating utility power supply & demand in real time using a continuous pricing signal sent via a network to home networks & smart appliances
US8195337B2 (en) * 2008-04-14 2012-06-05 Cruickshank Iii Robert F Method and apparatus for orchestrating utility power supply and demand in real time using a continuous pricing signal sent via a network to home networks and smart appliances
US20120209438A1 (en) * 2008-04-14 2012-08-16 Robert F. Cruickshank, III System, Method & Apparatus For Power Management
US9672479B2 (en) * 2008-04-14 2017-06-06 Robert F. Cruickshank System, method and apparatus for power management
US10102484B2 (en) 2008-04-14 2018-10-16 Robert F. Cruickshank, III System, method and apparatus for power management
US10402753B2 (en) 2008-04-14 2019-09-03 Robert F. Cruickshank, III System, method and apparatus for power management
US20110166839A1 (en) * 2011-02-10 2011-07-07 Christian Smith Method and system for the estimating the energy consumption of commercially available electrical devices
US8172147B2 (en) * 2011-02-10 2012-05-08 Christian Smith Method and system for the estimating the energy consumption of commercially available electrical devices
US20160172827A1 (en) * 2013-07-16 2016-06-16 Miguel BATISTA OLIVEIRA COSTA LEAL System for operating and monitoring power cables
US9923344B2 (en) * 2013-07-16 2018-03-20 Miguel BATISTA OLIVEIRA COSTA LEAL System for operating and monitoring power cables
WO2016016827A3 (en) * 2014-07-30 2016-03-24 Universiti Brunei Darussalam Managing energy meter usage feedback

Also Published As

Publication number Publication date
US7054770B2 (en) 2006-05-30
US20060259254A1 (en) 2006-11-16
US6947854B2 (en) 2005-09-20
US20050137813A1 (en) 2005-06-23
US20090132096A1 (en) 2009-05-21
US7539581B2 (en) 2009-05-26
US20030158677A1 (en) 2003-08-21

Similar Documents

Publication Publication Date Title
US7539581B2 (en) System and method for on-line monitoring and billing of power consumption
IL180435A (en) Method of detecting unauthorized usage of electricity transmitted over power lines
US10564196B2 (en) System and method for detecting and localizing non-technical losses in an electrical power distribution grid
US8378844B2 (en) Utility meter with external signal-powered transceiver
US6998963B2 (en) Endpoint receiver system
US7102490B2 (en) Endpoint transmitter and power generation system
US6844825B2 (en) Electric energy service apparatus with tamper detection
RU2314542C2 (en) System of remote collection of data of consumption of electric energy and remote control over distributed user's points and also of domestic type consumption
Bahmanyar et al. Emerging smart meters in electrical distribution systems: Opportunities and challenges
US20090140880A1 (en) Endpoint Event Processing System
Labib et al. Design and implementation of low‐cost universal smart energy meter with demand side load management
US20070114987A1 (en) Intelligent electronic device for providing broadband Internet access
Kaplan Two-way communication for load management: The results of system tests now underway will guide utilities in performance, cost, and legal aspects
Zubairuddin et al. Automatic Meter Reading using Wireless Sensor Module
Estebsari et al. Emerging smart meters in electrical distribution systems: Opportunities and challenges
Carlisle Edison's Netcomm Project
Helmy et al. Examining power line communication on Egypt’s low voltage grid for AMR network
Payne et al. A new approach to intelligent metering and power line communication

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

AS Assignment

Owner name: QUADLOGIC CONTROLS CORPORATION, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SWARZTRAUBE, SAYRE A.;SHAFRIR, DORON;LO, STANLEY C.;AND OTHERS;REEL/FRAME:055230/0986

Effective date: 20010605

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20210526