WO2003055031A9 - System for the remote data acquisition and control of electric energy meters - Google Patents

System for the remote data acquisition and control of electric energy meters

Info

Publication number
WO2003055031A9
WO2003055031A9 PCT/EP2002/014687 EP0214687W WO03055031A9 WO 2003055031 A9 WO2003055031 A9 WO 2003055031A9 EP 0214687 W EP0214687 W EP 0214687W WO 03055031 A9 WO03055031 A9 WO 03055031A9
Authority
WO
WIPO (PCT)
Prior art keywords
data
processor
function
performs
concentrator
Prior art date
Application number
PCT/EP2002/014687
Other languages
French (fr)
Other versions
WO2003055031A2 (en
WO2003055031A3 (en
Inventor
Sergio Rogai
Original Assignee
Enel Distribuzione Spa
Sergio Rogai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=11448728&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2003055031(A9) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority to JP2003555643A priority Critical patent/JP4705755B2/en
Priority to SI200230307T priority patent/SI1456676T1/en
Priority to KR1020047009703A priority patent/KR100940246B1/en
Priority to BRPI0215173A priority patent/BRPI0215173B8/en
Priority to EP02796713A priority patent/EP1456676B1/en
Priority to AU2002361201A priority patent/AU2002361201A1/en
Priority to DK05006537T priority patent/DK1548451T3/en
Priority to CA2471267A priority patent/CA2471267C/en
Priority to US10/499,691 priority patent/US7271735B2/en
Priority to DE60209552T priority patent/DE60209552T2/en
Application filed by Enel Distribuzione Spa, Sergio Rogai filed Critical Enel Distribuzione Spa
Publication of WO2003055031A2 publication Critical patent/WO2003055031A2/en
Publication of WO2003055031A3 publication Critical patent/WO2003055031A3/en
Publication of WO2003055031A9 publication Critical patent/WO2003055031A9/en
Priority to HK05107551A priority patent/HK1075293A1/en
Priority to CY20061100526T priority patent/CY1105438T1/en
Priority to US11/808,822 priority patent/US8072348B2/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • G01D4/004Remote reading of utility meters to a fixed location
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • G08C19/02Electric signal transmission systems in which the signal transmitted is magnitude of current or voltage
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D2204/00Indexing scheme relating to details of tariff-metering apparatus
    • G01D2204/40Networks; Topology
    • G01D2204/45Utility meters networked together within a single building
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • G01R21/1333Arrangements for measuring electric power or power factor by using digital technique adapted for special tariff measuring
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Definitions

  • the invention applies in particular to the field of electric energy distribution to a plurality of users spread over the territory; but, more generally, it can also be applied to other services, as for example the distribution of water and gas, or for district heating.
  • the invention satisfies the requirement - which has arisen since a few years on a worldwide basis, especially in the technically more developed countries - to carry out the remote reading of the electric energy consumptions and, if desired, to apply different rates when invoicing the users, also of domestic type.
  • a problem of this type has already been described, for example, in the Italian Patent No. 1.232.195, filed on 26 October 1988 by the same Applicant, or in the document US-A-4, 803, 632.
  • Said contact is obtained through a direct communication between the supervision unit (generally a server with a high processing power) and the peripheral electricity meters, as described for example in W0- 98/10299, or by interposing in this pyramid at least an intermediate hierarchic level, as proposed in O-98/10394. Examples of these proposals can also be found in other patents, for example EP-A2-0.723.358 or WO-99/46564.
  • the main object of the present invention is therefore to propose a system allowing, on one hand, the remote acquisition of data from the targets of users and, on the other hand, also the remote control of such targets, so as to be able to satisfy the present requirements of all those companies which - like the companies distributing electric energy, water, gas and the like - operate in the presence of a high number of targets of users spread over the territory.
  • ⁇ a high number of targets of users it can be recalled that the company ENEL (National Company for Electric Energy) deals at present with about thirty million targets of users.
  • a further object of the present invention is to propose a system apt to guarantee both a regular and continuous working, and a capacity of survival also in the case of blackouts of any type.
  • said objects are reached with a system making use - in a manner known per se - of a single operating unit connected to the targets of users through a plurality of intermediate stations, said system having the characteristics pointed out in the characterizing part of claim 1.
  • each of said units Al ... An comprises a limited number of electricity meters CE; by the term "limited” is meant a relatively small number of meters CE, preferably between 50 and 300, determined by the vastness of the territory or area served thereby, or by other factors, also commercial, connected with the territory taken into consideration; ⁇
  • concentrators by distributing a plurality of said concentrators C-BT1 ...C-BTn over the whole territory being served, and by then connecting such concentrators to a single central server AMM.
  • plural is here meant a number higher - by at least one, but also by two orders of magnitude - than the number of electricity meters CE of a unit, for example a number higher than 100,000 concentrators, in the case being illustrated 330.000 concentrators.
  • a fundamental characteristic of the present invention once a network of this type has been created, one provides not to concentrate the processing capacity, namely the intelligence of the system, merely in the central server AMM - as substantially done in prior art - but to distribute it between the three aforementioned components, namely the central server AMM, the concentrators C-BT1 ... C-BTn, and the electricity meters CE.
  • the principle adopted for this distribution is what allows to find the way for the communication lines to no longer have to transmit a considerable amount of data to be processed, but only a reduced amount of data, which has already been at least partially processed.
  • the present invention proposes to adopt the principle of distributing the processing power
  • the principle that has lead to the achievement of the present invention may find its origin in the fact of having reproduced a virtual (but totally faithful) image of the electricity meter CE inside the concentrator C-BT. Virtually, it is as if in the concentrator there existed an "alias" of the electricity meter, which is continuously updated by the concentrator in a predetermined manner, by withdrawing data from the actual electricity meter (such data being processed autonomously or following controls being received) .
  • This image electricity meter is thus, in actual fact, constantly available on the concentrator for the transactions and the exchange of data, or for receiving controls and/or programs from the server.
  • This set-up allows furthermore to use in "stand- alone” conditions both the single electricity meter CE and the area units Al ...
  • each of the meters CE incorporates, as well as means to measure the power consumptions, substantially known per se, also
  • each concentrator incorporates
  • the output of said second processor being connected to said second data memory and/or to said second bidirectional transmission means, so as to at least temporarily store and/or respectively transmit said further processed data.
  • the connection, for the transmission of data, between the meters CE and the concentrators C-BT is preferably obtained through wave transmission systems, using the same power supply conductors that connect the meters CE to the low voltage power supply substations, e.g. the secondary substations, where the concentrators C-BT are positioned.
  • the connection between the concentrators C-BT1 ... C-BTn and the central server AMM is obtained, by preference, through a telephone network, whether it is a specific or a general-purpose network.
  • a very suitable telephone network for this purpose would be the GSM or any other public mobile telephone network or any other existing wireless public telephone network, e.g., a satellite based wireless telephone network. If such a network is employed, it is advantageous to establish dial up connections between the concentrator C-BT and the central server AMM on demand or according to a schedule which can be predefined or dependent on an operating condition of the concentrator C-BT or the central server AMM.
  • the AMM or the C-BT will try to establish a connection between the AMM and the C-BT at predetermined times during a day, week or month, at which times it can be assumed that a certain amount of data or commands which require to be transmitted, has been collected and buffered in the concentrator and/or in the AMM, respectively. If the schedule is dependent on an operating condition of the AMM and/or the C-BT, a dial up connection will be established as soon as a certain amount of data and/or commands which require transmission, have been collected or if certain alarm conditions have been detected which require to be reported without delay. In any case, after the data and/or commands have been transmitted, the connection is terminated.
  • the respective measuring - which also forms an important characteristic of the present invention - ends up by being strictly tied to the functions which each of the three components of the system should perform.
  • each electricity meter of the system according to the invention is dimensioned so that said first processor incorporated therein is apt to perform at least the functions of: (1) acquisition of the electric energy consumptions, (5) distribution of • the power consumptions into different scales of charges, (12) estimate of the tampering attempts and control of an antifraud device, (25) transfer and maintenance of the stored data at least during the voltage drop.
  • each concentrator of the system according to the invention is dimensioned so that said second processor incorporated therein is apt to perform, as well as the double function of master of the PLC (power line carrier) network, for what concerns the communications on the power supply line between the actual concentrator and the electricity meters and, respectively, of node of the TLC network, for what concerns the communications on the telephone line between the concentrator and the central server, at least the following additional functions: (11) execution of an energy balance for what concerns the single cabin of electric energy supply into which the concentrator is positioned, (14) constant monitoring of the working conditions of each electricity meter connected thereto and issue of an alarm signal in case the self- diagnostics of the meter should indicate a malfunction.
  • PLC power line carrier
  • the server or central unit of the system according to the invention is dimensioned so that its processor is apt to guarantee at least the following functions: (8) automatic control of the operations of disconnection, reconnection, suspension, delayed payments and contract variations, (10) selective cut-off of the power supply due to requirements of the electric system, and (26) downloading of the operating programs.
  • the known type electromechanical electricity meters adopted in the present power consumption system, are apt to measure only one type of electric energy consumption, active or reactive; if both measurements are required, it is hence necessary to install two distinct electricity meters.
  • the electronic electricity meter according to the present invention is instead apt to simultaneously measure both the active energy consumptions and the reactive energy consumptions .
  • the electricity meter measures in class 1 for the active energy and in class 2 for the reactive energy.
  • the electromechanical electricity meters normally used in the power consumption system are apt to measure only one type of power, active or reactive; if both measurements are required, it is hence necessary to install two electricity meters, as already mentioned for the electric energy consumptions.
  • the electronic electricity meter according to the present invention is instead apt to simultaneously measure both the active power and the reactive power.
  • the electricity meter is apt to establish a table of different time scales in the space of a day, thereby making it possible to set out for each of them a respective cost value for the electric energy used up.
  • the electricity meter is thus apt to integrate the consumptions with reference to the table of costs and to memorize, in the invoicing period, the total consumption of each time scale.
  • said table of costs can be programmed not only on the basis of time profiles but also on the basis of power thresholds .
  • Control of two electric energy supply contracts In the power range up to 35 kw, it is possible to control two electric energy supply contracts, namely an existing contract and the one to be applied in future.
  • the electricity meter can be programmed to automatically switch over the contract - from the present one to the future one - upon reaching of a given date .
  • the cut-off or suspension of the power supply can be necessary, generally on a local level, in case of blackout risks or of temporary overloads.
  • This function is not implemented in a broadcast mode, but it is instead specifically addressed to each single electricity meter. From the centre (central server or concentrator) it is possible to send to the electricity meters, via PLC, a control for example to modify the highest power available in the actual meter, with a temporary effect, that is with no need to alter the power supply contract; this allows to obtain a lightening of the overall power required from the cabin.
  • the microprocessor incorporated in each electricity meter is apt to verify and memorize interruptions of electric energy supply and voltage variations (deviation of the voltage from the nominal value foreseen in the electric energy supply contract) . On the basis of this data, it is possible to determine the quality parameters of the service at the level of each delivery point of the electric energy being supplied.
  • each electricity meter is apt to periodically verify (self- diagnostics) the conditions of the various hardware components of said meter and the congruency of the data stored in the memory. In case there should be any malfunctions, it is possible both to signal the same with appropriate service words (which are then read by the central system) , and to start immediate recovery procedures .
  • the system according to the invention allows not only to carry out operations directly connected to the supply of the service for which the system has been conceived, but also to send to the electricity meter and receive from the same other types of information ("information provider" service) .
  • the electricity meter can display such information on its own visual display unit, or else transfer it onto other devices connected to the electric line of the user, downstream of the electricity meter, or even draw it therefrom; such devices are directly interfaced with the electricity meter via PLC, or else through a bridge-device acting as an intermediate bridge and communicating directly with the electricity meter via PLC.
  • Set of displayable data On the local display of the meter (for example of the 16x1 alphanumeric + icons type) , a whole series of data may be programmed.
  • the presence of electronic components allows to provide additional functions such as locally displaying to the user consumptions and costs data, generic messages or messages providing information about the service, or indicating the functional state of said meter to the service staff (diagnostics) .
  • Opening the power circuit A modular element equipped with a suitable releasing element apt to be opened by remote control is integrated into the meter.
  • a single box hosts both the electronic components apt to perform the meter functions described so far, and the electromechanical components apt to open/close the electrical power line. This way, the electromechanical components, besides operating autonomously at the highest power, may also be directed on request of the central unit or in the presence of local conditions detected by the electronic part (e.g. when the contract expires) .
  • the invention provides a meter group in two parts, namely a wedge as a base and a controlling and managing body, the two parts being connectable through connecting pliers and a bayonet joint.
  • the PLC communication system requires the availability of complex hardware and software means.
  • simple devices e.g. handheld PCs
  • an optical ZVEI gate is also associated to the meter. Said gate only requires the external device to have a simple RS-232 serial gate (available in almost every PC) .
  • the PLC communication method uses a physical support (electric line) that does not guarantee homogeneous conduction of the signal in every point of the network, for which reason meters may not be reachable by the concentrator. Therefore, the concentrator may require one or more meters (which are able "see” the non-reachable meter) to act as bridges, forwarding the message to the non- reachable meter. It is indeed a repetition mechanism,' which allows to solve the problem of reachability via network.
  • the concentrator checks its reachability. If it is not reachable, it tries to detect one or more different meters that can "see” the non-directly reachable meter. These meters are detected, the detecting parameters stored, and then subsequently used as an intermediate bridge.
  • the meters be at least allocated at least one of the functions indicated at numbers 1), 5), 12) and 25); but also, preferably, the functions indicated at numbers 2), 3), 4), 6), 7) 12), 13), 16), 17) 18, 19), 20) and 25) are performed in the meters;
  • the meters be able to manage, together with the concentrators and the server, also at least one of the functions indicated at numbers 9), 14), 15), 21), 22), 23) and 26);
  • the concentrators be at least allocated at least one of the functions indicated at numbers 11) and 14), as well as those of PLC network master and TLC network node, but also, preferably, the functions indicated at numbers 20) and 24) are performed in concentrators;
  • the central server be at least allocated one or more of the functions indicated at numbers 8), 10), 17) and 26), but the function indicated at numbers 9) and 21) is also preferably performed in the central server, as well as the function, of course, of TLC network master, and other potential invoicing and managing functions (not concerning this patent application) .
  • the intelligence of the system is distributed between the central unit, concentrators and meters so that each of these three elements of the system has its own processing ability, although limited as regards the meters, but sufficient in order to relevantly reduce the requirements of data transmission through bidirectional transmission; these requirements being limited, on the one hand, by the reduction of the quantity of transmitted data or, on the other hand, by the delay of their transmission to times when the transmission lines are less busy.

Abstract

A system for the remote acquisition of data and for the remote control of electricity meters comprises a central server AMM in bi-directional communication with a plurality of concentrators. To each concentrator, a set of electricity meters is connected, such that bi-directional communication between each meter and its associated concentrator is possible. The intelligence of the system is distributed between the central server, the concentrators and the electricity meters. To this end, each meter comprises at least a first processor, a first data memory and a first program memory for bi-directional communication with the associated concentrator. The first data memory serves to at least temporarily store and/or transmit the data which have already undergone a first processing by the first processor. Each of the concentrators comprises a second processor, a second program memory and a second data memory as well as means for a bi-directional communication with a central server. The second data memory serves to temporarily store and/or transmit the data processed by the second processor.

Description

"SYSTEM FOR THE REMOTE ACQUISITION OF THE ELECTRIC ENERGY CONSUMPTIONS AND FOR THE REMOTE CONTROL OF THE DISTRIBUTED TARGETS OF USERS, ALSO OF DOMESTIC TYPE"
The invention applies in particular to the field of electric energy distribution to a plurality of users spread over the territory; but, more generally, it can also be applied to other services, as for example the distribution of water and gas, or for district heating.
The invention satisfies the requirement - which has arisen since a few years on a worldwide basis, especially in the technically more developed countries - to carry out the remote reading of the electric energy consumptions and, if desired, to apply different rates when invoicing the users, also of domestic type. A problem of this type has already been described, for example, in the Italian Patent No. 1.232.195, filed on 26 October 1988 by the same Applicant, or in the document US-A-4, 803, 632.
This requirement has arisen, and has increasingly developed, not only due to economical reasons, but also due to the need to establish further transparency and efficiency in the contractual relationships with the customers, in a market which is progressively getting more and more liberalized.
In this background, supported by the technological evolutions in the field of componentry technology, a certain number of technical solutions, systems or methodologies have been proposed, which intend to solve the problems connected with this situation.
The approach which associates these different studies can be summed up in a network which makes use of varied forms of communication to put into contact the peripheral points of the system (electricity meters in the targets of the users) with a supervision unit designed to conduct the procedures deemed helpful, time after time, to reach the intended objects.
Said contact is obtained through a direct communication between the supervision unit (generally a server with a high processing power) and the peripheral electricity meters, as described for example in W0- 98/10299, or by interposing in this pyramid at least an intermediate hierarchic level, as proposed in O-98/10394. Examples of these proposals can also be found in other patents, for example EP-A2-0.723.358 or WO-99/46564.
Nevertheless, the greatest majority of these projects has very often remained at the stage of purely unrealistic attempts or laboratory achievements, while the few proposals which have evolved up to reaching the level of an industrial type achievement have reached no appreciable results in terms of diffusion and use. The reasons for which such proposals have found no application on a vast scale lie in the fact that the industrial products obtained are not apt to guarantee the required performances when applied to situations involving a very high number of targets of users, as it generally happens in the case of electric energy consumptions. The main object of the present invention is therefore to propose a system allowing, on one hand, the remote acquisition of data from the targets of users and, on the other hand, also the remote control of such targets, so as to be able to satisfy the present requirements of all those companies which - like the companies distributing electric energy, water, gas and the like - operate in the presence of a high number of targets of users spread over the territory. To give an indication as to what is meant by λλa high number of targets of users" it can be recalled that the company ENEL (National Company for Electric Energy) deals at present with about thirty million targets of users.
A further object of the present invention is to propose a system apt to guarantee both a regular and continuous working, and a capacity of survival also in the case of blackouts of any type.
According to the present invention, said objects are reached with a system making use - in a manner known per se - of a single operating unit connected to the targets of users through a plurality of intermediate stations, said system having the characteristics pointed out in the characterizing part of claim 1.
Further characteristics and advantages of the present invention will anyhow result more evident from the following detailed description of a preferred embodiment thereof, given by mere way of non-limiting example and partially illustrated on the accompanying drawing, the only figure of which shows a diagram of the structure of the system according to the invention. Said diagram substantially represents the set-up of the Italian territory at the filing date of the present patent application: it is meant to supervise and control about twenty-seven million electricity meters distributed over the whole territory. It is anyhow understood that this diagram merely represents an example and that it should in no way be considered as limiting the present invention.
Thus, according to a first aspect of the present invention, such a vast set-up as that illustrated on the drawing, is obtained,
- on the one hand, by distributing the electricity meters CE according to area units Al ... An and connecting the meters of each unit to a respective common concentrator C-BT1 ... C-BTn. Each of said units Al ... An comprises a limited number of electricity meters CE; by the term "limited" is meant a relatively small number of meters CE, preferably between 50 and 300, determined by the vastness of the territory or area served thereby, or by other factors, also commercial, connected with the territory taken into consideration;
on the other hand, by distributing a plurality of said concentrators C-BT1 ...C-BTn over the whole territory being served, and by then connecting such concentrators to a single central server AMM. By the term "plurality" is here meant a number higher - by at least one, but also by two orders of magnitude - than the number of electricity meters CE of a unit, for example a number higher than 100,000 concentrators, in the case being illustrated 330.000 concentrators.
According to a fundamental characteristic of the present invention, once a network of this type has been created, one provides not to concentrate the processing capacity, namely the intelligence of the system, merely in the central server AMM - as substantially done in prior art - but to distribute it between the three aforementioned components, namely the central server AMM, the concentrators C-BT1 ... C-BTn, and the electricity meters CE. The principle adopted for this distribution is what allows to find the way for the communication lines to no longer have to transmit a considerable amount of data to be processed, but only a reduced amount of data, which has already been at least partially processed.
Substantially, to allow a system involving such high numbers and functional performances as those illustrated to work efficiently, with no delays and without any jams, the present invention proposes to adopt the principle of distributing the processing power
- as far as it is reasonable from the economical point of view - as much as possible onto the peripheral units CE and on the concentrators C-BT1 ... C-BTn, to such an extent as to make such units as autonomous as possible (even acting in "stand-alone" conditions in case of interruption on the communication lines, or giving up part of the functional performances, if necessary) . By acting in this way, it has been achieved to weigh as less as possible on the communication systems, by actually transferring merely the "processed data", rather than the entire amount of elementary data, and thereby obtaining some important results, such as:
- a simplification of the processings required for the central server;
- a reduced communication load;
- the availability of considerable amounts of useful band for the purpose of supporting any eventual additional services .
The principle that has lead to the achievement of the present invention may find its origin in the fact of having reproduced a virtual (but totally faithful) image of the electricity meter CE inside the concentrator C-BT. Virtually, it is as if in the concentrator there existed an "alias" of the electricity meter, which is continuously updated by the concentrator in a predetermined manner, by withdrawing data from the actual electricity meter (such data being processed autonomously or following controls being received) . This image electricity meter is thus, in actual fact, constantly available on the concentrator for the transactions and the exchange of data, or for receiving controls and/or programs from the server.
This set-up allows furthermore to use in "stand- alone" conditions both the single electricity meter CE and the area units Al ... An formed by the single concentrator C-BT and by the electricity meters CE of the area unit controlled thereby; thus, without the supervision of the server in real time but, for example, through a periodic reading of the data from the concentrator by means of a portable terminal.
To obtain this result, a further structural feature of the system thus formed lies in the fact that each of the meters CE incorporates, as well as means to measure the power consumptions, substantially known per se, also
- means to transduce the measured values into measuring data meant to be processed,
- at least a first processor to process said measuring data,
- at least a first data memory and a first programme memory, and
- first means for the bi-directional transmission towards the associated concentrator,
- the output of said first processor being connected to said first data memory and/or to said first bidirectional transmission means, so as to at least temporarily store and/or respectively transmit the data, which has already undergone a first processing. Likewise, each concentrator incorporates
- at least a second programme memory,
- at least a second microprocessor for further processing said data processed by the meters,
- at least a second data memory to store the data issued by said meters and/or by said second microprocessor,
- and second means for the bi-directional transmission towards the central server,
the output of said second processor being connected to said second data memory and/or to said second bidirectional transmission means, so as to at least temporarily store and/or respectively transmit said further processed data.
The connection, for the transmission of data, between the meters CE and the concentrators C-BT is preferably obtained through wave transmission systems, using the same power supply conductors that connect the meters CE to the low voltage power supply substations, e.g. the secondary substations, where the concentrators C-BT are positioned. Whereas, the connection between the concentrators C-BT1 ... C-BTn and the central server AMM is obtained, by preference, through a telephone network, whether it is a specific or a general-purpose network. A very suitable telephone network for this purpose would be the GSM or any other public mobile telephone network or any other existing wireless public telephone network, e.g., a satellite based wireless telephone network. If such a network is employed, it is advantageous to establish dial up connections between the concentrator C-BT and the central server AMM on demand or according to a schedule which can be predefined or dependent on an operating condition of the concentrator C-BT or the central server AMM.
If a predefined schedule is adopted, the AMM or the C-BT will try to establish a connection between the AMM and the C-BT at predetermined times during a day, week or month, at which times it can be assumed that a certain amount of data or commands which require to be transmitted, has been collected and buffered in the concentrator and/or in the AMM, respectively. If the schedule is dependent on an operating condition of the AMM and/or the C-BT, a dial up connection will be established as soon as a certain amount of data and/or commands which require transmission, have been collected or if certain alarm conditions have been detected which require to be reported without delay. In any case, after the data and/or commands have been transmitted, the connection is terminated.
With a structure of the system thus conceived, the respective measuring - which also forms an important characteristic of the present invention - ends up by being strictly tied to the functions which each of the three components of the system should perform.
In particular, each electricity meter of the system according to the invention is dimensioned so that said first processor incorporated therein is apt to perform at least the functions of: (1) acquisition of the electric energy consumptions, (5) distribution of • the power consumptions into different scales of charges, (12) estimate of the tampering attempts and control of an antifraud device, (25) transfer and maintenance of the stored data at least during the voltage drop.
Likewise, each concentrator of the system according to the invention is dimensioned so that said second processor incorporated therein is apt to perform, as well as the double function of master of the PLC (power line carrier) network, for what concerns the communications on the power supply line between the actual concentrator and the electricity meters and, respectively, of node of the TLC network, for what concerns the communications on the telephone line between the concentrator and the central server, at least the following additional functions: (11) execution of an energy balance for what concerns the single cabin of electric energy supply into which the concentrator is positioned, (14) constant monitoring of the working conditions of each electricity meter connected thereto and issue of an alarm signal in case the self- diagnostics of the meter should indicate a malfunction.
Finally, the server or central unit of the system according to the invention is dimensioned so that its processor is apt to guarantee at least the following functions: (8) automatic control of the operations of disconnection, reconnection, suspension, delayed payments and contract variations, (10) selective cut-off of the power supply due to requirements of the electric system, and (26) downloading of the operating programs.
A more complete list - to be however considered as a non-limiting example - of the functions which the system according to the present invention is apt to perform, can be summed up in the following points, wherein an initial brief definition is followed by a more detailed explanation of the function connected therewith:
1. Measurement and acquisition of the electric energy consumptions . The known type electromechanical electricity meters, adopted in the present power consumption system, are apt to measure only one type of electric energy consumption, active or reactive; if both measurements are required, it is hence necessary to install two distinct electricity meters. The electronic electricity meter according to the present invention is instead apt to simultaneously measure both the active energy consumptions and the reactive energy consumptions .
2. Accuracy rating. According to standards, the electricity meter measures in class 1 for the active energy and in class 2 for the reactive energy. 3. Acquisition and registration of the consumptions profile. For each user it is possible to detect the charging curve, with a programmable integration period, particularly in the range from 1 minute to 1 hour. Thanks to the processing capacity of the electricity meter it is possible to reckon the elapse of consecutive time intervals and, for each of them, to memorize the power consumption inside the same.
4. Measurement and recording of the average and peak power. The electromechanical electricity meters normally used in the power consumption system are apt to measure only one type of power, active or reactive; if both measurements are required, it is hence necessary to install two electricity meters, as already mentioned for the electric energy consumptions. The electronic electricity meter according to the present invention is instead apt to simultaneously measure both the active power and the reactive power.
5. Distribution of the electric energy consumptions into different scales of charges. Thanks to its processing capacity, the electricity meter is apt to establish a table of different time scales in the space of a day, thereby making it possible to set out for each of them a respective cost value for the electric energy used up. The electricity meter is thus apt to integrate the consumptions with reference to the table of costs and to memorize, in the invoicing period, the total consumption of each time scale. In addition to this, said table of costs can be programmed not only on the basis of time profiles but also on the basis of power thresholds .
6. Control of several invoicing periods. It is possible to control at least two invoicing periods
(present and previous), also at variable intervals.
7. Control of two electric energy supply contracts. In the power range up to 35 kw, it is possible to control two electric energy supply contracts, namely an existing contract and the one to be applied in future. The electricity meter can be programmed to automatically switch over the contract - from the present one to the future one - upon reaching of a given date .
8. Control of the operations of disconnection and reconnection. These operations can be carried out automatically in relation to situations of discontinuance, suspension for delayed payments, contract variations. Thanks to its processing capacity, the electricity meter carries out these operations on the basis of remote controls (from the central server or from the respective concentrator) through the PLC network. It is hence not necessary for an operator to physically go on the site where the electricity meter is installed. 9. Possibility to operate in conditions of prepayment. The electricity meter can be programmed so as to compare the amount of electric energy used up with a preset limit (eventually apt to be modified by an external control) corresponding to a payment carried out in advance; as soon as said limit has been exceeded, the electric energy supply is automatically disconnected and suspended.
10. Selective cut-off for requirements of the electric system. The cut-off or suspension of the power supply can be necessary, generally on a local level, in case of blackout risks or of temporary overloads. This function is not implemented in a broadcast mode, but it is instead specifically addressed to each single electricity meter. From the centre (central server or concentrator) it is possible to send to the electricity meters, via PLC, a control for example to modify the highest power available in the actual meter, with a temporary effect, that is with no need to alter the power supply contract; this allows to obtain a lightening of the overall power required from the cabin.
11. Execution of an energy balance. At the level of a single cabin, or of a single concentrator, it is possible to do the sum of the measurements of the power consumption drawn from the single electricity meters depending from said cabin. This sum - periodically compared to the value of the total electric current withdrawn, or with the mean electric current value - supplies a useful indication to detect any non-standard electric current withdrawals and, therefore, also any unauthorized withdrawals.
12. Antifraud/tampering function. At the level of each electricity meter, a device is provided to perform this specific function, which is thus apt to eliminate the requirement to use seals and to periodically check the integrity of such seals. The change of power, available by contract, does not require - as said - to open the electricity meter in order to adjust the measuring equipment (shunt) ; it has thus been possible to realize the electricity meter as a sealed single block structure containing all the functions of measurement, control of the contracts, control of the opening/closing circuit of the power line. For the purpose of checking any possible attempts to open the sealed structure in the electricity meter, an electromechanical device has thus been incorporated which produces an alarm signal on the network of the system and said alarm signal can be removed only by adopting a procedure available to the operators .
13. Measuring and recording quality parameters of the service. The microprocessor incorporated in each electricity meter is apt to verify and memorize interruptions of electric energy supply and voltage variations (deviation of the voltage from the nominal value foreseen in the electric energy supply contract) . On the basis of this data, it is possible to determine the quality parameters of the service at the level of each delivery point of the electric energy being supplied.
14. Constant monitoring of the working conditions. The microprocessor incorporated in each electricity meter is apt to periodically verify (self- diagnostics) the conditions of the various hardware components of said meter and the congruency of the data stored in the memory. In case there should be any malfunctions, it is possible both to signal the same with appropriate service words (which are then read by the central system) , and to start immediate recovery procedures .
15. Possibility of bi-directional transmission of information. The system according to the invention allows not only to carry out operations directly connected to the supply of the service for which the system has been conceived, but also to send to the electricity meter and receive from the same other types of information ("information provider" service) . The electricity meter can display such information on its own visual display unit, or else transfer it onto other devices connected to the electric line of the user, downstream of the electricity meter, or even draw it therefrom; such devices are directly interfaced with the electricity meter via PLC, or else through a bridge-device acting as an intermediate bridge and communicating directly with the electricity meter via PLC. This gives the possibility to other subjects to use the system according to the invention as a remote control system allowing to connect oneself to ones own devices at the user's site.
16. Management of a calendar clock. Having allocated to the meter the calculation of consumptions as a function of the scale of charges, said meter requires a precise time reference (± 30 sec/month) ; this is obtained by means of local electronic circuitry (RealTimeClock) , the state of which may be remotely verified and synchronised (through external controls, via PLC or optical gate ZVEI ) and corrected, if need be, in case of excessive variations .
17. Set of displayable data. On the local display of the meter (for example of the 16x1 alphanumeric + icons type) , a whole series of data may be programmed. The presence of electronic components allows to provide additional functions such as locally displaying to the user consumptions and costs data, generic messages or messages providing information about the service, or indicating the functional state of said meter to the service staff (diagnostics) . 18. Opening the power circuit. A modular element equipped with a suitable releasing element apt to be opened by remote control is integrated into the meter. A single box hosts both the electronic components apt to perform the meter functions described so far, and the electromechanical components apt to open/close the electrical power line. This way, the electromechanical components, besides operating autonomously at the highest power, may also be directed on request of the central unit or in the presence of local conditions detected by the electronic part (e.g. when the contract expires) .
19. Quick installation of the meter. Having to replace a high number of devices at users' locations in a short time, the invention provides a meter group in two parts, namely a wedge as a base and a controlling and managing body, the two parts being connectable through connecting pliers and a bayonet joint.
20. Local interconnectability with external devices. The PLC communication system requires the availability of complex hardware and software means. In order to guarantee both the accessibility of the data contained in the concentrators and meters even by simple devices (e.g. handheld PCs) available to a user, and the availability of a second communication line substituting the network in case the latter is interrupted; an optical ZVEI gate is also associated to the meter. Said gate only requires the external device to have a simple RS-232 serial gate (available in almost every PC) .
21. Safety/protection of the PLC communication. The data transferred from the concentrator to the meters or from the latter to the central server have different privacy degrees. For those not considered highly reserved, the protection mechanisms implemented by the functions managing the PLC communication protocol, apt to guarantee the delivery of the messages, is sufficient. For critical data, an additional mechanism has been added - e.g. based on an authentication key - at the level of message interpreting and managing procedure, apt to guarantee the non-modifiability and/or readability of said messages by third parties outside the service.
22. Automatic recognition of the installation of the meter. This function must be present for two reasons: one is technical, related to the PLC communication mechanisms, the other is fiscal, in order to detect potential fraud by users.
23. Distant meters reachability. The PLC communication method uses a physical support (electric line) that does not guarantee homogeneous conduction of the signal in every point of the network, for which reason meters may not be reachable by the concentrator. Therefore, the concentrator may require one or more meters (which are able "see" the non-reachable meter) to act as bridges, forwarding the message to the non- reachable meter. It is indeed a repetition mechanism,' which allows to solve the problem of reachability via network.
24. Automatic recognition of the repetition path. When informed of the presence of a new meter, the concentrator checks its reachability. If it is not reachable, it tries to detect one or more different meters that can "see" the non-directly reachable meter. These meters are detected, the detecting parameters stored, and then subsequently used as an intermediate bridge.
25. Data maintenance in voltage drop conditions. The substitution of the mechanical devices recording the consumption (numbered knob) with electronic components (volatile memories) would imply the loss of the consumption data if the power from the providing company were interrupted. In order to avoid this, a non-volatile memory, preferably a ferro electric RAM (FRAM) , has been used in the system, apt to guarantee the maintenance of the data throughout the useful life of the electricity meter (15 years).
26. Downloading the managing programmes. In order to guarantee the developing and/or corrective maintenance of the functions performed by the programs installed in the system devices, it is possible to modify said programs without interrupting the fundamental activities of said devices and without having to go where they are; the activity is performed using the PLC communication mechanisms used by the control centre to manage the devices .
27. Detection of the line switch opening. When one of the output lines from the power supply cabin - where the concentrator is - is out of order due to the opening of the line protection switch, the concentrator, on the basis of the failure to communicate with all the meters supplied by that line, indicates to the central server an out-of- service line alarm condition.
It is however understood that this list should not be intended as limiting the scope of the invention. This description intends to highlight by way of examples how the main functions are distributed between the three components (meters, concentrators and central unit) of the system according to the invention, considered the functional abilities of these three components, as better specified hereinafter and in the claims.
In other words, in order to achieve the basic idea of the present invention, synthetically indicated as "intelligence allocation", it is preferable that:
a) the meters be at least allocated at least one of the functions indicated at numbers 1), 5), 12) and 25); but also, preferably, the functions indicated at numbers 2), 3), 4), 6), 7) 12), 13), 16), 17) 18, 19), 20) and 25) are performed in the meters;
b) the meters be able to manage, together with the concentrators and the server, also at least one of the functions indicated at numbers 9), 14), 15), 21), 22), 23) and 26);
c) the concentrators be at least allocated at least one of the functions indicated at numbers 11) and 14), as well as those of PLC network master and TLC network node, but also, preferably, the functions indicated at numbers 20) and 24) are performed in concentrators;
d) the central server be at least allocated one or more of the functions indicated at numbers 8), 10), 17) and 26), but the function indicated at numbers 9) and 21) is also preferably performed in the central server, as well as the function, of course, of TLC network master, and other potential invoicing and managing functions (not concerning this patent application) .
In other words, the intelligence of the system is distributed between the central unit, concentrators and meters so that each of these three elements of the system has its own processing ability, although limited as regards the meters, but sufficient in order to relevantly reduce the requirements of data transmission through bidirectional transmission; these requirements being limited, on the one hand, by the reduction of the quantity of transmitted data or, on the other hand, by the delay of their transmission to times when the transmission lines are less busy.
It is however understood that the invention should not be intended as limited to the particular arrangement illustrated above, which only represents an exemplary embodiment thereof, but that also different alternatives are possible, all within the grasp of an expert in the art, without thereby departing from the protective scope thereof, as defined by the following claims.

Claims

System for the remote acquisition of data and for the remote control of the targets of users spread over a vast territory, of the type comprising electricity meters, equipped with means to measure the electric energy consumptions and associated to each user, intermediate stations or concentrators, to each of which a set of meters is connected by first means for the bi-directional transmission of data, said concentrators being in turn all connected to a central control and supervision unit through second means for the bi-directional transmission of data,
characterised in that
- the intelligence of the system is distributed between the central unit, the concentrators and the electricity meters;
a set of a limited number of electricity meters is connected downstream of each concentrator, each meter incorporating, in addition to said means to measure the electric energy consumptions: means to transduce the measured values into measuring data meant to be processed; at least a first processor to process said measuring data; at least a first data memory and a first programme memory, as well as first means for the bi-directional transmission towards the associated concentrator; the output of said first processor being connected to said first data memory and/or to said first bi-directional transmission means, so as to at least temporarily store and/or respectively transmit the data which have already undergone a first processing;
a plurality of concentrators is connected downstream of the central unit, each concentrator incorporating: at least a second programme memory, at least a second microprocessor for further processing said data processed by the meters, at least a second data memory to store the data issued by said meters and/or by said second microprocessor, as well as second means for the bi-directional transmission towards the central server, the output of said second processor being connected to said second data memory and/or to said second bi-directional transmission means, so as to at least temporarily store and/or respectively transmit said further processed data.
2. System for the remote acquisition of data and for the remote control of the distributed targets of users, as in claim 1) , wherein said first processor incorporated in each electricity meter performs at least the following functions: (1) acquisition of the electric energy consumptions, (5) distribution of the electric energy consumptions into different scales of charges, (12) estimate of the tampering attempts and control of an antifraud device, and (25) transfer and maintenance of the stored data at least during the voltage drop .
3. System as in claim 2, wherein the function (5) of distributing the electric energy consumptions into different scales of charges is programmed on the basis of time profiles and/or power thresholds.
4. System as in claim 2, wherein said first processor also performs the function (3) of acquiring and recording the profile of the electric energy consumptions of the user (charging curve) .
5. System as in claim 4, wherein the function (3) of acquiring and recording the profile of the electric energy consumptions is performed with a programmable integration period (from 1 min. to 1 hour) .
6. System as in claim 2, wherein said first processor also performs the function (4) of measuring and recording the average and peak power (active and reactive) .
7. System as in claim 2, wherein said first processor also performs the function (6) of managing two separate invoicing periods at variable intervals (present and previous) .
8. System as in claim 2, wherein said first processor also performs the function (7) of managing two distinct electric energy supply contracts in the power range up to 35 kw (present and future) .
9. System as in claim 2, wherein said first processor also performs the function (13) of measuring and recording the quality parameters of the service, such as interruptions and deviations of the voltage from the nominal value indicated in the electric energy supply contract.
10. System as in claim 2, wherein said first processor also performs the function (16) of managing, with the required precision (± 30 sec. /month), a calendar clock apt to be remotely synchronised.
11. System as in claim 2, wherein said first processor performs also the function (18) of opening the power circuit integrated in the electricity meter.
12. System as in claim 11, wherein said first processor adopts, for the function (18) of opening the power circuit, a modular element (DIN standard) equipped with a suitable releasing element apt to be opened by remote control .
13. System as in claims 1 and 2, wherein said first data memory is preset so as to perform the function (25) of maintaining the stored data, also during voltage drop, throughout the useful life of the electricity meter (15 years) .
14. System as in claim 2, wherein said first processor also performs the function (17) of displaying data on the electric energy consumption and/or the operation of the electricity meter.
15. System for the remote acquisition of data and for the remote control of the distributed targets of users, as in claim 1, wherein said second processor of each concentrator performs the double function of master of the PLC (power line carrier) network, for what concerns the communications on the power supply line between the actual concentrator and the electricity meters and, respectively, of a node of the TLC network, for what concerns the communications on the telephone line between the concentrator and the central server.
16. System for the remote acquisition of data and for the remote control of the distributed targets of users, as in claim 1 or 15, wherein said second processor of each concentrator performs at least the following additional functions: (11) execution of an energy balance for what concerns the single power supply substation into which the concentrator is installed; (14) constant monitoring of the working conditions of each electricity meter connected thereto and issue of an alarm signal in case the self-diagnostics of the meter should indicate a malfunction.
17. System as in claim 15, wherein said second processor of each concentrator performs, in association with said energy balance, a function (11) of detecting any unauthorized withdrawals.
18. System as in claim 15, wherein said second processor of each concentrator also performs a function (24) of automatic identification of the repeating path.
19. System for the remote acquisition of data and for the remote control of the distributed targets of users, as in claim 1, wherein the unit of the central server performs at least the following functions: (8) automatic management of the operations of disconnection, reconnection, discontinuances, suspensions for delayed payments and contract variations; (10) selective cut-off of the power supply due to requirements of the electric system (black-out risk or temporary overloads); and (26) downloading of the operating programs .
20. System as in claim 19, wherein the unit of the central server also performs an operative function (9) in conditions of prepayment.
21. System as in claim 19, wherein the central server unit also performs a function (21) of safety and/or protection of the PLC communication with authentication key.
22. System as in claim 19, wherein the central server unit also performs a function (17) of displaying the operating data of the server and/or of the network.
3. System as in claims 1, 2, 15 or 19, wherein the unit of the central server also performs - by means of the concentrators and in cooperation with the electricity meters, on the communication network between these three units - a function of bi-directional transmission of information meant for the automation of services implemented by subjects other than the owner of the networks .
PCT/EP2002/014687 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters WO2003055031A2 (en)

Priority Applications (13)

Application Number Priority Date Filing Date Title
CA2471267A CA2471267C (en) 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters
DE60209552T DE60209552T2 (en) 2001-12-20 2002-12-20 System for remote reading and control of electrical energy consumption
US10/499,691 US7271735B2 (en) 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters
BRPI0215173A BRPI0215173B8 (en) 2001-12-20 2002-12-20 SYSTEM FOR REMOTE DATA ACQUISITION AND REMOTE CONTROL OF TARGET USERS DISTRIBUTED THROUGHOUT A TERRITORY
SI200230307T SI1456676T1 (en) 2001-12-20 2002-12-20 System for remote reading and control of electric energy consumption
AU2002361201A AU2002361201A1 (en) 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters
DK05006537T DK1548451T3 (en) 2001-12-20 2002-12-20 Remote reading and control system for electrical energy consumption
JP2003555643A JP4705755B2 (en) 2001-12-20 2002-12-20 System for remote acquisition of electrical energy consumption, including for home use and remote control of distributed target users
KR1020047009703A KR100940246B1 (en) 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters
EP02796713A EP1456676B1 (en) 2001-12-20 2002-12-20 System for remote reading and control of electric energy consumption
HK05107551A HK1075293A1 (en) 2001-12-20 2005-08-29 System for the remote data acquisition and controlof electric energy meters
CY20061100526T CY1105438T1 (en) 2001-12-20 2006-04-17 REMOTE DATA ACQUISITION AND REMOTE CONTROL OF ELECTRICITY METERS
US11/808,822 US8072348B2 (en) 2001-12-20 2007-06-13 System for the remote acquisition of the electric energy consumptions and for the remote control of the distributed targets of users, also of domestic type

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITMI2001A002726 2001-12-20
IT2001MI002726A ITMI20012726A1 (en) 2001-12-20 2001-12-20 SYSTEM OF REMOTE CONSUMPTION OF CONSUMPTION AND REMOTE MANAGEMENT OF USERS ALSO DISTRIBUTED OF A DOMESTIC TYPE

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US10499691 A-371-Of-International 2002-12-20
US11/808,822 Division US8072348B2 (en) 2001-12-20 2007-06-13 System for the remote acquisition of the electric energy consumptions and for the remote control of the distributed targets of users, also of domestic type

Publications (3)

Publication Number Publication Date
WO2003055031A2 WO2003055031A2 (en) 2003-07-03
WO2003055031A3 WO2003055031A3 (en) 2003-12-11
WO2003055031A9 true WO2003055031A9 (en) 2004-09-10

Family

ID=11448728

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2002/014687 WO2003055031A2 (en) 2001-12-20 2002-12-20 System for the remote data acquisition and control of electric energy meters

Country Status (19)

Country Link
US (2) US7271735B2 (en)
EP (2) EP1456676B1 (en)
JP (2) JP4705755B2 (en)
KR (1) KR100940246B1 (en)
CN (1) CN100346165C (en)
AT (2) ATE365331T1 (en)
AU (1) AU2002361201A1 (en)
BR (1) BRPI0215173B8 (en)
CA (2) CA2471267C (en)
CY (1) CY1105438T1 (en)
DE (2) DE60209552T2 (en)
DK (2) DK1456676T3 (en)
ES (2) ES2258666T3 (en)
HK (1) HK1075293A1 (en)
IT (1) ITMI20012726A1 (en)
PT (2) PT1548451E (en)
RU (1) RU2314542C2 (en)
SI (2) SI1456676T1 (en)
WO (1) WO2003055031A2 (en)

Families Citing this family (112)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7554459B2 (en) * 2003-07-17 2009-06-30 Enel Distribuzione S.P.A. Method and system for remote updates of meters for metering the consumption of electricity, water or gas
JP3878963B2 (en) * 2004-03-25 2007-02-07 アイピー・パワーシステムズ株式会社 Power system for multiple power consumer gathering areas
ATE487950T1 (en) 2004-06-15 2010-11-15 Enel Distribuzione Spa MONITORING COUNTER WITH SAFETY SHUT-OFF
AU2016202559B2 (en) * 2004-06-24 2018-05-10 X2M Connect Limited A meter device
US8606891B2 (en) 2004-09-10 2013-12-10 Freestyle Technology Pty Ltd Client processor device for building application files from file fragments for different versions of an application
US8041792B2 (en) * 2004-06-24 2011-10-18 Freestyle Technology Pty Ltd Client processor device for building application files from file fragments for different versions of an application
AU2013203294B2 (en) * 2004-06-24 2016-01-21 X2M Connect Limited A meter device
US8700754B2 (en) * 2004-10-19 2014-04-15 Echelon Corporation Automated topology discovery and management for electric meters
JP4771688B2 (en) * 2004-12-20 2011-09-14 中国電力株式会社 Authentication system when using energy
US8995448B2 (en) 2005-04-06 2015-03-31 Power One Italy S.P.A. Method for transmission of information between nodes of a network and network using said method
EP1867108B1 (en) 2005-04-06 2010-12-01 Power-One Italy S.p.a. Method for transmission of information between nodes of a network and network using said method
EP1713296A1 (en) * 2005-04-15 2006-10-18 Acea Distribuzione S.p.A. Remote managing and controlling system for supplying electric energy
ITMI20050677A1 (en) 2005-04-18 2006-10-19 Sisvel Spa CONNECTION SYSTEM BETWEEN A SERVICE CENTER AND A PLURALITY OF TV RECEPTION DEVICES
ITBO20060403A1 (en) 2006-05-25 2007-11-26 Alfa Centauri S P A METHOD FOR THE OPERATION OF A SOLENOID VALVE ASSOCIATED WITH A GAS COUNTER AND DEVICE INTENDED TO ACTUATE IT
FR2901604A1 (en) * 2006-05-29 2007-11-30 Metercom Soc Par Actions Simpl Measured metrological information e.g. gas flow consumption information, managing system for e.g. building, involves managing unit with processing unit processing information transmitted by meters placed by stacking on case`s edge
WO2007142587A2 (en) * 2006-06-08 2007-12-13 Dlc Sweden Ab System for power line communication
FR2904486B1 (en) 2006-07-31 2010-02-19 Jean Marc Oury METHOD AND SYSTEM FOR REAL TIME MANAGEMENT AND MODULATION OF ELECTRICAL CONSUMPTION.
US20100106836A1 (en) * 2007-02-12 2010-04-29 Koninklijke Philips Electronics N.V. Networked control system and device for a networked control system
US20080249826A1 (en) * 2007-03-26 2008-10-09 Jeff Tolnar System and method for integrated asset protection
US9464917B2 (en) * 2007-07-18 2016-10-11 Silver Spring Networks, Inc. Method and system of reading utility meter data over a network
CN101803138B (en) * 2007-09-21 2013-08-28 西门子公司 Decentralized energy system and method for distributing energy in a decentralized energy system
US8334787B2 (en) 2007-10-25 2012-12-18 Trilliant Networks, Inc. Gas meter having ultra-sensitive magnetic material retrofitted onto meter dial and method for performing meter retrofit
CA2705074A1 (en) 2007-11-25 2009-05-28 Trilliant Networks, Inc. Energy use control system and method
US20090136042A1 (en) * 2007-11-25 2009-05-28 Michel Veillette Application layer authorization token and method
US8138934B2 (en) 2007-11-25 2012-03-20 Trilliant Networks, Inc. System and method for false alert filtering of event messages within a network
EP2215556B1 (en) 2007-11-25 2019-08-28 Trilliant Networks, Inc. System and method for transmitting power status notifications in an advanced metering infrastructure network
US20090135762A1 (en) 2007-11-25 2009-05-28 Michel Veillette Point-to-point communication within a mesh network
WO2009067252A1 (en) * 2007-11-25 2009-05-28 Trilliant Networks, Inc. Proxy use within a mesh network
CA2714026A1 (en) 2007-11-25 2009-05-28 Trilliant Networks, Inc. System and method for transmitting and receiving information on a neighborhood area network
DK2085749T3 (en) 2008-01-31 2017-07-03 Enel Distribuzione Spa Method and system for remotely measuring the consumption of electricity, water or gas
EP2096416B1 (en) 2008-02-28 2016-09-28 Alcatel Lucent Management platform and associated method for managing smart meters
US8121741B2 (en) * 2008-05-09 2012-02-21 International Business Machines Corporation Intelligent monitoring of an electrical utility grid
FR2932352B1 (en) * 2008-06-05 2010-07-30 Sagem Comm METHOD FOR REMOTELY MEASURING ELECTRICAL METERS
US8699377B2 (en) 2008-09-04 2014-04-15 Trilliant Networks, Inc. System and method for implementing mesh network communications using a mesh network protocol
US8289182B2 (en) 2008-11-21 2012-10-16 Trilliant Networks, Inc. Methods and systems for virtual energy management display
MX2009000777A (en) * 2009-01-13 2010-07-15 Jose Eduardo Escobar Castelo System for remote power control and management with an automatically protected bidirectional electric power meter, detection of power theft and protection against overloads and short-circuits, and a system for connection, disconnection and communicat
US8891338B2 (en) 2009-01-29 2014-11-18 Itron, Inc. Measuring the accuracy of an endpoint clock from a remote device
CA2753074A1 (en) 2009-03-11 2010-09-16 Trilliant Networks, Inc. Process, device and system for mapping transformers to meters and locating non-technical line losses
GB2465638B (en) 2009-03-13 2011-03-02 Energeno Ltd Current measuring device
CN102439990A (en) * 2009-03-31 2012-05-02 自由式科技控股有限公司 A communications process and system associated with monitoring and controlling resource consumption
CN102484503A (en) * 2009-06-05 2012-05-30 立维腾制造有限公司 Smart grid over power line communication network
EP2282384A1 (en) 2009-07-30 2011-02-09 Ormazabal Protection & Automation, S.L.U. Management, automation and communications cabinet for an electric power distribution installation
US8781462B2 (en) 2009-09-28 2014-07-15 Itron, Inc. Methodology and apparatus for validating network coverage
MX2009012122A (en) * 2009-11-09 2011-05-19 Prolec Ge Internacional S De R L De C V Apparatus, method and system for measuring, monitoring and regulating the power consumed by users connected to a distribution transformer.
JP2011155711A (en) * 2010-01-25 2011-08-11 Sony Corp Power management apparatus and method of providing game contents
GB2479922B (en) 2010-04-29 2014-05-21 Toshiba Res Europ Ltd Data transmission apparatus and method
MY167307A (en) * 2010-07-30 2018-08-16 Accenture Global Services Ltd Intelligent core engine
US9084120B2 (en) 2010-08-27 2015-07-14 Trilliant Networks Inc. System and method for interference free operation of co-located transceivers
KR101093376B1 (en) 2010-09-03 2011-12-14 엘에스산전 주식회사 Method for energy management
CA2813534A1 (en) 2010-09-13 2012-03-22 Trilliant Networks, Inc. Process for detecting energy theft
JP2012105463A (en) * 2010-11-10 2012-05-31 Chugoku Electric Power Co Inc:The Failure determination system
WO2012068045A2 (en) 2010-11-15 2012-05-24 Trilliant Holdings Inc. System and method for securely communicating across multiple networks using a single radio
KR101527617B1 (en) * 2010-12-09 2015-06-09 엘에스산전 주식회사 Load control method
IT1403787B1 (en) 2010-12-28 2013-10-31 Ist Superiore Mario Boella METHOD FOR THE MANAGEMENT OF CONSUMPTION AND / OR PRODUCTION DYNAMICS ELECTRIC DIENERGY AND ITS DEVICE
US8635036B2 (en) * 2011-01-04 2014-01-21 General Electric Company Systems, methods, and apparatus for providing energy management utilizing a power meter
WO2012097204A1 (en) 2011-01-14 2012-07-19 Trilliant Holdings, Inc. Process, device and system for volt/var optimization
WO2012103072A2 (en) 2011-01-25 2012-08-02 Trilliant Holdings, Inc. Aggregated real-time power outages/restoration reporting (rtpor) in a secure mesh network
EP3285459B1 (en) 2011-02-10 2022-10-26 Trilliant Holdings, Inc. Device and method for coordinating firmware updates
ES2398178B1 (en) * 2011-02-25 2014-01-27 Ziv Aplicaciones Y Tecnología S.L. SYSTEM AND PROCEDURE FOR THE DETECTION OF COUNTERS ASSOCIATED WITH A FUSE OF TRANSFORMATION CENTERS.
US9041349B2 (en) 2011-03-08 2015-05-26 Trilliant Networks, Inc. System and method for managing load distribution across a power grid
WO2012142682A1 (en) * 2011-04-18 2012-10-26 "Add - Bulgaria" Ood System for remote reading, data processing, and management of the consumption of electric energy
RU2456623C1 (en) * 2011-04-26 2012-07-20 Олег Фёдорович Меньших Device for active energy electric metres verification
CN102305922B (en) * 2011-05-25 2013-09-04 湖南省电力公司科学研究院 On-load detection method and device for intelligent optical fiber electric energy meter in substation
US20140114489A1 (en) * 2011-06-10 2014-04-24 Enthenergy, Llc. Sustainable energy efficiency management system
RU2474827C1 (en) * 2011-07-21 2013-02-10 Общество с ограниченной ответственностью "АРГО-ЦЕНТР" Multimedia system to monitor and control power resources
US9001787B1 (en) 2011-09-20 2015-04-07 Trilliant Networks Inc. System and method for implementing handover of a hybrid communications module
KR101715951B1 (en) * 2011-10-10 2017-03-27 한국전력공사 System and method for acquiring power quality data
BRPI1105842B1 (en) 2011-11-03 2016-04-26 Inácio Loiola Pereira Campos secondary distribution network control, measurement and monitoring system and process with detection of fraud and theft of electricity
CN102541051B (en) * 2012-01-11 2013-12-11 山西万立科技有限公司 Explosion-proof embedded type front-end controller for special monitoring network for coal output
AU2013204454B2 (en) * 2012-10-04 2016-05-12 Ecocentric Group Limited Electrical energy consumption diagnostic device, system and method
CN104678348B (en) * 2012-10-29 2018-06-08 江苏省电力公司常州供电公司 Remote monitoring and diagnosing method for electric energy metering device with high efficiency
CN104656051B (en) * 2012-10-29 2018-09-21 国网江苏省电力公司常州供电公司 Remote monitoring and diagnosing method for electric energy metering device with good real-time performance
CN104614700B (en) * 2012-10-29 2018-07-20 国网江苏省电力有限公司常州供电分公司 Remote monitoring and diagnosing method for electric energy metering device with good real-time performance
CN104635198B (en) * 2012-10-29 2018-09-21 国网江苏省电力公司常州供电公司 Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function
CN104656050B (en) * 2012-10-29 2018-09-21 国网江苏省电力公司常州供电公司 Manpower-saving remote monitoring and diagnosing method for electric energy metering device
CN102914761B (en) * 2012-11-14 2014-12-31 浙江省电力公司电力科学研究院 System and method for monitoring quality of intelligent electric energy meter
US9952061B2 (en) * 2013-01-25 2018-04-24 Hewlett Packard Enterprise Development Lp Detecting fraud in resource distribution systems
AU2014200964B2 (en) * 2013-02-25 2016-04-28 Nexans A Line Break Detection System
US9424742B1 (en) * 2013-04-30 2016-08-23 Southern Company Services, Inc. Notification system, method, and computer application based on decision rules for evaluating a plurality of utility meter conditions
CN103280095A (en) * 2013-06-09 2013-09-04 杭州佳和电气有限公司 Self-healing technology for electric energy collection system
CN104283675A (en) * 2013-07-10 2015-01-14 中兴通讯股份有限公司 Concentrator, electricity meter and message processing method of concentrator and electricity meter
CN103473639A (en) * 2013-09-04 2013-12-25 广西百色矿务局有限公司 Method and system for intelligent supervision of coal mine safety production
CN103455358A (en) * 2013-09-18 2013-12-18 杭州海兴电力科技股份有限公司 Upgrading method of electric energy meter program
FR3011938B1 (en) * 2013-10-16 2015-12-11 Schneider Electric Ind Sas METHOD FOR DETERMINING INDIVIDUAL POWER CONSUMPTION
US10050799B2 (en) 2014-01-28 2018-08-14 Patched Conics, LLC. Power control system and method, and information communication ability control system and method
KR101422682B1 (en) * 2014-02-18 2014-09-25 주식회사 인코어드 테크놀로지스 An energy measuring apparatus at penetration point of power and labeling system comprising the energy measuring apparatus
US10073426B1 (en) * 2014-08-11 2018-09-11 Energybill.Com, Llc System, apparatus and method for energy management, for usage by consumers of energy from electric utility service providers, and monitoring and management of same
CN104198972A (en) * 2014-09-05 2014-12-10 国家电网公司 Concentrator for automated test of assembly line field calibration
CN104267374B (en) * 2014-10-17 2017-09-26 成都思晗科技股份有限公司 Metering device on-line checking and status assessing system
RU2616759C2 (en) * 2015-04-08 2017-04-18 Общество С Ограниченной Ответственностью "Авп Технология" Vehicle onboard devices parameters monitoring device
KR101977399B1 (en) * 2015-07-28 2019-05-13 엘에스산전 주식회사 System of providing an electric energy information and method thereof
CN105067771B (en) * 2015-07-31 2017-04-19 国网浙江兰溪市供电公司 Power transmission frame-based environment monitoring method
US11172273B2 (en) 2015-08-10 2021-11-09 Delta Energy & Communications, Inc. Transformer monitor, communications and data collection device
US10055869B2 (en) 2015-08-11 2018-08-21 Delta Energy & Communications, Inc. Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components
WO2017041093A1 (en) 2015-09-03 2017-03-09 Delta Energy & Communications, Inc. System and method for determination and remediation of energy diversion in a smart grid network
CN105044657B (en) * 2015-09-11 2017-12-19 成都思晗科技股份有限公司 Gate energy meter monitoring system
CA3000206C (en) 2015-10-02 2023-10-17 Delta Energy & Communications, Inc. Supplemental and alternative digital data delivery and receipt mesh network realized through the placement of enhanced transformer mounted monitoring devices
WO2017070646A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Data transfer facilitation across a distributed mesh network using light and optical based technology
WO2017070648A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle technology
CN105301306A (en) * 2015-12-01 2016-02-03 广东长电成套电器有限公司 Intelligent ammeter
CN105471109B (en) * 2015-12-22 2017-12-01 华南理工大学 Towards the Intelligent electricity utilization management system and its management method of family wind-solar hybrid power station
MX2018010238A (en) 2016-02-24 2019-06-06 Delta Energy & Communications Inc Distributed 802.11s mesh network using transformer module hardware for the capture and transmission of data.
EP3483614A4 (en) * 2016-07-07 2020-04-08 Saletti, Luiz Paulo Digital electronic meter for electrical magnitudes with six or more measurement elements
WO2018035143A1 (en) 2016-08-15 2018-02-22 Delta Energy & Communications, Inc. Integrated solution of internet of things and smart grid network
CN106546946A (en) * 2016-12-08 2017-03-29 国网江西省电力公司电力科学研究院 A kind of non-linear operating condition emulation platform of electric energy meter
RU2669188C1 (en) * 2017-04-18 2018-10-09 Владислав Валерьевич Каменский System for distribution of electricity
CN108599162A (en) * 2018-07-27 2018-09-28 珠海格力电器股份有限公司 Peak regulation control method, device and system
CN108955802A (en) * 2018-08-29 2018-12-07 江阴市立信智能设备有限公司 A kind of method of intelligent water meter system acquisition water consumption
US11513148B2 (en) 2018-10-11 2022-11-29 Hydro-Quebec Method, system and software product to identify installations likely to exhibit an electrical non-conformity
CL2020000868A1 (en) * 2020-04-01 2022-01-21 Univ Pontificia Catolica Chile System and method of control and management of energy demand in electrical systems
CN112054596B (en) * 2020-09-09 2021-12-14 国网信通亿力科技有限责任公司 System and method for acquiring running data of power distribution network in real time
US11899516B1 (en) 2023-07-13 2024-02-13 T-Mobile Usa, Inc. Creation of a digital twin for auto-discovery of hierarchy in power monitoring

Family Cites Families (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE878892C (en) 1951-12-22 1953-06-08 Rockinger Spezial Fab Joh Trailer hitch
DE1087211B (en) 1957-03-16 1960-08-18 Krone Kg Loetoesenstrip
US4427968A (en) 1981-04-09 1984-01-24 Westinghouse Electric Corp. Distribution network communication system with flexible message routes
US4638298A (en) * 1985-07-16 1987-01-20 Telautograph Corporation Communication system having message repeating terminals
US4803632A (en) 1986-05-09 1989-02-07 Utility Systems Corporation Intelligent utility meter system
CN1039687A (en) * 1989-09-01 1990-02-14 涂钜达 The multifunctional microcomputer control system of synchronous machine
US5216623A (en) * 1990-06-06 1993-06-01 M. T. Mcbrian, Inc. System and method for monitoring and analyzing energy characteristics
US5311068A (en) 1991-05-22 1994-05-10 General Electric Company Solid-state energy meter with time-of-use rate scheduling and load control circuit
US5315531A (en) * 1991-08-15 1994-05-24 Westinghouse Electric Corp. Energy monitoring system for a plurality of local stations with snapshot polling from a central station
US5239584A (en) * 1991-12-26 1993-08-24 General Electric Corporation Method and apparatus for encryption/authentication of data in energy metering applications
MX9206230A (en) 1992-02-21 1993-09-01 Abb Power T & D Co IMPROVEMENTS IN AN ELECTRICAL ACTIVITY METER AND METHODS FOR THE USE OF THE SAME.
US5631554A (en) 1993-03-26 1997-05-20 Schlumberger Industries, Inc. Electronic metering device including automatic service sensing
GB9313200D0 (en) 1993-06-25 1993-08-11 Remote Metering Systems Ltd Electric supply control
US5467286A (en) * 1993-11-03 1995-11-14 Square D Company Metering unit with downloadable firmware
JPH085398A (en) * 1994-06-16 1996-01-12 Tokyo Gas Co Ltd Control system for gas meter
US5696501A (en) * 1994-08-02 1997-12-09 General Electric Company Method and apparatus for performing the register functions for a plurality of metering devices at a common node
JPH0869594A (en) * 1994-08-30 1996-03-12 Tokyo Gas Co Ltd Meter reading device
EP0723358A2 (en) 1995-01-19 1996-07-24 American Innovations, Ltd Method and apparatus for automatic meter reading and local communication
US6195018B1 (en) * 1996-02-07 2001-02-27 Cellnet Data Systems, Inc. Metering system
US5892758A (en) 1996-07-11 1999-04-06 Qualcomm Incorporated Concentrated subscriber wireless remote telemetry system
EP1019882A1 (en) * 1996-09-06 2000-07-19 Innovatec Corporation Automatic meter reading data communication system
RU2140654C1 (en) 1996-10-30 1999-10-27 Общество с ограниченной ответственностью "Научно-производственное предприятие "Резонанс" Method of metering of power requirement on rolling stock of electric transport and electronic meter for its realization
US6044062A (en) 1996-12-06 2000-03-28 Communique, Llc Wireless network system and method for providing same
JPH10206199A (en) * 1997-01-21 1998-08-07 Ishikawa Seisakusho:Kk Method and apparatus for automatically reading meter
US7046682B2 (en) * 1997-02-12 2006-05-16 Elster Electricity, Llc. Network-enabled, extensible metering system
DE19720315C1 (en) * 1997-05-15 1998-07-09 Itf Edv Froeschl Gmbh Tariff charge calculation method for water, gas or electricity supply services
JPH1131288A (en) * 1997-07-11 1999-02-02 Hitachi Ltd Automatic intelligent-type metering system
US6538577B1 (en) * 1997-09-05 2003-03-25 Silver Springs Networks, Inc. Electronic electric meter for networked meter reading
US5986574A (en) * 1997-10-16 1999-11-16 Peco Energy Company System and method for communication between remote locations
JPH11252727A (en) * 1998-02-26 1999-09-17 Kyoto Trust Kk Monitor for distribution facility and remote monitoring system
DE19810335A1 (en) 1998-03-11 1999-09-30 Aventis Res & Tech Gmbh & Co Intelligent connection unit for timely and automatic acquisition and transmission of energy and process data
US6100817A (en) 1998-03-17 2000-08-08 Abb Power T&D Company Inc. Fixed network RF communications complaint with CEBus protocol
US6618709B1 (en) * 1998-04-03 2003-09-09 Enerwise Global Technologies, Inc. Computer assisted and/or implemented process and architecture for web-based monitoring of energy related usage, and client accessibility therefor
US6236197B1 (en) 1998-05-15 2001-05-22 Abb Power T&D Company Inc. Apparatus and method for detecting tampering in a multiphase meter
US6327541B1 (en) * 1998-06-30 2001-12-04 Ameren Corporation Electronic energy management system
JP2000020399A (en) * 1998-06-30 2000-01-21 Hitachi Ltd Virtual computer system
JP2000148867A (en) * 1998-11-06 2000-05-30 Tajima Kiko:Kk Automobile maintenance bill outputting device
JP2000207672A (en) * 1999-01-11 2000-07-28 Omron Corp System and method for wireless meter-reading
JP2000286757A (en) * 1999-03-31 2000-10-13 Osaka Gas Co Ltd Power line carrier communication equipment for automatic metering system, power line carrier communication system and automatic metering system
CN1248695A (en) * 1999-07-23 2000-03-29 李庄 Intelligent water, electricity, gas three-meter telephone network long distance centralized reading-out system
JP2001086574A (en) * 1999-09-14 2001-03-30 Toyo Commun Equip Co Ltd Remote metering system
JP2001095048A (en) * 1999-09-21 2001-04-06 Omron Corp Radio communication method and radio communication terminal
AT408490B (en) * 1999-09-22 2001-12-27 Siemens Ag Oesterreich METHOD FOR DETERMINING THE ENERGY RELATIONSHIP
JP4279960B2 (en) * 1999-11-25 2009-06-17 オムロン株式会社 Wireless data meter reading system and radio wave condition detection method
US6885309B1 (en) * 2000-06-01 2005-04-26 Cellnet Innovations, Inc. Meter to internet pathway
JP2001203744A (en) * 2000-01-19 2001-07-27 Soriton Syst:Kk Communication equipment
JP2001243581A (en) * 2000-03-01 2001-09-07 Tokyo Gas Co Ltd Measuring device and measuring monitoring system
CN2437070Y (en) * 2000-08-02 2001-06-27 孟震峰 Self-fault diagnosis type power distributor
US6738693B2 (en) * 2000-12-20 2004-05-18 Landis+Gyr Inc. Multiple virtual meters in one physical meter
CN1154838C (en) * 2001-04-23 2004-06-23 陈恬 Instruction guide method and system

Also Published As

Publication number Publication date
CA2819916A1 (en) 2003-07-03
EP1456676B1 (en) 2006-03-01
DE60209552D1 (en) 2006-04-27
US7271735B2 (en) 2007-09-18
JP4903884B2 (en) 2012-03-28
EP1548451B1 (en) 2007-06-20
DK1456676T3 (en) 2006-07-03
DK1548451T3 (en) 2007-10-15
PT1456676E (en) 2006-05-31
KR20040078648A (en) 2004-09-10
EP1456676A2 (en) 2004-09-15
ATE365331T1 (en) 2007-07-15
DE60209552T2 (en) 2006-12-21
AU2002361201A8 (en) 2003-07-09
JP2005513900A (en) 2005-05-12
BR0215173A (en) 2004-11-30
ES2289614T3 (en) 2008-02-01
WO2003055031A2 (en) 2003-07-03
US20050068192A1 (en) 2005-03-31
US8072348B2 (en) 2011-12-06
KR100940246B1 (en) 2010-02-04
WO2003055031A3 (en) 2003-12-11
SI1548451T1 (en) 2007-12-31
ITMI20012726A1 (en) 2003-06-20
CY1105438T1 (en) 2010-04-28
CA2471267A1 (en) 2003-07-03
BRPI0215173B1 (en) 2015-07-21
EP1548451A2 (en) 2005-06-29
PT1548451E (en) 2007-10-01
ATE319100T1 (en) 2006-03-15
JP4705755B2 (en) 2011-06-22
CA2819916C (en) 2015-09-29
JP2010148125A (en) 2010-07-01
AU2002361201A1 (en) 2003-07-09
DE60220842T2 (en) 2008-05-29
HK1075293A1 (en) 2005-12-09
US20080042874A1 (en) 2008-02-21
CN100346165C (en) 2007-10-31
EP1548451A3 (en) 2005-07-06
BRPI0215173B8 (en) 2023-02-14
CN1615442A (en) 2005-05-11
RU2004122090A (en) 2005-03-20
CA2471267C (en) 2013-09-17
SI1456676T1 (en) 2006-06-30
ES2258666T3 (en) 2006-09-01
RU2314542C2 (en) 2008-01-10
DE60220842D1 (en) 2007-08-02

Similar Documents

Publication Publication Date Title
EP1456676B1 (en) System for remote reading and control of electric energy consumption
US9282383B2 (en) Process, device and system for volt/VAR optimization
US20020120569A1 (en) System and method for communication between remote locations
US20040061625A1 (en) Electronic electric meter for networked meter reading
CN100428720C (en) ZigCcc supported method for collecting data of electric energy and device for measuring electric energy
JP2005513900A5 (en)
JPH08256384A (en) System for remotely reading electric meter
JP2009032012A (en) Power consumption automatic metering device and automatic metering system
KR20130061938A (en) Leakage and overload current detecting system of a single-phase power house in base of plc communication
PT2137497E (en) System for recording amounts of supplied media, and method for the operation thereof
KR20200130103A (en) Integrated Smart Metering System and Collection Server Therefor
JP3945179B2 (en) Energy selling method and processing device for controlling energy selling method
Arafat On possibilities of using smart meters for compulsory load shedding supported by load forecasting
JPH10111326A (en) Automatic measurement of electric power and its control method
WO2011056057A2 (en) Apparatus, method and system for measuring, monitoring and regulating the power consumed by users connected to a distribution transformer
EP1713296A1 (en) Remote managing and controlling system for supplying electric energy
JPH1021486A (en) Fee informing system
KR20000058952A (en) auto-inspection/communication united system of a meter
KR101692371B1 (en) power monitoring system by the monitoring program being upgraded in real time
Ferrara et al. Integrated system for remote meter reading and control of MV and LV networks
JP2004045311A (en) Remote meter inspection system
JP2002169862A (en) Wide-area remote collection work system

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SC SD SE SG SK SL TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LU MC NL PT SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2471267

Country of ref document: CA

Ref document number: 1020047009703

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2003555643

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 889/KOLNP/2004

Country of ref document: IN

Ref document number: 00889/KOLNP/2004

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2002796713

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 20028272005

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2004122090

Country of ref document: RU

WWE Wipo information: entry into national phase

Ref document number: 10499691

Country of ref document: US

COP Corrected version of pamphlet

Free format text: PAGE 15, DESCRIPTION, REPLACED BY CORRECT PAGE 15

WWP Wipo information: published in national office

Ref document number: 2002796713

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 2002796713

Country of ref document: EP